Bronx · Block 2261 · Lot 20 · 10454

East 134th Street

class V1 · owner of record: 496 E 134 Llc

3open violations
$47,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
—no dated deadlines found

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

We couldn't find building attributes for this lot, so no deadlines are listed.

Open violations

ECB / OATH (12) · $47,500 owed
IssuedViolationHearingBalance
Sep 21, 2026Unknown CLASS - 1
OBSERVED 5 STORY NB WITH JERSEY BARRIERS AT EXP 1 & 2 FOR PEDESTRIAN WALKWAY. AT TIME OF INSPECTION PEDESTRIAN WALKWAY NOT MAINTAINED AS PER MANUFACTURER SPECIFICATIONS. BARRIERS WERE NOT FILLED WITH SAND/WATER
#39559391R
Dec 4, 2026
PENDING
$2,500
Sep 21, 2026Unknown CLASS - 1
OBSERVED 5 STORY NB WITH JERSEY BARRIERS AT EXP 1 & 2 FOR PEDESTRIAN WALKWAY. AT TIME OF INSPECTION UPON RESEARCH NO DOT PERMIT WAS POSTED FOR TEMPORARY WALKWAY. NO PERMIT IS UNSAFE, IT POSES LACK OF OVERSITE
#39559393K
Dec 4, 2026
PENDING
$5,000
Sep 21, 2026Unknown CLASS - 1
OBSERVED 5 STORY NB WITH JERSEY BARRIERS AT EXP 1 & 2 FOR PEDESTRIAN WALKWAY. AT TIME OF INSPECTION TEMP PEDESTRIAN WALKWAY NOT MAINTAINED AS PER CODE. WALKWAY CLOSED OFF AT EXP 1,PUTTING PEDESTRIANS IN ROADWAY
#39559392Z
Dec 4, 2026
PENDING
$5,000
Aug 5, 2026Unknown CLASS - 1
AT THE TIME OF INSPECTION, I OBSERVED WORKERS ARE USING PIPE SCAFFOLDING CONTRARY TO 3314.1 PIPE SCAFFOLDING FAILURE TO MAINTAIN TOE BROAD, FULLY PLANK, DEBRIS NETTING, GUARDRAILS. CREATING A HAZARDOUS CONDITIO
#39557580R
Dec 4, 2026
$5,000
Aug 5, 2026Construction CLASS - 2
5-STORY NB, ACTIVE JOBSITE STUCCO OPERATION IN PROGRESS USING SUPPORTED PIPE SCAFFOLDING, I ALSO OBSERVED STUCCO RESIDUE AND DEBRIS IN PEDESTRIANS WALKWAY AND FLYING IN AIR AND ON CARS, FAILURE TO CONTAIN AIRBO
#39557582K
Dec 4, 2026
$5,000
Aug 5, 2026Unknown CLASS - 2
AT THE TIME OF INSPECTION OF A 5-STORY BUILDING, ACTIVE STUCCO OPERATION EXTERIOR OF BUILDING, WITH MATERIALS, WORKERS, OFFICE BOOTS OBSTRUCTION PEDESTRIANS WALKWAY, THERE WAS NO WARNING SIGNS, PERSONNEL, AND B
#39557583M
Dec 4, 2026
$2,500
Aug 5, 2026Construction CLASS - 1
5-STORY NB TOPPED OFF, ACTIVE SITE I OBSERVED AT ROADWAY THAT PLASTIC JERSEY BARRIERS WERE NOT MAINTAINED IN ACCORDANCE WITH BC 3301.1.3 THE BARRIERS WERE NOT PROPERLY FILLED WITH WATER OR SAND, DAMAGES OBSERVE
#39557581Z
Dec 4, 2026
$2,500
Jun 4, 2026Unknown CLASS - 2
3307.2.1 OBSTRUCTION OF STREETS OR SIDEWALKS. I OBSERVED AT AN ACTIVE 5-STORY NB. EXPOSURE ONE: FULL ROADWAY CLOSURE CAUSED BY AN ONGOING HOISTING OPERATION. NO REQUIRED FULL ROADWAY PERMITS WERE FOUND UPON SEA
#39555049N
Mar 2, 2027
$2,500
Jun 4, 2026Unknown CLASS - 1
DURING MY INSPECTION OF AN ACTIVE 5- STORY NB. I OBSERVED A SUPPORTED SCAFFOLD FACADE OPERATION AT EXPOSURE 2 WITH SCAFFOLD PLATFORMS APPROXIMATELY 8" AWAY FROM THE FACADE, CREATING A LARGE GAP. 3301.2 SAFETY
#39555047J
Mar 2, 2027
$5,000
Apr 8, 2026Construction CLASS - 1
AT THE TIME OF INSPECTION OF A FIVE STORY BUILDING AT FOUNDATION PHASE. I OBSERVED INADEQUATE SUPPORT OF EXCAVATION AT EXPOSURE 1 CREATING A COLLAPSE OR CAUGHT IN-BETWEEN HAZARD. SUPPORT THE EXCAVATION AS REQUI
#39552794J
Feb 19, 2027
$5,000
Apr 8, 2026Construction CLASS - 1
I OBSERVED A 5 STORY BUILDING IN FOUNDATION PHASE WITH THE SUPPORT OF EXCAVATION MISSING GUARDRAILS AT EXPOSURE 1 TO PREVENT WORKERS FROM FALLING APPROXIMATELY 6 TO 8 FEET INTO THE EXCAVATION SITE, ONTO METAL R
#39552793H
Feb 19, 2027
$5,000
Apr 8, 2026Unknown CLASS - 2
I OBSERVED PLASTIC TRAFFIC BARRICADES IN USE AT EXPOSURES 1 AND 2 CONTRARY TO MANUFACTURERS SPECIFICATIONS. SOME BARRICADES WERE TIPPED OVER OBSTRUCTING THE PEDESTRIAN WALKWAY. INTERLOCKING DEVICES WERE MISSING
#39552792X
Feb 19, 2027
$2,500
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 21, 2026ECBUnknown: OBSERVED 5 STORY NB WITH JERSEY BARRIERS AT EXP 1 & 2 FOR PEDESTRIAN WALKWAY. AT TIME OF INSPECTION PEDESTRIAN WALKWAY NOT MAINTAINED AS PER MANUFACTURER SPECIFICATIONS. BARRIERS WERE NOT FILLED WITH SAND/WATEROpen
Sep 21, 2026ECBUnknown: OBSERVED 5 STORY NB WITH JERSEY BARRIERS AT EXP 1 & 2 FOR PEDESTRIAN WALKWAY. AT TIME OF INSPECTION UPON RESEARCH NO DOT PERMIT WAS POSTED FOR TEMPORARY WALKWAY. NO PERMIT IS UNSAFE, IT POSES LACK OF OVERSITEOpen
Sep 21, 2026ECBUnknown: OBSERVED 5 STORY NB WITH JERSEY BARRIERS AT EXP 1 & 2 FOR PEDESTRIAN WALKWAY. AT TIME OF INSPECTION TEMP PEDESTRIAN WALKWAY NOT MAINTAINED AS PER CODE. WALKWAY CLOSED OFF AT EXP 1,PUTTING PEDESTRIANS IN ROADWAYOpen
Aug 5, 2026ECBUnknown: AT THE TIME OF INSPECTION, I OBSERVED WORKERS ARE USING PIPE SCAFFOLDING CONTRARY TO 3314.1 PIPE SCAFFOLDING FAILURE TO MAINTAIN TOE BROAD, FULLY PLANK, DEBRIS NETTING, GUARDRAILS. CREATING A HAZARDOUS CONDITIOClosed
Aug 5, 2026ECBConstruction: 5-STORY NB, ACTIVE JOBSITE STUCCO OPERATION IN PROGRESS USING SUPPORTED PIPE SCAFFOLDING, I ALSO OBSERVED STUCCO RESIDUE AND DEBRIS IN PEDESTRIANS WALKWAY AND FLYING IN AIR AND ON CARS, FAILURE TO CONTAIN AIRBOClosed
Aug 5, 2026ECBUnknown: AT THE TIME OF INSPECTION OF A 5-STORY BUILDING, ACTIVE STUCCO OPERATION EXTERIOR OF BUILDING, WITH MATERIALS, WORKERS, OFFICE BOOTS OBSTRUCTION PEDESTRIANS WALKWAY, THERE WAS NO WARNING SIGNS, PERSONNEL, AND BClosed
Aug 5, 2026ECBConstruction: 5-STORY NB TOPPED OFF, ACTIVE SITE I OBSERVED AT ROADWAY THAT PLASTIC JERSEY BARRIERS WERE NOT MAINTAINED IN ACCORDANCE WITH BC 3301.1.3 THE BARRIERS WERE NOT PROPERLY FILLED WITH WATER OR SAND, DAMAGES OBSERVEClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 10, 2026, 1:41 PM ET. BBL 2022610020.

Look up another building