8 floors · 146 apartments · 141,920 sq ft · built 1949 · class D4 · owner of record: Walden Terrace, Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 68 days | Annual |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-12 (Accepted). Agency page | Dec 31, 2026 in 68 days | 3 of 3 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 84 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 141,920 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page | Feb 21, 2029 in 851 days | Filing window not open yet |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2101). Agency page | Dec 31, 2031 in 1894 days | Next due 2031 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #26777 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 5, 2025 | B | Apt 7E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 7E, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH | Jun 9, 2025 |
| May 5, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT FIRE DOOR AT NORTH WALL LEADING TO EXIT A AT PUBLIC HALL, 1st STORY | Jun 9, 2025 |
| May 5, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT 2ND FIRE DOOR FROM EAST AT SOUTH LEADING TO EXIT A AT PUBLIC HALL, 7th STORY | Jun 9, 2025 |
| May 5, 2025 | B | Apt 7E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 7E, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH | Jun 9, 2025 |
| May 5, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT DOOR AT COMPACTOR CLOSET, 7th STORY | Jun 9, 2025 |
| May 5, 2025 | B | Apt 7E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 7E, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH | Jun 9, 2025 |
| May 5, 2025 | B | Apt 7E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING EAST WALL IN THE 3rd ROOM FROM EAST LOCATED AT APT 7E, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH | Jun 9, 2025 |
| May 5, 2025 | B | Apt 7E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 7E, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH | Jun 9, 2025 |
| May 5, 2025 | B | Apt 7E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 7E, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH | Jun 9, 2025 |
| Apr 28, 2025 | B | Apt 7E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 7E, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH | Jun 2, 2025 |
| Apr 28, 2025 | C | Apt 7E · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 7E, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH | May 12, 2025 |
| Apr 28, 2025 | B | § 27-2005 HMC: REFIT 6TH FIRE STAIR EXIT DOOR FROM EAST NOT SELF CLOSING LABEL EXIT A AT PUBLIC HALL, 7th STORY | Jun 2, 2025 |
| Apr 28, 2025 | B | § 27-2005 HMC: REFIT 1ST FIRE STAIR EXIT DOOR FROM EAST NOT SELF CLOSING LABEL EXIT B AT PUBLIC HALL, 7th STORY | Jun 2, 2025 |
| Apr 24, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT COMPACTOR CLOSET DOOR AT PUBLIC HALL, 7th STORY | May 29, 2025 |
| Feb 15, 2017 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Mar 22, 2017 |
| Aug 22, 2016 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 26, 2016 |
| May 18, 2016 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jun 22, 2016 |
| May 18, 2016 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALL AND CEILING IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jun 22, 2016 |
| May 18, 2016 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALL AND CEILING IN THE FOYER LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jun 22, 2016 |
| May 6, 2016 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jun 10, 2016 |
| Dec 22, 2015 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jan 26, 2016 |
| Dec 21, 2015 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, APARTMENT AT SOUTH | Mar 25, 2016 |
| Sep 3, 2015 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Oct 8, 2015 |
| Aug 20, 2015 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 24, 2015 |
| Aug 6, 2015 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 10, 2015 |
| Aug 6, 2015 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Nov 9, 2015 |
| Jun 25, 2015 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Aug 29, 2015 |
| Feb 11, 2015 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | May 17, 2015 |
| Jul 22, 2013 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Aug 26, 2013 |
| Mar 29, 2013 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, APARTMENT AT SOUTH | May 3, 2013 |
| Nov 9, 2012 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALL AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Dec 14, 2012 |
| Oct 26, 2012 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, APARTMENT AT SOUTH | Jan 29, 2013 |
| Sep 7, 2012 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS, CEILINGS AND TRIM THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Dec 11, 2012 |
| Sep 5, 2012 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY | Dec 9, 2012 |
| Aug 29, 2012 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Oct 3, 2012 |
| Aug 27, 2012 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, APARTMENT AT SOUTH | Oct 1, 2012 |
| Aug 13, 2012 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, APARTMENT AT SOUTH | Nov 16, 2012 |
| Jul 16, 2012 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, APARTMENT AT WEST | Aug 20, 2012 |
| Jun 8, 2012 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jul 13, 2012 |
| May 31, 2012 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING(BLDG 98-10 64 AVE) IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jul 5, 2012 |
| May 31, 2012 | B | Apt 5D · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK AT CEILING(BLDG 98-10 64 AVE) IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jul 5, 2012 |
| Jan 30, 2012 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, APARTMENT AT SOUTH | Mar 5, 2012 |
| Nov 30, 2011 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS & WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY | Mar 4, 2012 |
| Oct 5, 2011 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jan 8, 2012 |
| Oct 5, 2011 | A | Apt 5D · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... MILDEW AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jan 8, 2012 |
| Aug 30, 2011 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Oct 4, 2011 |
| Jul 8, 2011 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Aug 12, 2011 |
| Jun 13, 2011 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE 1st ROOM FROM EAST LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 16, 2011 |
| Jun 13, 2011 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE FOYER LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 16, 2011 |
| May 6, 2011 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Aug 9, 2011 |
| Apr 21, 2011 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Jul 25, 2011 |
| Jan 19, 2011 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS AND CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 4th APARTMENT FROM EAST AT SOUTH | Apr 24, 2011 |
| Sep 2, 2010 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILING (AKA 98-10 64 AVE) IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Oct 7, 2010 |
| Jan 21, 2010 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, APARTMENT AT EAST | Feb 25, 2010 |
| Mar 19, 2009 | A | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING AT PRIVATE HALLWAY LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Aug 21, 2009 |
| Jan 13, 2009 | B | Apt 5D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE FOYER LOCATED AT APT 5D, 5th STORY, APARTMENT AT SOUTH | Feb 17, 2009 |
| Jan 8, 2009 | A | Apt 5D · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 4th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Apr 13, 2009 |
| Nov 14, 2008 | C | Apt 5G · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 10, 2008 |
| Nov 14, 2008 | C | Apt 5G · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5G, 5th STORY, 1st APARTME | Dec 10, 2008 |
| Aug 14, 2008 | B | § 300, 301, 302, M/D LAW FILE PLANS AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE FOLLOWING ALTERATION OR RESTORE PREMISES TO PRIOR LEGAL CONDITION 1 STY 2ND APT FR W AT NO CONV TO R EST MGT OFF. | Sep 18, 2008 |
Showing 60 of 62. Full list on the agency site.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 5:53 AM ET. BBL 4021010001.