Bronx · Block 2447 · Lot 60 · 10456

985 Morris Avenue

1 floors · 4,900 sq ft · built 1931 · class M9 · owner of record: Eternal Sacred Order Of

3open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
67dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 67 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Nov 19, 2020CONSTRUCTION
COMISSIONER S ORDER FOR CORRECTVE ACTIONS. NOTED: FOLLOWING CONDITIONS ARE TO BE RESTORED IMMEDIATELY, RESTORE PUBLIC RIGHTWAY ALONG MORRIS AVENUE SIDE OF BUILDING TO PREVIOUS LEGAL CONDITIONS, REMOVE OBSTRUCTION.
#20-01567
DOB VIOLATION - ACTIVE
Nov 19, 2020CONSTRUCTION
WORK WITHOUT A PERMIT. NOTED: WOODEN STRUCTURE INSTALLED ON SIDEWALK ON MORRIS AVE SIDE AND ATTACHED TO BUILDING AND FULLY ENCLOSED APROX 20 FEET WIDE AND 40 FEET LONG TO PROVIDE ADDITIONAL SEATING TO EXISTING EATING AND DRINKING ESTABLISHMENT. 100% WORK COMPLETED. ALSO OBSERVED, 6 HEATER, 30 LIGHTS
#20-01568
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 4)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 10:59 AM ET. BBL 2024470060.

Look up another building