Bronx · Block 5750 · Lot 390 · 10463

Independence Avenue

7 floors · 283,842 sq ft · built 1936 · class I6 · owner of record: 2975 Independence Avenue Llc

56open violations
$6,775ECB/OATH penalties owed
0HPD class C (immediately hazardous)
43dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 43 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 43 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-29 (Accepted). Agency page

Dec 31, 2026
in 43 days
1 of 4 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 283,842 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 164 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 164 days
Annual filing
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $472,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 460 days
No Cycle 10 report on record yet
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5750). Agency page

Dec 31, 2030
in 1504 days
Next due 2030

Open violations

ECB / OATH (5) · $6,775 owed
IssuedViolationHearingBalance
Sep 21, 2026Elevators CLASS - 2
CLASS 2:FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER PASSENGER ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-987. UPON INSPECTION, 5TH FLOOR BUTTON ON CAR STATION DEFECTIVE,REPAIR.COMPANY STICKER MISSING ON
#39204868M
Dec 4, 2026
PENDING
$625
Jul 29, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION OF THE SCHOOL. OBSERVED BROKEN WINDOWS AT MULTIPLE LOCATIONS AT EXP 1(N. ELEV) AND EXP 3(S. ELEV). REMEDY: REPAIR AND/OR REP
#35730622R
Oct 30, 2026
IN VIOLATION
$2,500
Mar 4, 2025Unknown CLASS - 1
I OBSERVED UNSAFE UNSUITABLE CONDITION ,TEMPORARY CAMLOCK WIRING BEEN USED AS PERMANENT WIRING FEEDING BUILDING (SCHOOL) ACROSS THE PARKING LOT, MOST OF WIRING WAS BURIED ALONG THE PERIMETER OF THE PARKING LOT
#39140387L
Sep 18, 2026
IN VIOLATION
$1,600
Mar 4, 2025Unknown CLASS - 2
I OBSERVED TEMPORARY CAMLOCK WIRING FEEDING BUILDING ACROSS THE PARKING LOT WITHOUT A TEMPORARY ELECTRICAL PERMIT ON FILE., OBTAIN PERMIT; OBTAIN ELECTRICAL PERMIT
#39140388N
Mar 2, 2026
IN VIOLATION
$800
Apr 11, 2024Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #908862. REMEDY: SUBMIT ACCEPTABLE REQU
#37028004M
Aug 2, 2024
IN VIOLATION
$1,250
DOB (4)
IssuedViolationStatus
Aug 2, 2023FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00331
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#08809
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#08810
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#22160
DOB VIOLATION - ACTIVE
DOB NOW Safety (47)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction
Active
Sep 25, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 2, 2023Benchmarking - LL84 FTF-EN-BENCH
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of CorrectionOpen
Sep 25, 2026DOB SafetyAEUHAZ: Open
Sep 21, 2026ECBElevators: CLASS 2:FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER PASSENGER ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-987. UPON INSPECTION, 5TH FLOOR BUTTON ON CAR STATION DEFECTIVE,REPAIR.COMPANY STICKER MISSING ONOpen
Jul 29, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. NOTED: AT TIME OF INSPECTION OF THE SCHOOL. OBSERVED BROKEN WINDOWS AT MULTIPLE LOCATIONS AT EXP 1(N. ELEV) AND EXP 3(S. ELEV). REMEDY: REPAIR AND/OR REPOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 18, 2026, 8:48 PM ET. BBL 2057500390.