3 floors · 15 apartments · 13,203 sq ft · built 2021 · class C1 · owner of record: Brooklyn North Housing Development Fund Corporation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 51 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 67 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 295 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1147 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 29, 2021 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED PLANS/SCAFFOLD AT TIME OF INSPECTIONOF AN ACTIVE NEW BUILDING OBSERVED THAT THE SUPPORTED SCAFFOLD ERECTEDAT EXP#2,#3,#4 INSIDE THE JOBSITE WAS NOT ERECTED ACCORDING TO APPROVE #35642101L | May 11, 2022 IN VIOLATION | $625 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 11, 2026 | A | Apt 1D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 15, 2026 |
| Sep 11, 2026 | A | Apt 1D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 15, 2026 |
| Sep 11, 2026 | A | Apt 1D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Dec 15, 2026 |
| Feb 9, 2026 | C | Apt 2E · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 7, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 11, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 11, 2026 | HPD A | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Sep 11, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 11, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH, VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Closed |
| Aug 11, 2026 | HPD C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SELF LOCKING HANDLE ASSEMBLY AT WEST BULKHEAD DOOR- NO RE-ENTRY FROM ROOF INTO BUILDING | Closed |
| Aug 11, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE 1ST DOOR AT NORTH LEADING TO NORTH YARD AT PUBLIC HALL, 1st STORY | Closed |
| Aug 11, 2026 | HPD C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SELF LOCKING HANDLE ASSEMBLY AT EAST BULKHEAD DOOR- NO RE-ENTRY FROM ROOF INTO BUILDING | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 10, 2026, 8:12 AM ET. BBL 3039560059.