1 floors · 1,552 sq ft · built 1931 · class K1 · owner of record: Azim Group Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 794 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 12, 2026 | Construction CLASS - 2 WORK WITHOUT A PERMIT. VACATE ORDER #B525/25 AND DOB VIOLATION #V110925CER02JM ISSUED FOR BUILDING DAMAGE INCLUDING SECTION OF THE ROOF, ROOF MEMBERS AND CELLING DUE TO FIRE AND FIREFIGHTING OPERATION AT ADJOIN #39177100Y | Apr 22, 2026 ADMIT/IN-VIO | $0 |
| Jan 7, 2025 | Construction CLASS - 2 THE INSPECTION REVEALED THAT UNPERMITTED CONSTRUCTION WORK WAS TAKING PLACE IN THE FIRST-FLOOR BATHROOM. THIS INCLUDED THE INSTALLATION OF PLUMBING SYSTEMS FOR WATER, WASTE, AND VENTING RELATED TO BOTH A LABORA #39134701J | Mar 19, 2025 DEFAULT | $3,125 |
| Apr 19, 2011 | Plumbing CLASS - 2 INSTALLATION OF PLUMBING MATERIALS EQUIPMENTS PER PC 102.3 27-902 OBSERVED IN REAR OF RESTAURANT BACKYARD 2 SINKS CONNECTED TO LEADER LINE FOR STORM WATER SINK SHOULD BE CONNECTED TO SANITARY DRAINAGE PIPING RE #34895512P | Nov 14, 2011 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 9, 2025 | CONSTRUCTION STRUCTURE RENDERED NON COMLIANT DUE TO FIRE , AT REAR DAMAGE TO CEILIN GS , KITCHEN AREA AND ROOF PARTIALLY OPEN TO THE LEMENTS DUT TO FIRE A T ADJACENT PROPERTY THE STRUTURE MUST BE MAINTAIN IN A CODE COMPLIANT MANNER #CER02JM | DOB VIOLATION - ACTIVE |
| Mar 10, 2011 | CONSTRUCTION STOP ALL WORK MAKE SITE SAFE CONTACT DOB #0101WG | DOB VIOLATION - ACTIVE |
| Mar 10, 2011 | CONSTRUCTION STOP ALL WORK, MAKE SITE SAFE CONTACT DOB #0102WG | DOB VIOLATION - ACTIVE |
| Jan 19, 2011 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ISSUED A 15 DAY LETTER OF INTENT TO REVOK E APPL#320074496 ON 01-07-11 REMEDY; STOP ALL WORK MAKE SITE SAFE, CONTACT DOB #0101WG | DOB VIOLATION - ACTIVE |
| Dec 10, 2010 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ISSUED A 15 DAY LETTER OF INTENT TO REVOKE APPL#320068083 ON 12-7-10. WORK 100% COMPLETE REMEDY; STOP ALL WORK, MAKE SITE SAFE CONTACT DOB #0101WG | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 12:50 PM ET. BBL 3025220046.