class V0 · owner of record: Pifr Ave D Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 3, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED INADEQUATE HOUSEKEEPING CONSTRUCTION DEBRIS AND MATERIAL OBSTRUCTION PATHWAY TO THE ROOF LEVEL AND EGRESS. CREATES TRIPPING HAZARDS STOP ALL WORK ENTIRE SITE MAINTAIN HOUSEKEEPING #39558790J | Nov 18, 2026 PENDING | $1,250 |
| Sep 3, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED WORKERS IN PROCESS OF INSTALLING STUCCO AT EXTERIOR FACADE EXP#1STYROFOAM FLYING/ABORNE ALL OVER ON ADJ PROPERTY PUBLIC PATHWAY ROADWAY WATERWAY CREATES UNSAFE HAZARD FOR PUBLIC T #39558789M | Nov 18, 2026 PENDING | $5,000 |
| Sep 3, 2026 | Construction CLASS - 1 INADEQUATE SAFETY MEASURES WORKERS IN PROCESS OF INSTALLING STUCCO AT EXTERIOR FACADE EXP#1 IMPROPERLY TIED OFF POINT, STANDING ON UNSAFE ELEVATED SURFACES. PLYWOOD NOT SECURED ONTOP METAL FRAMING WITH STACKS O #39558788K | Nov 18, 2026 PENDING | $10,000 |
| Jun 11, 2026 | Construction CLASS - 2 BC 3301.1.3 AT TIME OF INSPECTION, A YODOCK BARRIER SYSTEM WAS OBSERVED WITH MISSING INTERLOCKING COUPLERS THROUGHOUT AND BARRIERS NOT ALL FILLED WITH WATER OR SAND AS REQUIRED. THIS CONDITION CREATES A SAFETY #39555382R | Oct 14, 2026 IN VIOLATION | $1,250 |
| Jun 11, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION OF THE PROPOSED FOUR-STORY, SEVEN-FAMILY BUILDING, MATERIALS WERE OBSERVED STORED ON THE THIRD FLOOR WITHOUT A REQUIRED GUARDRAIL SYSTEM. THIS CONDITION PRESENTS A FALL HAZARD TO WORKE #39555385M | Mar 30, 2027 | $5,000 |
| May 20, 2026 | Unknown CLASS - 1 AT THE TIME OF MY INSPECTION OF A 3 STORY NEW BUILDING, I OBSERVED 3 WORKERS INSIDE OF JOBSITE USING CORE DRILL AND 12 INSTALLING SIDEWALK SHED, UPON REQUEST FOR CONSTRUCTION SUPERINTENDENT OR ALTERNATE/ COMPET #39554402K | Mar 1, 2027 | $5,000 |
| May 20, 2026 | Site Safety CLASS - 1 AT THE TIME OF MY INSPECTION OF A 3 STORY NEW BUILDING, I OBSERVED 3 WORKERS INSIDE OF JOBSITE USING CORE DRILL AND 12 INSTALLING SIDEWALK SHED, UPON REQUEST FOR APPROVED CONSTRUCTION DOCUMENTS, NONE WAS PRESEN #39554401Z | Mar 1, 2027 | $2,500 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 3, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED INADEQUATE HOUSEKEEPING CONSTRUCTION DEBRIS AND MATERIAL OBSTRUCTION PATHWAY TO THE ROOF LEVEL AND EGRESS. CREATES TRIPPING HAZARDS STOP ALL WORK ENTIRE SITE MAINTAIN HOUSEKEEPING | Open |
| Sep 3, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED WORKERS IN PROCESS OF INSTALLING STUCCO AT EXTERIOR FACADE EXP#1STYROFOAM FLYING/ABORNE ALL OVER ON ADJ PROPERTY PUBLIC PATHWAY ROADWAY WATERWAY CREATES UNSAFE HAZARD FOR PUBLIC T | Open |
| Sep 3, 2026 | ECB | Construction: INADEQUATE SAFETY MEASURES WORKERS IN PROCESS OF INSTALLING STUCCO AT EXTERIOR FACADE EXP#1 IMPROPERLY TIED OFF POINT, STANDING ON UNSAFE ELEVATED SURFACES. PLYWOOD NOT SECURED ONTOP METAL FRAMING WITH STACKS O | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)