3 floors · 2 apartments · 6,449 sq ft · built 2015 · class S2 · owner of record: Malakhov, Rakhmin
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 66 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-31 (Accepted). Agency page | Dec 31, 2026 in 66 days | 2 of 2 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 16, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS #39090491Z ISSUED ON 07/19/2023 BY BADGE#3255., FILE A CERTIFICATE OF CORRECTION #39151210J | Oct 6, 2026 DEFAULT | $6,250 |
| Jun 7, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATIONS # 039090491Z ISSUED ON 07/19/2023, AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1 RCNY 102-01(D)(2)., FILE A CERTI #39116286M | Oct 15, 2024 DEFAULT | $3,125 |
| Jul 19, 2023 | Construction CLASS - 1 BUILDING IS OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. AT TIME OF INSPECTION, OBSERVED, THE BUILDING BASEMENT IS OCCUPIED AS AN OFFICE FOR PHARMACY & MEDICINE DELIVERY HOUSE WITHOUT CO/ PERMIT. THE JOB# #39090491Z | Sep 24, 2024 IN VIOLATION | $2,500 |
| Sep 12, 2017 | Site Safety CLASS - 1 FAILURE TO DESIGNATE AND OR HAVE CONSTRUCTION SUPERINTENDENT PRESENT AT SITE AS REQUIRED NOTE:AT THE TIME OF MY INSPECTION OF A 4 STORY BUILDING AT ROOF LEVEL CONSTRUCTION WORK IN PROGRESS.UPON REQUEST FOR DESI #35288953M | Jun 12, 2018 IN VIOLATION | $5,000 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 12:13 AM ET. BBL 4021070050.