6 floors · 28,500 sq ft · built 1931 · class I9 · owner of record: Myrtle Ave Family Center
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2022-07-18 (Accepted). Agency page | Dec 31, 2026 in 63 days | 1 of 1 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 28,500 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 794 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 9, 2026 | Unknown CLASS - 2 ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED ON THE 4TH FL INSTALLATION OF 2 HUNG 30 AMP ELECTRICAL HEATERS WITH NEW CONDUITS, DISCONNECT SW AND BREAKERS INSTALLED. CHECKED BIS / DOB NOW NO PERMIT ON FILE ALL WOR #39207473L | Dec 16, 2026 PENDING | $1,250 |
| Oct 9, 2026 | Unknown CLASS - 2 FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS. OBSERVED IN THE CELLAR THE BUILDING MAIN WATER GROUND CLAMP IS RUSTED AND OXIDIZED ALSO THE WATER METER JUMPER IS SHOWING THE SAME. ALL CLAMPS AND LU #39207474N | Dec 16, 2026 PENDING | $2,400 |
| Aug 10, 2026 | Elevators CLASS - 2 CLASS 2: 1. HOIST MACHINE OIL LEAK OBSERVED AT MACHINE BASE. AS PER ASME A17.1 8.6. REMEDY: IDENTIFY SOURCE AND CORRECT LEAK; CLEAN AFFECTED AREA. 2. TOP FLOOR BRAILLE TAGS NOT PROVIDED AT LANDING. AS PER ADA 7 #39199925X | Oct 21, 2026 PENDING | $625 |
| Jul 1, 2026 | Construction CLASS - 2 OBSERVED AT BASEMENT ELECTRIC METER RM. WITH STORAGE OF MULTIPLE ITEMS FANS, SHELVES, SCREENS ETC., REPAIR AND/OR REPLACE; COMPLY WITH CODE #39194431N | Sep 9, 2026 DEFAULT | $3,155 |
| Oct 21, 2025 | Construction CLASS - 2 OBSERVED IN BASEMENT AN ACTIVE LEAK ON WASTE LINE. ON THE 5TH FLOOR IN THE BATHROOM USING PLASTIC PIPING ON WASTE LINE UNDER THE SINK. SPRINKLER PIPING ON THE ROOF GOING THROUGH THE WALL HAS NO FIRE STOP. SPRIN #39164226R | Feb 18, 2026 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 8, 2025 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 9, 2026 | ECB | Unknown: ELECTRICAL WORK WITHOUT A PERMIT. OBSERVED ON THE 4TH FL INSTALLATION OF 2 HUNG 30 AMP ELECTRICAL HEATERS WITH NEW CONDUITS, DISCONNECT SW AND BREAKERS INSTALLED. CHECKED BIS / DOB NOW NO PERMIT ON FILE ALL WOR | Open |
| Oct 9, 2026 | ECB | Unknown: FAILURE TO PROVIDE ADEQUATE GROUNDING OF ELECTRICAL SYSTEMS. OBSERVED IN THE CELLAR THE BUILDING MAIN WATER GROUND CLAMP IS RUSTED AND OXIDIZED ALSO THE WATER METER JUMPER IS SHOWING THE SAME. ALL CLAMPS AND LU | Open |
| Aug 10, 2026 | ECB | Elevators: CLASS 2: 1. HOIST MACHINE OIL LEAK OBSERVED AT MACHINE BASE. AS PER ASME A17.1 8.6. REMEDY: IDENTIFY SOURCE AND CORRECT LEAK; CLEAN AFFECTED AREA. 2. TOP FLOOR BRAILLE TAGS NOT PROVIDED AT LANDING. AS PER ADA 7 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 7:57 AM ET. BBL 3017570025.