2 floors · 9,000 sq ft · built 1939 · class P9 · owner of record: Center For Islamic Studies Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1142 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 17, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.ATOI,GENERAL CONTRACTORFAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION#39550471X.REM #39553129Y | Jun 23, 2026 DEFAULT | $6,250 |
| Apr 17, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.ATOI,GENERAL CONTRACTORFAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION#39550475N.REM #39553123N | Jun 23, 2026 DEFAULT | $6,250 |
| Apr 16, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.ATOI,GENERAL CONTRACTORFAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION#39550477R.REM #39553076J | Jun 23, 2026 DEFAULT | $6,250 |
| Apr 16, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.ATOI,GENERAL CONTRACTORFAILED TO FILE A CERTIFICATE OF CORRECTION FOR VIOLATION#39550476P.REM #39553082X | Jun 23, 2026 DEFAULT | $6,250 |
| Feb 17, 2026 | Unknown CLASS - 1 OBSERVED STORAGE/ PLACEMENT OF STRUCTURAL STEEL I-BEAMS ON CMU WALLS NOT REFLECTED ON APPROVED PLANS TO VERIFY LOADS CAPACITY FOR PLACEMENT OF LOADS. CONTRARY TO BC 3305.3.1.1 STOP ALL WORK AT EXTERIOR EXTENSIO #39550476P | Dec 3, 2026 PENDING | $5,000 |
| Feb 17, 2026 | Construction CLASS - 2 OBSERVED: GC FAILED TO MAINTAIN AND PRODUCE SUPERINTENDENT LOG BOOKS,APPROVED SITE SAFETY PLAN, WORKER ORIENTATIONS, WORKER PRE-SHIFT MEETING. STOP ALL WORK UNDER PERMIT Q01016127PROVIDE ALL REQUIRED DOCUMENT #39550450R | Dec 3, 2026 | $1,250 |
| Feb 17, 2026 | Unknown CLASS - 2 CONSTRUCTION SUPERINTENDENT 025203 FAILED TO PERFORM INSPECTIONS, MAINTAIN RECORD KEEPING OF UNSAFE & DEVIATIONS OF CONSTRUCTION OPERATIONS/ PERFORM DUTIES #39550470Y | Dec 3, 2026 | $5,000 |
| Feb 17, 2026 | Unknown CLASS - 1 OBSERVED MAKE-SHIFT STRUCTURAL STEEL AND FIELD CONNECTIONS INSTALLED BC 2205.6.2; THE STRUCTURAL STEEL CONSISTED OF TORCH CUTS, DRILLING, AND COPING FOR CONNECTING ELEMENTS. NO PE DESIGN DRAWINGS FOR FIELD FABR #39550472H | Dec 3, 2026 PENDING | $5,000 |
| Feb 17, 2026 | Unknown CLASS - 1 OBSERVED EXTENSION AT EXTERIOR WITH WORK BELOW GRADE WITH CMU WALLS NOT REFLECTED ON PLANS, BRACING FOR CONCRETE WALLS DEVIATING FROM APPROVED PLANS. CONTRARY TO BC 3301.6 NO PE ASSESSMENT REPORT NOR FILED PAA #39550475N | Dec 3, 2026 PENDING | $5,000 |
| Feb 17, 2026 | Unknown CLASS - 1 OBSERVED WORKERS STANDING ON THE LEADING EDGE OF EXTENSION EXTERIOR WORK APPROX. 8 FEET IN DEPTH, AREA WITH SNOW & ICE, BROKEN & MISSING GUARDRAILS, WORKERS W/OUT NO FALL PROTECTION, AND MULTIPLE DISLODGED CMU #39550477R | Dec 3, 2026 PENDING | $5,000 |
| Feb 17, 2026 | Construction CLASS - 1 OBSERVED PARTIAL STRUCTURE REMOVED, NO LATERAL SUPPORT FOR WALLS, & INSTALL OF STRUCTURAL STEEL COLUMNS AT MULTIPLE LOCATIONS DEVIATING FROM APPROVED PLANS, AND NO PE ASSESSMENT REPORT. STOP ALL WORK ON THE ENT #39550471X | Dec 3, 2026 PENDING | $5,000 |
| Issued | Violation | Status |
|---|---|---|
| Feb 25, 2026 | CONSTRUCTION EMERGENCY: CNA REPORT DATE 02/18/26: EARTHWORK UNSTABLE; REAR GARAGES POTENTIALLY COMPROMISED. WALL SURCHARGE & DEBRIS. ACTION NEEDED REMEDY / REQUIREMENTS: BACKFILL/STABILIZE SITE. HIRE RDP, CS & GC SUBMIT DOCS BY 02/27/26. DAILY REPORTS & PERMITS REQ. FILE IN 2 DAYS #CE41301NH | DOB VIOLATION - ACTIVE |
| Jun 18, 2025 | CONSTRUCTION MONITORNG-POTENTAL HAZARDOUS CONDITON CREATD2BLDG DURNG HOROZONTAL EXT ENSION WRK.THE LACK OF SHORING BRACE @ CORNER OF EXP#1&2 HAS.COMPROMSD EXISTNG STRUCTURE.CAUSING SURCHARGES 2 NEW PIN ON EXST BLDG. REMEDY: RETAIN NYS RDP 2DEVELOP MONITORNG PLANS W REPORTNG CRITERIA ASSESSMENT OF MONITORNG DATA #CE41301NH | DOB VIOLATION - ACTIVE |
| Jun 18, 2025 | CONSTRUCTION EMERGNCY WRK-HAZARDUS CONDITN CREATD 2 BLDG DURNG HORIZONTAL EXTENSION WRK. LACK OF SHORING BRACE @ CORNR OF EXP#1&2 HAS.COMPROMSED EXISTING STRUCTURE. CAUSING SURCHARGES TO NEW PIN ON EXISTING BUILDING. REMEDY: BACKFILL THE CORNER OF EXP#1&2 WHERE THE LAGGING IS UNBRACED & WEDGED BEHIND NEW PINS.RE #CE41302NH | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 13) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 24, 2026 | ECB | Construction: OBSERVED: SITE CLOSED UPON EXTERIOR INSPECTION NOTED FENCE DOES NOT COMPLETED PAINTED GREEN HUNTER AND PANEL VIEW NOT MAINTAINED PROPER SIZE AND FORM CONTRARY TO BUILDING CODE | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 2:58 PM ET. BBL 4108540046.