Brooklyn · Block 3184 · Lot 60 · 11221

991 Willoughby Avenue

10 floors · 36 apartments · 35,993 sq ft · built 2007 · class D7 · owner of record: 102 Mews Llc

4open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
47dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 47 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page

Feb 21, 2027
in 99 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 35,993 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Jul 26, 2022Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES.AS NOTEDAT TIME OF INSPECTION I OBSERVED ON EXPOSURE#1 WILLOUGHBY AVENUE ELEVATION(EAST ELEV):FLOWER BOXES HANGING ON 4TH FLOOR BALCONY RAILS WITH S
#35663884J
Aug 28, 2023
IN VIOLATION
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (3) · C 1 · B 0 · A 2
IssuedClassViolationCorrect by
May 20, 2026A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORYAug 23, 2026
May 20, 2026A§27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMAAug 23, 2026
Jan 24, 2020CApt 5D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM NORTH AT EASTFeb 14, 2020

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 2:59 PM ET. BBL 3031840060.