5 floors · 162,400 sq ft · built 1932 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 162,400 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 434 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2233). Agency page | Dec 31, 2033 in 2626 days | Next due 2033 |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-19 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 19, 2026 | Construction CLASS - 2 REISSUE #35691808X DATE OF ISSUE: 02/24/2025. FAILURE TO MAINTAIN BUILDING WALLS(S) OR APPURTENANCES AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 5TH FLOOR ROOF LEVEL BULKHEAD AT STAIR B, STAIR C AND STAIR E #35728687P | Mar 10, 2026 POP/IN-VIO | $0 |
| Feb 19, 2026 | Construction CLASS - 2 REISSUE #35691807Y DATE OF ISSUE: 02/24/25. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT ROOF LEVEL 5TH FLOOR STAGNANT WATER AROUND DRAIN BROKEN PIPE LEAKING TO LOWER FLOOR. REMEDY: REPAIR AND/OR R #35728688R | Mar 10, 2026 POP/IN-VIO | $0 |
| Feb 19, 2026 | Construction CLASS - 2 REISSUE #35691809H DATE OF ISSUE: 02/24/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGESAND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION #35728686N | Mar 10, 2026 POP/IN-VIO | $0 |
| Feb 24, 2025 | Construction CLASS - 2 REISSUE: 35676166H-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ROOF DRAIN IS CLOGGED. REMEDY: COMPLY WITH CODE. #35691807Y | Apr 30, 2025 POP/IN-VIO | $0 |
| Feb 24, 2025 | Construction CLASS - 2 REISSUE: 35676167J-FAILURE TO MAINTAIN BUILDING WALL(S) ON APPURTENANCES. NOTED: OBSERVED AT BULKHEAD. STWY B MULTIPLE CRACKS AT DOOR. REMEDY: COMPLY WITH CODE. #35691808X | Apr 30, 2025 POP/IN-VIO | $0 |
| Feb 24, 2025 | Construction CLASS - 2 REISSUE: 35676160R-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. EXIT LIGHTS ARE NOT WORKING PROPERLY THROUGHOUT. REM #35691809H | May 1, 2025 POP/IN-VIO | $0 |
| Feb 22, 2024 | Construction CLASS - 2 REISSUE#35676191J-FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCESNOTED:OBSERVED AT BULKHEAD FOR STWY B BY ROOF DOOR,MULTIPLE STEP CRACKS AROUND THE DOOR FRAME & WALLS.AT BULKHEAD FOR STWY C MULTIPLE STEP-C #35676167J | Apr 22, 2024 POP/IN-VIO | $0 |
| Feb 22, 2024 | Construction CLASS - 2 REISSUE#35676193N-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:OBSERVED AT VARIOUS LOCATIONS THROUGHOUT THE 5 STOR #35676160R | Apr 22, 2024 POP/IN-VIO | $0 |
| Feb 22, 2024 | Construction CLASS - 2 REISSUE#35676192L-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:OBSERVED AT ROOF LEVEL,ROOF DRAIN IS CLOGGED AND IS NOT ALLOWING WATER TO DRAIN DOWN.THERE IS CURRENTLY A PUDDLE OF WATER APPROX.3"( #35676166H | Apr 22, 2024 POP/IN-VIO | $0 |
| Jun 13, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. AT 5TH FLOOR ROOF LEVEL BULKHEAD AT STAIR B CRACKS BY DOOR, ROOF STAIR C STEP CRACKS AND PARAPET WALL WITH CRACKS 3 FLOOR GYM FAN ROOM STAIR WELL TO ROOF C #35676191J | Nov 2, 2023 POP/IN-VIO | $0 |
| Jun 13, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT ROOF LEVEL 5TH FLOOR STAGNANT WATER AROUND DRAIN, BROKEN PIPE LEAKING TO LOWER FLOR. REMEDY: REPAIR AND/OR REPLACE #35676192L | Nov 2, 2023 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
None open.