Brooklyn · Block 2107 · Lot 1 · 11217

99 Rockwell Place

4 floors · 42,000 sq ft · built 1930 · class W9 · owner of record: Discalced Inc.

7open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
62dto Annual boiler inspection (2 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-03-18 (Accepted). Agency page

Dec 31, 2026
in 62 days
2 of 2 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 42,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 183 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 183 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1158 days
Next cycle year 2029

Open violations

ECB / OATH (0)

None open.

DOB (4)
IssuedViolationStatus
Dec 1, 2024FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2401158
DOB VIOLATION - ACTIVE
May 2, 2024FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00845
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#02834
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#28618
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Oct 28, 2026GHG Emissions - LL97 FTX-EN-LL97320
FAILURE TO COMPLY WITH ANNUAL BUILDING EMISSIONS LIMIT AS PER AD CODE SEC. 28-320.3
Active
Dec 1, 2024Energy Grade - LL33 FTP-EN-EGRDEA
Active
May 2, 2024Benchmarking - LL84 FTF-EN-BENCH
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 28, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO COMPLY WITH ANNUAL BUILDING EMISSIONS LIMIT AS PER AD CODE SEC. 28-320.3Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 11:45 PM ET. BBL 3021070001.

Look up another building