4 floors · 17,000 sq ft · built 1994 · class N2 · owner of record: Nyc Department Of Homeless Services
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 43 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-04 (Accepted). Agency page | Dec 31, 2026 in 43 days | 1 of 1 without an accepted 2026 report yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 27, 2024 | Construction CLASS - 1 OBSERVED AT EXPOSURE 1 AND EXPOSURE 4 MULTIPLE CRACKS AT FACADE. ALSO I OBSERVED AT 3RD WINDOW SCREEN WEDGED BETWEEN WALL AND FIRE ESCAPE, ALSO OBSERVED WINDOW SCREEN DISLODGED FROM WINDOW ALSO AT 3RD FLOOR., R #39117868R | Jul 27, 2024 POP/IN-VIO | $0 |
| Jun 27, 2024 | Construction CLASS - 1 UNLAWFUL ACTS: FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 39110057L ISSUED ON 03/27/2024 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01., COMPL #39117867P | Jul 27, 2024 POP/IN-VIO | $0 |
| Mar 27, 2024 | Construction CLASS - 1 MULTIPLE CRACKS WERE FOUND ON THE FACADE AND WINDOW LENTELS THROUGHOUT THE BUILDING., REPAIR AND/REPLACE #39110057L | May 29, 2024 POP/IN-VIO | $0 |
| Feb 27, 2023 | Construction CLASS - 2 OBSERVED CORRODED GAS PIPING INSTALLED TO THE BOILERS LOCATED IN THE BOILERS., REPAIR AND/OR REPLACE #39080445Z | Mar 27, 2023 POP/IN-VIO | $0 |
| Feb 27, 2023 | Construction CLASS - 2 OBSERVED RESIDENTIAL GAS FLEX ON COMMERCIAL COOKING EQUIPMENT. AS PER FGC 411.1 RIGID METALLIC PIPE AND FITTINGS SHALL BE USED., REPAIR AND/OR REPLACE #39080444R | Mar 27, 2023 POP/IN-VIO | $0 |
| Feb 21, 2023 | Boilers CLASS - 2 CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION. #39079964M | Feb 27, 2023 POP/IN-VIO | $0 |
| May 13, 2022 | Construction CLASS - 2 NOTED: OBSERVED VERTICAL AND HORIZONTAL CRACKS THROUGHOUT EXPOSURE #1,2,3 AND 4, BULGING AND MISSING CEMENT STUCCO AT REAR EXPOSURE 3 AT VARIOUS LOCATIONS., MAINTAIN EXTERIOR BUILDING WALL #39062115R | Jun 8, 2022 POP/IN-VIO | $0 |
| May 13, 2022 | Construction CLASS - 2 NOTED: OBSERVED IN UNIT 4-A A 2FT. X 2FT OPENING IN CEILING, SPALLING PLASTER AROUND STAIR WINDOWS AND ROOF SKYLIGHT, DUE TO WATER DAMAGE PENETRATING FROM ROOF., REPAIR AND/OR REPLACE #39062116Z | Jun 8, 2022 POP/IN-VIO | $0 |
| May 13, 2022 | Construction CLASS - 2 NOTED: ROOFING MATERIAL HAS BECOME POROUS ALLOWING WATER TO ENTER INTO UNIT 4-A AND AROUND ROOF SKYLIGHT AND AROUND STAIR WINDOWS., REPAIR AND/OR REPLACE #39062117K | Jun 8, 2022 POP/IN-VIO | $0 |
| Apr 12, 2022 | Boilers CLASS - 2 EXTERMINATOR NEEDED@BLR/LIGHT DEFECT/ILLEGAL DRAFT INDUCER@BASE OF MASONRY CHIMNEY/LOUVER@WALL OF BLR ROOM TO NEXT ROOM/#1 HWH INCORRECT DRAFT HOOD+FLUE DAMPER/INCORRECT SAFETY DISCHARGE@HWH'S/HOT WATER STORAGE #39060078H | Apr 19, 2022 POP/IN-VIO | $0 |
| Nov 16, 2021 | Construction CLASS - 2 NOTED: ROOF MATERIAL HAS BECOME POROUS ALLOWING WATER TO PENETRATE INTO UNIT 4A., REPAIR AND/OR REPLACE #39051196Y | Dec 14, 2021 POP/IN-VIO | $0 |
| Nov 16, 2021 | Construction CLASS - 2 NOTED: OBSERVED AT EXPOSURE #3(REAR)VERTICAL CRACKS AND BULGING CEMENT STUCCO ABOVE WINDOWS, AT EXPOSURE #1 AND #4, CRACKS THROUGH BRICKS AT VARIOUS LOCATIONS AT WINDOW CORNERS AND BETWEEN FLOORS., MAINTAIN EXT #39051194K | Dec 14, 2021 POP/IN-VIO | $0 |
| Nov 16, 2021 | Construction CLASS - 2 NOTED: OBSERVED IN UNIT 4A, CEILING HAS A 2FT. X 2FT. OPENING IN GYPSUM FIRE RATED BOARD, DAMAGED DUE TO WATER PENETRATION, ALSO WATER DAMAGE AT ROOF BULKHEAD AROUND SKYLIGHT AND STAIRWELL BETWEEN FLOORS 3 AND #39051195M | Dec 14, 2021 POP/IN-VIO | $0 |
| Aug 26, 2019 | Construction CLASS - 2 NOTED: OBSERVED AT REAR EXPOSURE #3, VERTICAL CRACKS AND BULGING CEMENT STUCCO UNDER CORNER ROW OF WINDOWS OF THE "A" SIDE FROM THE FIRST FLOOR UP TO THE FOURTH FLOOR., MAINTAIN EXTERIOR BUILDING WALL #39008849Z | Sep 5, 2019 POP/IN-VIO | $0 |
| Mar 7, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES; NOTED: OBSERVEDAT REAR OF BUILDING "A" VERTICAL AND HORIZONTAL CRACKS UNDER CORNER ROW OF WINDOWS, FROM LINTEL TO UNDER WINDOW SILLS ON FLOORS 1,2,3.ALSO #35383808L | Jul 1, 2019 POP/IN-VIO | $0 |
| Jun 29, 2018 | Boilers CLASS - 2 AS PER CLASS 2 (B254) 28-301.1. FAILURE TO MAINTAIN. 50)RELIEF VALVES ON WATER HEATERS NOT TO BE BLACK IRON PIPE TO BE APPROVED MATERIAL ONLY. CORRECT CONDITIONS AND SUBMIT CERTIFICATE OF CORRECTION. #32096109L | Nov 5, 2018 POP/IN-VIO | $0 |
| Feb 5, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED: OBSERVED AT REAR OF PROPERTY OF THE "A" SIDE. VERTICAL AND HORIZONTAL CRACKS IN CEMENT STUCCO UNDERNEATH AND AT THE CORNERS OF EACH WINDOW FROM FLOO #35298037X | May 21, 2018 POP/IN-VIO | $0 |
| Feb 24, 2017 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE-COMPLIANT MANNER.NOTED:AT REAR ADJACENT TO CELLAR RAMP,CRACKED AND BULGING CEMENT COATING OVER 2ND FLR LINTEL,CRACKS CONTINUE 1ST THRU 3RD FLR.REM:COMPLY WITH NOTICE OF VIOLATIO #35228755R | Mar 27, 2017 POP/IN-VIO | $0 |
| Apr 26, 2016 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG CODE COMPLIANT. NOTED: @ REAR ADJACENT TO CELLAR RAMP, CRACKED & BULGING CEMENT COATING OVER 2ND FLR LINTEL. CRACKS CONTINUE 1ST TO 3RD FLR INCLUDING 3RD FLR SILL. REM: COMPLY W/ CODE, #35177910K | Jul 18, 2016 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #39682 | DOB VIOLATION - ACTIVE |