5 floors · 10 apartments · 4,937 sq ft · built 2022 · class C1 · owner of record: 1546-50 Jesup Ice, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 13, 2022 | Construction CLASS - 1 UNLAWFULLY CONTD WORK WHILE ON NOTICE OF SWO:ATO MY INSP OF 4STYNB I OBSERVE 4STYNB@2FL LEVEL SUPERSTRUCTURE&AFTER FURTHER REV AS PER COMPLAINT2335449 CONTRACTOR ISSUED PARTIAL SWO ONLY TO IMPLEMENT SAFETY-STOP #35650050K | Mar 17, 2023 IN VIOLATION | $5,000 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 1, 2026 | B | Apt 3B · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT DRAIN LINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 6, 2026 |
| Sep 1, 2026 | A | Apt 3B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTRECOM SYSTEM FROM BUILDING ENTRANCE TO PANEL AT SOUTH WALL IN THE FOYER LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 5, 2026 |
| Sep 1, 2026 | C | Apt 3B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 27, 2026 |
| Sep 1, 2026 | A | Apt 3B · § 27-2005 ADM CODE PROVIDE A PROPER SEAT FOR WATER CLOSET IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 5, 2026 |
| Oct 20, 2025 | B | Apt 2A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 24, 2025 |
| Oct 20, 2025 | B | Apt 2A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 24, 2025 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 1, 2026 | HPD B | § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT DRAIN LINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 1, 2026 | HPD A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL BUZZER INTRECOM SYSTEM FROM BUILDING ENTRANCE TO PANEL AT SOUTH WALL IN THE FOYER LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 1, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 1, 2026 | HPD A | § 27-2005 ADM CODE PROVIDE A PROPER SEAT FOR WATER CLOSET IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Open |
| Sep 1, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT ENTRANCE IN THE BATHROOM LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed |
| Sep 1, 2026 | HPD B | 566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF FLIES IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed |
| Sep 1, 2026 | HPD B | § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed |
| Sep 1, 2026 | HPD B | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 1:35 PM ET. BBL 2028720274.