Staten Island · Block 7040 · Lot 7501 · 10309

Wirt Avenue

2 floors · 44 apartments · 55,424 sq ft · class R3 · owner of record: Woodbridge Estates Condo

154open violations
$2,500ECB/OATH penalties owed
1HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 55,424 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 7040). Agency page

Dec 31, 2030
in 1508 days
Next due 2030

Open violations

ECB / OATH (2) · $2,500 owed
IssuedViolationHearingBalance
Jul 22, 2026Construction CLASS - 2
WORK WITHOUT A PERMIT: ATOI, OBSERVED REAR YARD 2ND FLOOR DECK APPROXIMATELY 11 FEET 6 INCHES DEPTH CONSTRUCTED WITHOUT PERMITS AND APPROVAL FROM THE DEPARTMENT OF BUILDINGS., OBTAIN ALL PERMITS; OBTAIN ALL PER
#39197264Z
Nov 18, 2026
PENDING
$1,250
Jul 22, 2026Construction CLASS - 2
WORK WITHOUT A PERMIT: ATOI, OBSERVED REAR YARD 2ND FLOOR DECK APPROXIMATELY 11 FEET 6 INCHES DEPTH CONSTRUCTED WITHOUT PERMITS AND APPROVAL FROM THE DEPARTMENT OF BUILDINGS., OBTAIN ALL PERMITS; OBTAIN ALL PER
#39197144Y
Nov 18, 2026
PENDING
$1,250
DOB (7)
IssuedViolationStatus
Jun 20, 2021FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020
#10563
DOB VIOLATION - ACTIVE
Apr 29, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2005086
DOB VIOLATION - ACTIVE
Feb 2, 2021FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00893
DOB VIOLATION - ACTIVE
Nov 2, 2020FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01094
DOB VIOLATION - ACTIVE
Aug 2, 2020FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01851
DOB VIOLATION - ACTIVE
May 2, 2020FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01851
DOB VIOLATION - ACTIVE
May 1, 2014FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00717
DOB VIOLATION - ACTIVE
DOB NOW Safety (139)
IssuedViolationStatus
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Nov 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active
Aug 6, 2026GHG Emissions - LL97 FTF-EN-LL97320
Active

Showing 60 of 139. Full list on the agency site.

HPD (6) · C 1 · B 5 · A 0
IssuedClassViolationCorrect by
May 15, 2025BApt 9 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT NORTH WALL UNDER SINK IN THE KITCHEN LOCATED AT APT 9, 1st STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 17620755 ISSUED 14-JAN-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CJun 19, 2025
Jan 15, 2025CApt 9 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCK AND ASSEMBLY AT 1ST DOOR FROM NORTH AT EAST IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 9, 1st STORY, 1st APARTMENT FROM NORTH AT EASTJan 21, 2025
Jan 15, 2025BApt 9 · § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT BATHTUB AT UPPER LEVEL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 9, 1st STORY, 1st APARTMENT FROM NORTH AT EASTFeb 19, 2025
Jan 15, 2025BApt 9 · § 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT BATHTUB AT UPPER LEVEL IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 9, 1st STORY, 1st APARTMENT FROM NORTH AT EASTFeb 19, 2025
Jan 15, 2025BApt 9 · § 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 9, 1st STORY, 1st APARTMENT FROM NORTH AT EASTFeb 19, 2025
Jan 15, 2025BApt 9 · § 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB AT UPPER LEVEL IN THE 1st BATHROOM FROM NORTH AT WEST LOCATED AT APT 9, 1st STORY, 1st APARTMENT FROM NORTH AT EASTFeb 19, 2025

Issued in the last 120 days

DateSourceWhatNow
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open
Nov 6, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE AN ANNUAL BUILDINGS EMISSIONS REPORT AS REQUIRED BY AD CODE SEC. 28-320.3.7 IN ACCORDANCE WITH 1 RCNY § 103-14.Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 6:58 PM ET. BBL 5070407501.

Look up another building