16 floors · 233 apartments · 232,000 sq ft · built 1966 · class D1 · owner of record: Shalimar Leasing Limited Partnership
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 232,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $21,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 487 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1918). Agency page | Dec 31, 2028 in 801 days | Next due 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 16, 2026 | Construction CLASS - 2 ECB VIOLATION ISSUED FOR FAILURE TO FILE A FINAL INSPECTION OR SIGNED OFF PERMITTED WORK WITH DOB. ATOI OBSERVED, BALCONY SLAB EDGE RESTORATION AND FACADE WORK APPEARED COMPLETED WITH JOB APPLICATION # Q0085621 #39208152P | Dec 22, 2026 PENDING | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| May 15, 2007 | ELEVATOR #94444203363 | DOB VIOLATION - ACTIVE |
| Apr 19, 2000 | ELEVATOR #9444/421134 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 10, 2025 | C | Apt 16D · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 16D, 14th STORY, 1st APARTMENT FROM EAST AT SOUTH | Nov 7, 2025 |
| Sep 4, 2025 | B | Apt 15C · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 1st ROOM FROM NORTH LOCATED AT APT 15C, 17th STORY, 7th APARTMENT FROM NORTH AT EAST | Oct 9, 2025 |
| Jun 30, 2025 | B | Apt 17K · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT 1st CLOSET FROM SOUTH AT WEST WALL WALL IN THE 1st ROOM FROM NORTH AT CENTER LOCATED AT APT 17K, 15th STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 4, 2025 |
| May 15, 2025 | A | Apt 18H · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH WALL IN THE KITCHEN LOCATED AT APT 18H, 16th STORY, 4th APARTMENT FROM WEST AT NORTH | Aug 18, 2025 |
| Jan 13, 2025 | C | Apt 10G · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE IN THE ENTRANCE LOCATED AT APT 10G, 10th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jan 27, 2025 |
| Dec 20, 2024 | C | Apt 16D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 16D, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 15, 2025 |
| Dec 20, 2024 | C | Apt 16D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 16D, 20th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 15, 2025 |
| Sep 26, 2024 | C | Apt 4M · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Sep 30, 2024 |
| Mar 25, 2024 | B | Apt 1K · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 21SQFT AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT BSMT-APT 1K, 1st BSMT-APT FROM NORTH AT EAST | Apr 29, 2024 |
| Jan 16, 2024 | C | Apt 18A · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT APARTMENT ENTRANCE DOOR IN THE ENTRANCE LOCATED AT APT 18A, 16th STORY, 5th APARTMENT FROM NORTH AT EAST | Jan 30, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 16, 2026 | ECB | Construction: ECB VIOLATION ISSUED FOR FAILURE TO FILE A FINAL INSPECTION OR SIGNED OFF PERMITTED WORK WITH DOB. ATOI OBSERVED, BALCONY SLAB EDGE RESTORATION AND FACADE WORK APPEARED COMPLETED WITH JOB APPLICATION # Q0085621 | Open |
| Jul 20, 2026 | HPD A | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK ,AT WEST WALL IN THE 2nd PRIVATE HALLWAY LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 6:36 PM ET. BBL 4019180085.