4 floors · 129,600 sq ft · built 1937 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-16 (Accepted). Agency page | Dec 31, 2026 in 62 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 129,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1109). Agency page | Dec 31, 2029 in 1158 days | Next due 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 7, 2026 | Construction CLASS - 2 REISSUED ECB#35631791Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT CELLAR LEVEL MAIN ELECTRICAL ROOM WATER PENETRATION THROUGH FOUNDATION WALL.REM:REPAIR AND/OR REPLACE. #35727423R | May 14, 2026 POP/IN-VIO | $0 |
| Apr 7, 2026 | Construction CLASS - 2 REISSUED ECB#35691790R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1;27-381.NOTED EMERGENCY LIGHTS NOT WORKING AT:INSIDE AND OUTS #35727424Z | May 14, 2026 POP/IN-VIO | $0 |
| Apr 7, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT 4TH FLOOR BOYS BATHROOM#454 BROKEN HINGE ON LOWER SECTION OF WINDOW GATE.REM:REPAIR AND/OR REPLACE. #35732175N | May 14, 2026 POP/IN-VIO | $0 |
| Apr 21, 2025 | Construction CLASS - 2 REISSUE#35682607P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT CELLAR LEVEL MAIN ELECTRICAL METER ROOM,WATER PENETRATING THROUGH FOUNDATION WALL ALONG PENETRATIONS FOR SERVICE WIRES.REM:REPAIR #35691791Z | Jul 1, 2025 POP/IN-VIO | $0 |
| Apr 21, 2025 | Construction CLASS - 2 REISSUE#35682610X FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED EMERGENCY LIGHTS NOT WORKING WHEN TESTED.AT 4TH FL #35691790R | Jul 1, 2025 POP/IN-VIO | $0 |
| Apr 30, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT CELLAR LEVEL ELECTRICAL ROOM(RIGHT),WATER PENETRATION THROUGH FOUNDATION WALLALONG PENETRATION FOR WIRES.REM:REPAIR AND/OR REPLACE. #35682607P | Jul 3, 2024 POP/IN-VIO | $0 |
| Apr 30, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC1006.1; 27-381. NOTED EXISTING EMERGENCY LIGHTS AT 4TH FL. BY STAIR "A"(#4-2), 1ST FL. O #35682610X | Jun 20, 2024 POP/IN-VIO | $0 |
| Apr 30, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED SEVERAL FIREPROOF SELF CLOSING INTERIOR DOORS NOT WORKING PROPERLY AT 4TH FL CORRIDOR SMOKE DOORS BY RM 418,2ND FL STAIRWELL M 1ST FL EXIT#4 & #6 SMOK #35682608R | Jul 3, 2024 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 2:36 PM ET. BBL 4011090016.