6 floors · 67 apartments · 74,300 sq ft · built 1961 · class D4 · owner of record: Sherwood Village Coop 'A' Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 74,300 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1948). Agency page | Dec 31, 2028 in 801 days | Next due 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-14 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 22, 2026 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.AT TIME OF INSPECTION,I OBSERVED A MISSING SIDEWALK SHEDFROM EXP#3 AS PER APPROVED DRAWINGS.THIS CREATES OVERHEAD HAZARDOUS CO #39554506P | Feb 23, 2027 | $2,500 |
| May 22, 2026 | Construction CLASS - 2 PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS.AT TIME OF INSPECTION,I OBSERVED SIDEWALK SHEDS IN PLACE AT EXPOSURE#1 AND EXPOSURE#4,MISSING CAPS FROM THE BOLTS.THIS CREATES SHARP EDGES.CAUSING HAZARDO #39554507R | Jul 28, 2026 IN VIOLATION | $2,400 |
| May 15, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT GARAGE LEVEL MASONRY SLAB ON FLOOR SHIFTED AND CRACKED AT VARIOUS LOCATIONS THROUGHOUT. REM: SUBMIT ENGINEERS REPORT/REPAIR AND/OR REPLACE. #35322825Y | Jul 3, 2018 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01181 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 21, 2011 | A | Apt 6E · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6E, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH | Feb 24, 2012 |
| Nov 21, 2011 | C | Apt 6E · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 6E, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH | Nov 27, 2011 |
| Oct 27, 2011 | B | Apt 6E · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 6E, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH | Dec 1, 2011 |
| Oct 27, 2011 | B | Apt 6E · SECTION 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE KITCHEN LOCATED AT APT 6E, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH | Dec 1, 2011 |
| Oct 27, 2011 | B | Apt 6E · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6E, 6th STORY, 4th APARTMENT FROM EAST AT SOUTH | Dec 1, 2011 |
| May 12, 2010 | B | Apt 6C · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 16, 2010 |
| May 12, 2010 | B | Apt 6C · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 16, 2010 |
| May 12, 2010 | C | SECTION 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM ... | May 18, 2010 |
| Apr 26, 2010 | B | Apt 6C · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | May 31, 2010 |
| Apr 26, 2010 | B | Apt 6C · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | May 31, 2010 |
| Apr 26, 2010 | B | Apt 6C · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | May 31, 2010 |
| Apr 26, 2010 | C | SECTION 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM ... | May 2, 2010 |
| Aug 14, 2008 | A | Apt 6C · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL & CEILING 6 STY APT 6C SOUTHWEST ROOM WEST WALL & CEILING ABOVE WINDOW. , SECTION '' '' | Nov 17, 2008 |
| Aug 14, 2008 | B | Apt 4F · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGS SOUTHEAST & SOUTHWEST ROOMS 4 STY SOUTH APT 4F. , SECTION '' '' | Sep 18, 2008 |
| Aug 14, 2008 | A | Apt 6C-SOU · D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTHWALL, 6 STY NORTH WEST APT 6C-SOUTH WEST ROOM. , SECTION '' '' | Nov 17, 2008 |
| Jul 27, 2007 | B | Apt 3F · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Aug 31, 2007 |
| Jul 27, 2007 | B | Apt 3F · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Aug 31, 2007 |
| Jan 5, 2001 | B | Apt 6E · SECTION 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK FROM THE CEILING NEAR THE WINDOW IN THE 1st ROOM FROM EAST LOCATED AT APT 6E, 6th STORY, APARTMENT AT SOUTH | Feb 14, 2001 |
| Jun 25, 1996 | C | Apt 6F · SECTION 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK FRONT ROOM CEILING 6 STY APT 6F ER1. , SECTION '' '' | Jul 15, 1996 |
| Jun 25, 1996 | B | Apt 6F · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 6 STY APT 6F FRONT ROOM. , SECTION '' '' | Aug 12, 1996 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 1:39 AM ET. BBL 4019480001.