class G7 · owner of record: Juan Emilio Jaramillo
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 12, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED: SUPPORTED SCAFFOLD IN PLACE AT EXPO# 1 AND 2 NOT MAINTAINED UNSAFE THROUGHOUT, LOSE PLANKS MISSING GUARDRAILS, NO SCREW JACKS MISSING SAFETY PIN FOR COUPLING CONNECTOR CONTRARY T #39560465Z | Dec 22, 2026 PENDING | $2,500 |
| Oct 12, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED: CMU WALL BLOCK ERECTED AT 3RD FL. LEVEL CONTRACTOR FAILURE TO SAFEGUARD ADJOINING PROPERTY, NO MEANS OF ROOF PROTECTION. CREATING UNSAFE HAZARDOUS CONDITION FOR ADJOINING OCCUPIE #39560466K | Dec 22, 2026 PENDING | $2,500 |
| Oct 12, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED: SCAFF-TRAC MATERIAL HOIST INSTALLED ON TOP OF SUPPORTED SCAFFOLD AT EXPO# 1. UPON REQUEST FOR DESIGN DRAWINGS NONE WAS PROVIDED. CREATING AN UNSAFE CONDITION, NO SUPERVISION, NO #39560468Y | Dec 22, 2026 PENDING | $1,250 |
| Oct 12, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED: TEMPORARY SHORING INSTALLED AT 1ST. AND 2ND FLOOR AS STRUCTURAL REINFORCEMENT NO SHOWING ON APPROVED DRAWING. CREATING AN UNSAFE CONDITION, NO SUPERVISION, NO SAFETY MONITORING, #39560467M | Dec 22, 2026 PENDING | $1,250 |
| Sep 10, 2026 | Construction CLASS - 2 THE R-VALUE OF THE INSTALLED FOUNDATION WALLS OUTBOARD INSULATION IS R-VALUE 7.5 WITH THICKNESS 1.5" CONTRARY WITH THE APPROVED DOB EN DRAWING AND ARCHITECTURAL DRAWING THAT INDICATE R-VALUE 15 WITH THICKNESS 3 #39203553N | Nov 17, 2026 PENDING | $1,250 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 12, 2026 | ECB | Unknown: AT TIME OF INSPECTION OBSERVED: SUPPORTED SCAFFOLD IN PLACE AT EXPO# 1 AND 2 NOT MAINTAINED UNSAFE THROUGHOUT, LOSE PLANKS MISSING GUARDRAILS, NO SCREW JACKS MISSING SAFETY PIN FOR COUPLING CONNECTOR CONTRARY T | Open |
| Oct 12, 2026 | ECB | Unknown: AT TIME OF INSPECTION OBSERVED: CMU WALL BLOCK ERECTED AT 3RD FL. LEVEL CONTRACTOR FAILURE TO SAFEGUARD ADJOINING PROPERTY, NO MEANS OF ROOF PROTECTION. CREATING UNSAFE HAZARDOUS CONDITION FOR ADJOINING OCCUPIE | Open |
| Oct 12, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED: SCAFF-TRAC MATERIAL HOIST INSTALLED ON TOP OF SUPPORTED SCAFFOLD AT EXPO# 1. UPON REQUEST FOR DESIGN DRAWINGS NONE WAS PROVIDED. CREATING AN UNSAFE CONDITION, NO SUPERVISION, NO | Open |
| Oct 12, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED: TEMPORARY SHORING INSTALLED AT 1ST. AND 2ND FLOOR AS STRUCTURAL REINFORCEMENT NO SHOWING ON APPROVED DRAWING. CREATING AN UNSAFE CONDITION, NO SUPERVISION, NO SAFETY MONITORING, | Open |
| Sep 10, 2026 | ECB | Construction: THE R-VALUE OF THE INSTALLED FOUNDATION WALLS OUTBOARD INSULATION IS R-VALUE 7.5 WITH THICKNESS 1.5" CONTRARY WITH THE APPROVED DOB EN DRAWING AND ARCHITECTURAL DRAWING THAT INDICATE R-VALUE 15 WITH THICKNESS 3 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 5:02 AM ET. BBL 4034320047.