Brooklyn · Block 6129 · Lot 64 · 11209

9802 3 Avenue

2.5 floors · 3 apartments · 3,198 sq ft · built 1901 · class C0 · owner of record: Huliaris, Kiriakos

6open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
68dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 68 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 84 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 312 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 799 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (6) · C 1 · B 3 · A 2
IssuedClassViolationCorrect by
Aug 26, 2026AApt BASEME · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT OBSERVED AT CEILING IN THE BATHROOM LOCATED AT APT BASEME, 1st APARTMENT FROM SOUTH AT WESTNov 29, 2026
Aug 26, 2026BApt BASEME · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE COMPOSITE FLOOR TILES IN THE 3rd ROOM FROM EAST LOCATED AT BSMT-APT BASEME, 1st BSMT-APT FROM SOUTH AT WESTSep 30, 2026
Aug 26, 2026BApt BASEME · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE COMPOSITE FLOOR TILES IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT BSMT-APT BASEME, 1st BSMT-APT FROM SOUTH AT WESTSep 30, 2026
Aug 26, 2026BApt BASEME · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE COMPOSITE FLOOR TILES IN THE KITCHEN LOCATED AT BSMT-APT BASEME, 1st BSMT-APT FROM SOUTH AT WESTSep 30, 2026
Aug 26, 2026AApt BASEME · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM EAST, THE 4th ROOM FROM EAST AT SOUTH, THE 3rd ROOM FROM EAST LOCATED AT APT BASEME, 1st APARTMENT FROM SOUTH AT WESTNov 29, 2026
Aug 26, 2026CApt BASEME · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR HINGES AT ENTRANCE LOCATED AT BSMT-APT BASEME, 1st BSMT-APT FROM SOUTH AT WESTSep 9, 2026

Issued in the last 120 days

DateSourceWhatNow
Aug 26, 2026HPD A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT OBSERVED AT CEILING IN THE BATHROOM LOCATED AT APT BASEME, 1st APARTMENT FROM SOUTH AT WESTOpen
Aug 26, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE COMPOSITE FLOOR TILES IN THE 3rd ROOM FROM EAST LOCATED AT BSMT-APT BASEME, 1st BSMT-APT FROM SOUTH AT WESTOpen
Aug 26, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE COMPOSITE FLOOR TILES IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT BSMT-APT BASEME, 1st BSMT-APT FROM SOUTH AT WESTOpen
Aug 26, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE COMPOSITE FLOOR TILES IN THE KITCHEN LOCATED AT BSMT-APT BASEME, 1st BSMT-APT FROM SOUTH AT WESTOpen
Aug 26, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM EAST, THE 4th ROOM FROM EAST AT SOUTH, THE 3rd ROOM FROM EAST LOCATED AT APT BASEME, 1st APARTMENT FROM SOUTH AT WESTOpen
Aug 26, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR HINGES AT ENTRANCE LOCATED AT BSMT-APT BASEME, 1st BSMT-APT FROM SOUTH AT WESTOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 6:45 AM ET. BBL 3061290064.

Look up another building