4 floors · 107,562 sq ft · built 1924 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 107,562 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2747). Agency page | Dec 31, 2027 in 434 days | Next due 2027 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-29 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 24, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: EMERGENCY ILLUMINATED DISCHARGE EXIT SIGNS NOT WORKING WHEN TEST #35734828K | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 REISSUE ON ECB #35725791H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: MISSING FIRESTOPPING AT SEVERAL LOCATIONS IN ELECTRIC SWITCH GEAR ROOM AT BASEMENT #35734825P | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: EMERGENCY EXTERIOR EXIT DOOR NOT SELF-CLOSING DUE TO BINDING, MISSING AND/OR FAULTY HARDWARE AT EXIT 6 STREEY LEVEL (1)DOOR, EXIT 5 STREET LEVEL (2)DOORS, EXIT 3 STREET LEVEL #35734827Z | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: INSTALLATION OF ILLEGAL HARDWARE KICK STOPS ON FIRE RATED AND EXTERIOR AND SMOKE #35734829M | Aug 14, 2026 POP/IN-VIO | $0 |
| Jul 24, 2026 | Construction CLASS - 2 REISSUE ON ECB #35725190K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE RATED CLASSROOM AND SMOKE DOORS NOT SELF-CLOSING DUE TO BINDING, MISSING AND/OR FAULTY HARDWARE ON CLASSROOMS 415A, #35734826R | Aug 14, 2026 POP/IN-VIO | $0 |
| Sep 2, 2025 | Construction CLASS - 2 RE-ISSUE #35676343J. FAILURE TO MAINTAIN. NOTED: AT 5TH FLR-STAIR G 'ROOM 502", STAIR G", ROOM 315. INTERIOR CLASSROOM DOORS DO NOT SELF-CLOSE PROPERLY ON 5TH FLR-514, 510, 509, 507, 501, 502 AND "STAIRCASE B". #35725190X | Oct 31, 2025 POP/IN-VIO | $0 |
| Sep 2, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRESTOPPINGPER BC 712.3; 27-345. NOTED: DURING INSPECTION OBSERVED FIRESTOPPING MISSING IN SEVERAL LOCATIONS IN ELECTRICAL METER ROOM. REMEDY: PROVIDE/ #35725191H | Oct 31, 2025 POP/IN-VIO | $0 |
| Jul 19, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT 5TH FLOOR STAIR G, ROOM 502, 4TH FLOOR SLOP SINK ROOM BY STAIR G, 3RD FLOOR WOMEN'S RESTROOM BY STAIR D, GIRLS RESTROOM BY 312, STAIR G, ROOM 315 #35676343J | Oct 20, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06036 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #06035 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 24, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: EMERGENCY ILLUMINATED DISCHARGE EXIT SIGNS NOT WORKING WHEN TEST | Open |
| Jul 24, 2026 | ECB | Construction: REISSUE ON ECB #35725791H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NO FIRE STOPPING PER BC 712.3; 27-345. NOTED: MISSING FIRESTOPPING AT SEVERAL LOCATIONS IN ELECTRIC SWITCH GEAR ROOM AT BASEMENT | Open |
| Jul 24, 2026 | ECB | Construction: EXIT DOOR NOT SELF-CLOSING. NOTED: EMERGENCY EXTERIOR EXIT DOOR NOT SELF-CLOSING DUE TO BINDING, MISSING AND/OR FAULTY HARDWARE AT EXIT 6 STREEY LEVEL (1)DOOR, EXIT 5 STREET LEVEL (2)DOORS, EXIT 3 STREET LEVEL | Open |
| Jul 24, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. USE OF PROHIBITED DOOR AND/OR HARDWARE PER BC 1008.1.8; 27-371(J). NOTED: INSTALLATION OF ILLEGAL HARDWARE KICK STOPS ON FIRE RATED AND EXTERIOR AND SMOKE | Open |
| Jul 24, 2026 | ECB | Construction: REISSUE ON ECB #35725190K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: FIRE RATED CLASSROOM AND SMOKE DOORS NOT SELF-CLOSING DUE TO BINDING, MISSING AND/OR FAULTY HARDWARE ON CLASSROOMS 415A, | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 8:50 PM ET. BBL 2027470001.