1 floors · 15,740 sq ft · built 1933 · class K1 · owner of record: 20 Bruckner, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2025 | CONSTRUCTION WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. NOTED: AT TIME OF INSPECTION - APPRX A 19' CURB-CUT OBSERVED AT FRONT OF PREMISES. CONTRARY TO BUILDING CONVERSION UNDER ALT 1 APPLICATION # 220641562 WHICH REMOVED DRIVEWAY NECESSITY & REFLECT A STANDARD CURB. #25-00467 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 22, 2026 | ECB | Construction: I OBSERVED WASTEWATER EFFLUENT OVERFLOWING FROM THE PROPERTY OUT ONTO THE PUBLIC STREET. THIS IS NOT CODE COMPLIANT AS PER PC: 102.3, REPAIR AND/OR REPLACE | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 6:11 PM ET. BBL 2023080006.