Brooklyn · Block 248 · Lot 15 · 11201

98 Montague Street

12 floors · 187,200 sq ft · built 1909 · class H9 · owner of record: Bossert Propco, Llc

157open violations
$6,250ECB/OATH penalties owed
21HPD class C (immediately hazardous)
51dto Annual boiler inspection (4 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 51 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-11-15 (Accepted). Agency page

Dec 31, 2026
in 51 days
4 of 4 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 187,200 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 172 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 172 days
Annual filing
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $2,987,416 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 468 days
No Cycle 10 report on record yet
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 248). Agency page

Dec 31, 2028
in 782 days
Next due 2028
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1147 days
Next cycle year 2029

Open violations

ECB / OATH (9) · $6,250 owed
IssuedViolationHearingBalance
Apr 2, 2026Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION I OBSERVED CRACKED/DAMAGED MASONRY ELEMENTS AT EXPOSURE #1 NORTH ELEVATION, EXPOSURE #2 WEST ELEVATION, EXPOSURE #3 SO
#35729678H
Mar 25, 2027
PENDING
$5,000
Dec 30, 2024Construction CLASS - 2
NO UNDERSIDE LIGHTING. AT THE TIME OF MY INSPECTION OF A SIDE WALK SHED ERECTIONS PROVIDED TO PROTECT THE SAFETY OF MEMBERS OF THE PUBLIC AND PEDESTRIANS, I OBSERVED NO UNDERSIDE LIGHTING WERE PROVIDED TO PRO
#39535493L
Dec 8, 2025
IN VIOLATION
$0
Jan 16, 2024Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B AND 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#909125.AGG1:PRIOR NOV 37022410K UNDER 28
#37026124H
Apr 10, 2024
DEFAULT
$0
Jun 20, 2023Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING FACADE OR APPURTENANCES.NOTE:AT THE TIME OF INSPECTION OBSERVED AT EXPO#1 NORTH ELEVATION CRACKED,SPALLING TERRA COTTA STONE EXPO#2 EAST ELEVATION SPALLING STUCCO.REM:MAINTAIN EXTER
#35674355H
Oct 6, 2023
IN VIOLATION
$0
Apr 28, 2023Construction CLASS - 1
FAILURE TO MAINTAIN EXTERIOR BUILDING FACADES AND APPURTENANCES.NOTED:AT TIME OF INSPECTION.CRACKED TERRA COTTA AND DECORATIVE MASONRY STOVEAT EXPOSURES#1,#2,#3 AND #4 AT MULTIPLE LOCATIONS.ALSO OBSERVED SPALLI
#35670795N
Jan 19, 2024
IN VIOLATION
$0
Oct 27, 2022Construction CLASS - 2
AT THE TIME OF MY INSPECTION OF A 15 STORY BUILDING, I OBSERVED SIDEWALK SHED IN PLACE AT EXPOSURE #1,3 AND 4 DID A SEARCH IN B I S WHICH ALERTED ME THAT SIDEWALK SHED PERMIT HAS BEING EXPIRED FORM 04-16-2022.
#39508277N
Mar 1, 2023
IN VIOLATION
$1,250
Aug 31, 2022Construction CLASS - 2
I OBSERVED SIDEWALK SHED IN PLACE AT EXP. #1,3,4 WITH AN EXPIRED PERMIT DATE: 04-16-2022, ALL THE LIGHT BULBS ARE WORKING. FAILURE TO RENEW SIDEWALK SHED PERMIT CREATES A HAZARD FOR PUBLIC AND PROPERTY.COMPLY W
#39505801R
Jan 4, 2023
ADMIT/IN-VIO
$0
Jul 8, 2022Construction CLASS - 2
TEMPORARY CONSTRUCTION EQUIPMENT ONSITE-(SWS)EXPIRED PERMIT.OBSERVED SIDEWALK SHED ERECTED AT EXPOSURE#1,3,&4.TEMPORARY CONSTRUCTION EQUIPMENT REQUIRES A PERMIT AT ALL TIMES TO REMAIN INSTALLED.UPON REVIEW OF D
#35586345Y
Dec 7, 2022
ADMIT/IN-VIO
$0
Oct 8, 2021Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8B & 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#909125. REMEDY: FILE ACCEPTABLE REPORT.
#37022410K
Apr 13, 2022
ADMIT/IN-VIO
$0
DOB (39)
IssuedViolationStatus
Aug 25, 2026CONSTRUCTION
EMERGENCY WORK ORDER DUE TO THE FOLLOWING CONDITIONS. CRACK/LOOSE STONES AT SOUTH EAST CORNER AT EXPOSURE 3 SOUTH ELEVATION LOWER AND UPPER FLOOR. REMEDY: IMMEDIATELY PROVIDE EXTENSION OF SIDEWALK SHED UNDER NYC LICENSED DESIGN PROFESSIONAL. CORNER OF EXPOSURE 3 AND EXPOSURE 3
#SR0203NS
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#08207
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
#00312
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
#00311
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
#01121
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#08208
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
#01122
DOB VIOLATION - ACTIVE
Dec 1, 2024FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2401005
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
#01187
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
#00325
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
#01188
DOB VIOLATION - ACTIVE
Sep 23, 2024HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
#00326
DOB VIOLATION - ACTIVE
Jun 23, 2024FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
#00705
DOB VIOLATION - ACTIVE
Dec 1, 2023FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2301031
DOB VIOLATION - ACTIVE
Oct 4, 2023FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#01463
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
#02501
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
#01047
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
#02502
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
#03630
DOB VIOLATION - ACTIVE
Jun 30, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
#03631
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
#00119
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
#01329
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
#02564
DOB VIOLATION - ACTIVE
Jun 20, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
#00120
DOB VIOLATION - ACTIVE
May 1, 2023IMMEDIATE EMERGENCY
PROVIDE APPROXIMATELY 400' LINEAR STREET OF SIDEWALK SHED TOTAL.WHICH INCLUDES 80'LINEAR FETET AT EXPOSURE#1 NORTH(MONTAGUE STREET)90'LINEAR FEET AT EXPOSURE#3-SOUTH (REMSEN STREET)AND 220'LINEAR FEET EXPOSURE#4 WEST ( HICK STREET)
#17588
DOB VIOLATION - ACTIVE
Apr 28, 2023CONSTRUCTION
EMERGENCY WORK ORDER DUE TO THE IMMEDIATE HAZARD POSED BY CRACKE TERRA COTTA &CRACKED DECORATIVE STONE @ NORTH ELEVATION EXP#1 SOUTH ELEVATED EXP#3&WEST ELEVATIONEXP#4 REMEDY:OWNER TO IMMEDIATELY PROVIDE SAFETY MEASURES@ NORTH SOUTH& EASTELEV.MAKE IMMEDIATE REPAIRS UNDER SUPERV OF LICENSE PROFESSION
#LLFA03JF
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
#01618
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
#01617
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
#00467
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
#00466
DOB VIOLATION - ACTIVE
Apr 22, 2023FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
#00525
DOB VIOLATION - ACTIVE
Dec 1, 2022FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2201025
DOB VIOLATION - ACTIVE
Aug 21, 2022FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)
#00494
DOB VIOLATION - ACTIVE
Dec 1, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2102093
DOB VIOLATION - ACTIVE
Jul 23, 2021ELEVATOR

#9027/705181
DOB VIOLATION - ACTIVE
Feb 8, 2021HAZARDOUS CONDITION (FACADE)
CYCLE 9B UNSAFE REPORT FILED
#909239
DOB VIOLATION - ACTIVE
Feb 8, 2021HAZARDOUS CONDITION (FACADE)
CYCLE 8B UNSAFE REPORT FILED
#809238
DOB VIOLATION - ACTIVE
Mar 16, 2020HIGH PRESSURE BOILER
VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
#00495
DOB VIOLATION - ACTIVE
Mar 16, 2020HIGH PRESSURE BOILER
VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION
#00494
DOB VIOLATION - ACTIVE
DOB NOW Safety (72)
IssuedViolationStatus
Jun 15, 2026AEUHAZ FTC-AEU-HAZ
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Active
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Report
Active
Dec 1, 2024Energy Grade - LL33 FTP-EN-EGRDEA
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Active
Sep 23, 2024Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Jun 23, 2024Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Dec 1, 2023Energy Grade - LL33 FTP-EN-EGRDEA
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 4, 2023AEUHAZ FTC-AEU-HAZ
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 30, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Active
Jun 20, 2023Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active

Showing 60 of 72. Full list on the agency site.

HPD (37) · C 21 · B 6 · A 10
IssuedClassViolationCorrect by
May 5, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 8, 2026
Jun 10, 2025A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Sep 13, 2025
May 14, 2025C§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE WATER SUPPLY PIPE AT SPRINKLER MAIN CONTROL VALVE AT BASEMENTMay 20, 2025
May 14, 2025C§ 27-2005, 2050 HMC: PROVIDE AN ADEQUATE SUPPLY OF WATER FOR THE WET SPRINKLER AND/OR STANDPIPE SYSTEM AT BASEMENT FOR ENTIRE BUILDINGMay 20, 2025
May 14, 2025CApt 1012 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES ... IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WESTMay 20, 2025
May 14, 2025CApt 1012 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES ... IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WESTMay 20, 2025
May 14, 2025C§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING AT PUBLIC HALL, 10th STORYMay 20, 2025
Apr 21, 2025B§ 27-2038 ADM CODE PROVIDE ADEQUATE LIGHTING FOR LIGHT FIXTURES AT CEILING OF INCANDESCENT LIGHTING OF 40 WATTS EACH AT PUBLIC HALL, 10th STORYMay 26, 2025
Apr 21, 2025CApt 1012 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES NO VOLUME AT ALL WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM NORTH AT EASTApr 27, 2025
Apr 21, 2025CApt 1012 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES LIGHT FIXTURE AT CEILING IN THE KITCHEN LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM NORTH AT EASTApr 27, 2025
Apr 21, 2025CApt 1012 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES NO VOLUME AT ALL WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM NORTH AT EASTApr 27, 2025
Apr 21, 2025B§ 27-2038 ADM CODE PROVIDE ADEQUATE LIGHTING FOR LIGHT FIXTURES AT CEILING OF INCANDESCENT LIGHTING OF 40 WATTS EACH AT PUBLIC HALL, 1st STORYMay 26, 2025
Apr 18, 2025CApt 1012 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES LIGHT FIXTURE AT.CEILING IN THE KITCHEN LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM NORTH AT EASTApr 24, 2025
Apr 18, 2025CApt 1012 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM NORTH AT EASTApr 18, 2025
Apr 18, 2025CApt 1012 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM NORTH AT EASTApr 24, 2025
Apr 22, 2024BApt 1012 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES ... IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WESTMay 27, 2024
Apr 22, 2024BApt 1012 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES .. IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WESTMay 27, 2024
Apr 16, 2024AApt 1012 · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WESTJul 20, 2024
Apr 11, 2024A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 15, 2024
Feb 26, 2024CApt 1012 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES ... IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WESTMar 3, 2024
Feb 26, 2024CApt 1012 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES ... IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WESTMar 3, 2024
Feb 26, 2024CApt 1012 · § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WESTFeb 26, 2024
Feb 20, 2024CApt 1012 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES IN BATHROOM AND KITCHEN IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''south'', AT WESTFeb 26, 2024
Feb 20, 2024CApt 1012 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES IN BATHROOM AND KITCHEN IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''south'', AT WESTFeb 26, 2024
Feb 20, 2024CApt 1012 · § 27-2028, 2032 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FROM AN APPROVED CENTRAL HEATING SYSTEM, OR AN APPROVED SYSTEM OF GAS OR ELECTRICAL HEATING IN GOOD OPERATING CONDITION FOR THE DWELLING UNIT IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTIOFeb 19, 2024
Feb 5, 2024CApt 1012 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES BATHROOM AND KITCHEN IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''South'', AT WESTFeb 11, 2024
Feb 5, 2024CApt 1012 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTHFeb 3, 2024
Feb 5, 2024CApt 1012 · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT BATHROOM AND KITCHEN IN THE ENTIRE APARTMENT LOCATED AT APT 1012, 10th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''South'', AT WESTFeb 11, 2024
Mar 24, 2023A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jun 27, 2023
Mar 1, 2022A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jun 4, 2022
Apr 12, 2021A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 16, 2021
Nov 14, 2019BApt 1113 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). ( MISSING ) IN THE ENTIRE APARTMENT LOCATED AT APT 1113, 11th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 19, 2019
Nov 12, 2019CApt 1113 · § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .. IN THE ENTRANCE LOCATED AT APT 1113, 11th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 3, 2019
Nov 12, 2019BApt 1113 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). ( MISSING ) IN THE ENTIRE APARTMENT LOCATED AT APT 1113, 11th STORY, 2nd APARTMENT FROM EAST AT SOUTHDec 17, 2019
Sep 28, 2017A§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX SIGN MISSING AT WALL AT PUBLIC HALL, 1st STORYJan 1, 2018
Sep 28, 2017A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYJan 1, 2018
Sep 28, 2017A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORYJan 1, 2018

Issued in the last 120 days

DateSourceWhatNow
Sep 16, 2026DOBIMMEDIATE EMERGENCY: INSTALL APPROXIMATELY 20LF OF SIDEWALK SHED AT EXPOSURE #2 SOUTH-EAST ELEVATIONClosed
Aug 25, 2026DOBCONSTRUCTION: EMERGENCY WORK ORDER DUE TO THE FOLLOWING CONDITIONS. CRACK/LOOSE STONES AT SOUTH EAST CORNER AT EXPOSURE 3 SOUTH ELEVATION LOWER AND UPPER FLOOR. REMEDY: IMMEDIATELY PROVIDE EXTENSION OF SIDEWALK SHED UNDER NYC LICENSED DESIGN PROFESSIONAL. CORNER OF EXPOSURE 3 AND EXPOSURE 3Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 10, 2026, 4:03 AM ET. BBL 3002480015.

Look up another building