4 floors · 207,407 sq ft · built 1948 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 207,407 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1891). Agency page | Dec 31, 2031 in 1896 days | Next due 2031 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-24 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 6, 2026 | Construction CLASS - 2 REISSUE #35720087P DATE OF ISSUE: 05/19/25. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT EXIT #8 EXTERIOR OR SIDEWALK BROKEN AT STEP AND WALKWAY SLABS, #35727341N | May 15, 2026 POP/IN-VIO | $0 |
| Apr 6, 2026 | Construction CLASS - 2 REISSUE #35720084J DATE OF ISSUE: 05/19/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED 4TH FL. ROOM-405 EXIT DOOR, AT 2ND FL ROOM 228, 237, A27 AND COR #35727343R | May 15, 2026 POP/IN-VIO | $0 |
| Apr 6, 2026 | Construction CLASS - 2 REISSUE #35720083H DATE OF ISSUE: 05/19/2025. EXIT DOOR NOT SELF-CLOSING PROPERLY. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT 4TH FLOORSTAIRWAY 'D' ONE EXIT DOOR, 3RD FL. STAIRWAY D ONE EXIT DOOR, 2ND FL. #35727344Z | May 15, 2026 POP/IN-VIO | $0 |
| Apr 6, 2026 | Construction CLASS - 2 REISSUE #35720085L DATE OF ISSUE: 05/19/2025. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGESAND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION #35727342P | May 15, 2026 POP/IN-VIO | $0 |
| May 19, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT EXIT 18 EXTERIOR SIDEWALK BROKEN AT STEP AND WALKWAY SLABS ARE ELEVATED TRIPPING HAZARD. REMEDY: REPAIR AND/OR REPLACE SIDEWALK. #35720087P | Jul 9, 2025 POP/IN-VIO | $0 |
| May 19, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT 4 FLOOR 405, 2 FL. 202, 228, 237, A27, CORRIDOR BY 287 AND 1 FLOOR CAFETERIABY 150 DOORS ARE NOT CLOSING PROPERLY. REMEDY: REPAIR AND/OR REPLACE. #35720084J | Jul 9, 2025 POP/IN-VIO | $0 |
| May 19, 2025 | Construction CLASS - 2 REISSUE #35682716Y. EXIT DOOR NOT SELF-CLOSING. NOTED AT 3 FLOOR(S) STAIR G, 2 FL.(S) STAIR J, 1 FL.(S) STAIR B AND KITCHEN EXIT 13. REMEDY:REPAIR/REPLACE DOOR. #35720083H | Jul 9, 2025 POP/IN-VIO | $0 |
| May 19, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED AT 2ND FLOOR STAIR B, 1ST FLOOR CAFETERIA, EXIT 5, 9 BOX #32, 35, #35720085L | Jul 9, 2025 POP/IN-VIO | $0 |
| May 24, 2024 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING.AT 3 FLOOR DOOR AT STAIR G,2 FL STAIR J,A(NEW WING),E, 1 FL EXIT 2 SMOKES AND KITCHEN EXIT DOORS ARE NOT FUNCTIONING PROPERLY.REM:REPAIR/REPLACE DOOR. #35682716Y | Jul 30, 2024 POP/IN-VIO | $0 |
| Aug 27, 2010 | Boilers CLASS - 3 50 FEDERAL FTFB BOILER LPSTM.OIL F/D 50-REFERENCED BOILER STRUCTURE HAS AN ELEVATION IN EXCESS OF 8FT W/NO PROVISION FOR SAFE ACCESS BY PERSONNEL TO THE TOP OF THE UNIT.A FIXED STEEL ACCESS LADDER & ASSOCIATED #32069387H | Dec 14, 2010 PENDING | $0 |
| Aug 27, 2010 | Boilers CLASS - 3 50 FEDERAL FTFB BOILER LPSTM.OIL F/D 50-REFERENCED BOILER STRUCTURE HAS AN ELEVATION IN EXCESS OF 8FT W/NO PROVISION FOR SAFE ACCESS BY PERSONNEL TO THE TOP OF THE UNIT.A FIXED STEEL ACCESS LADDER & ASSOCIATED #32069386X | Dec 14, 2010 PENDING | $0 |
| Aug 27, 2010 | Boilers CLASS - 3 50 FEDERAL FTFB BOILER LPSTM.OIL F/D 50-REFERENCED BOILER STRUCTURE HAS AN ELEVATION IN EXCESS OF 8FT W/NO PROVISION FOR SAFE ACCESS BY PERSONNEL TO THE TOP OF THE STRUCTURE.A FIXED STEEL ACCESS LADDER & ASSOCI #32069385Y | Dec 14, 2010 PENDING | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 13, 2007 | ELEVATOR #9444/216771 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #03765 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)