2 floors · 44 apartments · 55,424 sq ft · class R3 · owner of record: Woodbridge Estates Condo
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 55,424 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 7040). Agency page | Dec 31, 2030 in 1508 days | Next due 2030 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 22, 2026 | Construction CLASS - 2 WORK WITHOUT A PERMIT: ATOI, OBSERVED REAR YARD 2ND FLOOR DECK APPROXIMATELY 11 FEET 6 INCHES DEPTH CONSTRUCTED WITHOUT PERMITS AND APPROVAL FROM THE DEPARTMENT OF BUILDINGS., OBTAIN ALL PERMITS; OBTAIN ALL PER #39197264Z | Nov 18, 2026 PENDING | $1,250 |
| Jul 22, 2026 | Construction CLASS - 2 WORK WITHOUT A PERMIT: ATOI, OBSERVED REAR YARD 2ND FLOOR DECK APPROXIMATELY 11 FEET 6 INCHES DEPTH CONSTRUCTED WITHOUT PERMITS AND APPROVAL FROM THE DEPARTMENT OF BUILDINGS., OBTAIN ALL PERMITS; OBTAIN ALL PER #39197144Y | Nov 18, 2026 PENDING | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2021 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020 #10563 | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2005086 | DOB VIOLATION - ACTIVE |
| Feb 2, 2021 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00893 | DOB VIOLATION - ACTIVE |
| Nov 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01094 | DOB VIOLATION - ACTIVE |
| Aug 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01851 | DOB VIOLATION - ACTIVE |
| May 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #01851 | DOB VIOLATION - ACTIVE |
| May 1, 2014 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00717 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Nov 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
| Aug 6, 2026 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
Showing 60 of 139. Full list on the agency site.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 15, 2025 | B | Apt 9 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT NORTH WALL UNDER SINK IN THE KITCHEN LOCATED AT APT 9, 1st STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 17620755 ISSUED 14-JAN-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE C | Jun 19, 2025 |
| Jan 15, 2025 | C | Apt 9 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT 1ST DOOR FROM NORTH AT EAST IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 9, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 21, 2025 |
| Jan 15, 2025 | B | Apt 9 · § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHTUB AT UPPER LEVEL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 9, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 19, 2025 |
| Jan 15, 2025 | B | Apt 9 · § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT BATHTUB AT UPPER LEVEL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 9, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 19, 2025 |
| Jan 15, 2025 | B | Apt 9 · § 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 9, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 19, 2025 |
| Jan 15, 2025 | B | Apt 9 · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB AT UPPER LEVEL IN THE 1st BATHROOM FROM NORTH AT WEST LOCATED AT APT 9, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 19, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
| Nov 6, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 6:58 PM ET. BBL 5070407501.