Brooklyn · Block 4033 · Lot 39 · 11208

971 Sutter Avenue

3 floors · 2 apartments · 3,000 sq ft · built 1925 · class S2 · owner of record: 971 Sutter Inc

44open violations
$601,250ECB/OATH penalties owed
7HPD class C (immediately hazardous)
1166dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 314 days
Required only if the owner doesn't live there
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1166 days
Next cycle year 2029

Open violations

ECB / OATH (71) · $601,250 owed
IssuedViolationHearingBalance
Feb 9, 2022Construction CLASS - 1
UNLAWFUL ACTS FAILURE TO COMPLY WITH COMMISSIONER'S ORDERS.RECORDS INDICATE NO APP WAS MADE TO CORRECT OR CERTIFY ECB#'S 35644753X & 35407645J.REM:COMPLY WITH COMMISSIONER'S ORDERS.
#35644866M
Mar 1, 2023
DEFAULT
$6,250
Dec 20, 2021Construction CLASS - 1
UNLAWFUL ACTS.FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER.FAILTO CORRECT AND CERTIFY ECB#35634249H FOR FAILURE TO COMPLY.ECB#35407645J-ELECTRICAL WORK WITHOUT A PERMIT BRANCH CIRCUIT INSTALLED THIS OUT
#35644753X
May 4, 2022
DEFAULT
$6,250
Nov 30, 2021Construction CLASS - 2
FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35407648P ISSUED3/21/19 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.DWELLINGCONVERTED COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C.
#35564802N
Apr 13, 2022
DEFAULT
$3,125
Nov 30, 2021Construction CLASS - 2
FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35407649R ISSUED3/21/19 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.DWELLINGCONVERTED.COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C.
#35564800J
Apr 13, 2022
DEFAULT
$3,125
Nov 30, 2021Construction CLASS - 2
FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35407647N ISSUED3/21/19 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.DWELLINGCONVERTED COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C.
#35564801L
Apr 13, 2022
DEFAULT
$3,125
Nov 30, 2021Construction CLASS - 1
FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35407644H ISSUED3/21/19 &TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.WORK W/OPERMIT COMPLY W/COMMISSIONER'S ORDER &/OR FILE C/C.
#35565374K
Apr 13, 2022
DEFAULT
$6,250
Oct 30, 2021Construction CLASS - 1
AN UNLAWFUL ACT. FAILURE TO COMPLY W/AN ORDER OF THE COMMISSIONER. FAILURE TO CORRECT & CERTIFY SUMMONS#39002484N FAILURE TO COMPLY W/THE COMMISSIONERS ORDER. REMEDY: COMPLY WITH CODE.
#35634249H
Mar 9, 2022
DEFAULT
$12,500
Oct 6, 2021Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407646L ISSUED ON 03/21/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANN
#35563583H
Feb 16, 2022
DEFAULT
$5,000
Oct 6, 2021Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407647N ISSUED ON 03/21/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR ILLEGAL OCCUPANCY W/3 OR MORE ADDITIONAL DWELLI
#35563584J
Feb 16, 2022
DEFAULT
$5,000
Oct 6, 2021Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407644H ISSUED ON 03/21/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR WORK W/O A PERMIT. NO RECORDS OF CORRECTION/PER
#35563586N
Feb 16, 2022
DEFAULT
$12,500
Oct 6, 2021Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407648P ISSUED ON 03/21/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR ILLEGAL OCCUPANCY W/3 OR MORE ADDITIONAL DWELLI
#35563585L
Feb 16, 2022
DEFAULT
$5,000
Sep 23, 2021Construction CLASS - 1
UNLAWFUL ACTS FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONERS.FAILURE TO CORRECT AND CERTIFY SUMMONS ECB#35407645J ELECTRICAL WORK WITHOUT A PERMIT.ON 2ND FLOOR AN ILLEGAL SRO ELECTRICAL WORK W/MAX CABLE R
#35584016Y
Feb 2, 2022
DEFAULT
$6,250
Jul 28, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35407649R ISSUED 03/21/19 AND TO FILE CERTIFICATE OF CORRECTOIN PURSUANT TO 28-201.1 AND 1RCNY 102-01.DWELLING CONVERTED MAINTAINED OR
#35534784L
Dec 8, 2021
DEFAULT
$3,125
Jul 28, 2021Construction CLASS - 1
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35407644H ISSUED 03/21/19 AND TO FILE CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.AT 2ND FLOOR.WORK WITHOUT PERMIT
#35534783J
Dec 8, 2021
DEFAULT
$6,250
Jun 15, 2021Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER SUMMONS 35407645J STILL REMAINS, COMPLY WITH COMMISSIONER'S ORDER; COMPLY WITH COMMISSIONER'S ORDER
#39042829K
Oct 20, 2021
DEFAULT
$6,250
Jun 11, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35407647N ISSUED ON 3/21/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMMISS
#35532903X
Oct 20, 2021
DEFAULT
$3,125
Jun 11, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOALTION#35407648P ISSUED ON 3/21/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMMISS
#35532905J
Oct 20, 2021
DEFAULT
$3,125
Jun 11, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35407649R ISSUED ON 3/21/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMMISS
#35532902Y
Oct 20, 2021
DEFAULT
$3,125
Jun 11, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35407646L ISSUED ON 3/21/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMMISS
#35532904H
Oct 20, 2021
DEFAULT
$3,125
May 21, 2021Construction CLASS - 1
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35407644H ISSUED ON 03/21/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT.REMED
#35531188L
Sep 29, 2021
DEFAULT
$12,500
Mar 2, 2021Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VOLATION#35407649H ISSUED ON 3/21/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT.RE
#35527140K
Jul 14, 2021
DEFAULT
$12,500
Feb 8, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35407649R ISSUED ON 3/21/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR ILLEGAL OCCUPANCY W
#35526494N
Jun 23, 2021
DEFAULT
$3,125
Feb 8, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#30407646L ISSUED ON 3/21/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR FAILURE TO MAINTAIN
#35526491H
Jun 23, 2021
DEFAULT
$6,250
Feb 8, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35407648P ISSUED ON 3/21/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR ILLEGAL OCCUPANCY W
#35526492J
Jun 23, 2021
DEFAULT
$3,125
Feb 8, 2021Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35407647N ISSUED ON 3/21/2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR ILLEGAL OCCUPANCY W
#35526493L
Jun 23, 2021
DEFAULT
$3,125
Jan 25, 2021Construction CLASS - 1
FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35407644H ISSUED ON 3/21/19 & TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01.WORK W/OUT A PERMIT.REMEDY:COMP
#35526416H
Jun 9, 2021
DEFAULT
$6,250
Oct 20, 2020Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407648P ISSUED ON 03-21-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 DWELLING CONVERTED MAINT
#35521249R
Mar 3, 2021
DEFAULT
$3,125
Oct 20, 2020Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407647N ISSUED ON 03-21-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 DWELLING CONVERTED MAINT
#35521248P
Mar 3, 2021
DEFAULT
$3,125
Oct 20, 2020Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407644H ISSUED ON 03-21-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 WORK WITHOUT A PERMIT TH
#35522827Y
Mar 3, 2021
DEFAULT
$6,250
Oct 20, 2020Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407646L ISSUED ON 03-21-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 FAILURE TO MAINTAIN BUIL
#35522826M
Mar 3, 2021
DEFAULT
$3,125
Oct 20, 2020Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407649R ISSUED ON 03-21-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01 DWELLING CONVERTED MAIN
#35522825K
Mar 3, 2021
DEFAULT
$3,125
Feb 14, 2020Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER OBTAINED IN SUMMONS/VIOLATION#35407644H ISSUED ON 3/21/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK W/O PERMIT AT TIME OF
#35517530R
Aug 7, 2020
DEFAULT
$12,500
Dec 24, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407649R ISSUED ON 03-21-2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.DWELLING CONVERTED TIM
#35514537X
Dec 3, 2020
DEFAULT
$3,125
Dec 24, 2019Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407644H ISSUED ON 03-21-2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.AT 2ND FLOOR FULL PART
#35514538H
Dec 3, 2020
DEFAULT
$12,500
Dec 24, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407648P ISSUED ON 03-21-2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.DWELLING CONVERTED MAI
#35513799L
Dec 3, 2020
DEFAULT
$3,125
Dec 24, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407647N ISSUED ON 03-21-2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.DWELLING CONVERTED MAI
#35513798J
Dec 3, 2020
DEFAULT
$3,125
Dec 24, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407646L ISSUED ON 03-21-2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FAILURE TO MAINTAIN BD
#35513797H
Dec 3, 2020
DEFAULT
$3,125
Nov 25, 2019Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407644H ISSUED ON 03-21-2019 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT
#35512855M
Aug 13, 2020
DEFAULT
$12,500
Nov 13, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407648P ISSUED ON 03-21-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. B1E8: DWELLING CONVERTED,MAINTAINED OR OCCUPIED W/3 OR MORE ADD
#35512227L
Sep 11, 2020
DEFAULT
$3,125
Nov 13, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407649R ISSUED ON 03-21-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. B1E8: DWELLING CONVERTED ,MAINTAINED OR OCCUPIED W/3 OR MORE
#35512228N
Sep 11, 2020
DEFAULT
$3,125
Nov 13, 2019Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407644H ISSUED ON 03/21/19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. B101: WORK W/O A PERMIT(FULL HEIGHT PARTITIONS TO MAKE ILLEGAL
#35512229P
Sep 11, 2020
DEFAULT
$12,500
Nov 13, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407647N ISSUED ON 03-21-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. B1E8: DWELLING CONVERTED,MAINTAINED OR OCCUPIED W/3 OR MORE ADD
#35512230M
Sep 11, 2020
DEFAULT
$3,125
Nov 13, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407646L ISSUED ON 03-21-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. B102: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER: 3RD FL
#35512231Y
Sep 11, 2020
DEFAULT
$3,125
Sep 28, 2019Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407644H ISSUED ON 03/21/19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O A PERMIT;2ND FL DOORWAYS,SHEETROCK & BULTIN CLOSETS TO
#35429672M
Jan 29, 2020
DEFAULT
$6,250
Sep 28, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407647N ISSUED ON 03-21-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. DWELLING CONVERTED,MAINTAINED OR OCCUPIED W/3 OR MORE ADDITIONA
#35429666X
Jan 29, 2020
DEFAULT
$3,125
Sep 28, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407646L ISSUED ON 03-21-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER;3 FL HALLWAY
#35429670Z
Jan 29, 2020
DEFAULT
$3,125
Sep 28, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407649R ISSUED ON 03-21-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. DWELLING CONVERTED,MAINTAINED OR OCCUPIED W/3 OR MORE ADDITIONA
#35429667H
Jan 29, 2020
DEFAULT
$3,125
Sep 28, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407648P ISSUED ON 03-21-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. DWELLING CONVERTED,MAINTAINED OR OCCUPIED W/3 OR MORE ADDITIONA
#35429668J
Jan 29, 2020
DEFAULT
$3,125
Aug 12, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407649R ISSUED ON 03-21-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR: DWELLING CONVERTED,MAINTAINED & OCCUPIED W/3 OR MORE ADDIT
#35426603P
Dec 16, 2019
DEFAULT
$5,000
Aug 12, 2019Construction CLASS - 1
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407644H ISSUED ON 03/21/19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR: WORK W/O A PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE
#35426602N
Dec 16, 2019
DEFAULT
$6,250
Aug 12, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407646L ISSUED ON 03-21-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR: FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.
#35426601L
Dec 16, 2019
DEFAULT
$5,000
Aug 12, 2019Construction CLASS - 2
FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35407648P ISSUED ON 3/21/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. FOR:DWELLING CONVERTED,MAI
#35426600J
Dec 16, 2019
DEFAULT
$5,000
Aug 12, 2019Construction CLASS - 2
FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35407647N ISSUED ON 03-21-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR: DWELLING CONVERTED,MAINTAINED & OCCUPIED W/3 ADDITIONAL
#35426604R
Dec 16, 2019
DEFAULT
$5,000
May 23, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407644H ISSUED ON 03-21-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.COMPLY WITH COMMISSIONER
#35399046K
Sep 9, 2019
DEFAULT
$6,250
May 23, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407648P ISSUED ON 03-21-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.COMPLY WITH COMMISSIONER
#35399045Z
Sep 9, 2019
DEFAULT
$3,125
May 23, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407649R ISSUED ON 03-21-19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.COMPLY WITH COMMISSIONER
#35399044R
Sep 9, 2019
DEFAULT
$3,125
May 23, 2019Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35407646L ISSUED ON 03-21-18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.COMPLY WITH COMMISSIONER
#35399047M
Sep 9, 2019
DEFAULT
$3,125
Apr 30, 2019Construction CLASS - 1
FAILURE TO COMPLY, COMPLY WITH COMMISSIONER'S ORDER; COMPLY WITH CODE
#39002484H
Oct 21, 2019
DEFAULT
$12,500
Mar 21, 2019Quality of Life CLASS - 1
DWELLING CONVERTED MAINTAINED & OCCUPIED W/3 ADDITIONAL UNITS PER C/O 2 OF 3. AT TIME OF INSPECTION IN A BLDG DEPT RECORDS INDICATE 1 FAMILY PER FLOOR I NOTED ON 3RD FL AT BLDG BEDDING,FOOR ITEMS,MICROWAVE,AND
#35407649R
Jul 1, 2019
DEFAULT
$70,000
Mar 21, 2019Construction CLASS - 1
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION NOTED HALLWAY AT 3 FLOOR FULL OF DEBRIS,BACK YARD FULL OF DEBRIS INCLUDING A COMPRESSED GAS TANK,& STAIRWELL CEILING CRACKED PEELING IN
#35407646L
Jul 1, 2019
DEFAULT
$25,000

Showing 60 of 71. Full list on the agency site.

DOB (5)
IssuedViolationStatus
Jun 26, 2019FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00975
DOB VIOLATION - ACTIVE
Jun 26, 2019FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00976
DOB VIOLATION - ACTIVE
Jun 26, 2019FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00977
DOB VIOLATION - ACTIVE
Mar 25, 2015FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00163
DOB VIOLATION - ACTIVE
Mar 25, 2015FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00164
DOB VIOLATION - ACTIVE
DOB NOW Safety (5)
IssuedViolationStatus
Jun 26, 2019AEUHAZ FTC-AEU-HAZ
Active
Jun 26, 2019AEUHAZ FTC-AEU-HAZ
Active
Jun 26, 2019AEUHAZ FTC-AEU-HAZ
Active
Mar 25, 2015AEUHAZ FTC-AEU-HAZ
Active
Mar 25, 2015AEUHAZ FTC-AEU-HAZ
Active
HPD (16) · C 7 · B 8 · A 1
IssuedClassViolationCorrect by
Oct 18, 2005BSECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE - WINDOW FRAMES SO AS TO FIT AIR TIGHT AT EXTENTION FRONT ROOM 3RD STY APT #R-6.—
Oct 18, 2005BSECTION 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT 2ND AND 3RD STORY PUBLIC HALLS—
Oct 18, 2005BSECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED ELECTRICAL WIRES EAST WALL 3RD STORY PUBLIC HALL—
Mar 7, 2011BApt 2 · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORYApr 11, 2011
Nov 26, 2010BSECTION 27-2038 ADMIN CODE: PROVIDE ADEQUATE LIGHTING FOR 1ST AND 2ND STORY PUBLIC HALL MINIMUM 75 WATTS INCANDESCENT OR EQUIVALENT ILLUMINATION AT EACH STORYDec 31, 2010
Nov 26, 2010BSECTION 27-2038 ADMIN CODE: PROVIDE ADEQUATE LIGHTING FOR 1ST AND 2ND STORY PUBLIC HALL MINIMUM 75 WATTS INCANDESCENT OR EQUIVALENT ILLUMINATION AT EACH STORYDec 31, 2010
Dec 12, 2008BSECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS MINIMUM REQUIREDJan 16, 2009
Dec 27, 2007BSECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE 6TH WOOD THREAD FROM BOTTOM OF LANDING AT PUBLIC HALL STAIRS, 3rd STORYJan 31, 2008
Oct 30, 2006CSECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF NO ELECTRICITY PROVIDED AT PUBLIC HALL STAIRSNov 10, 2006
Oct 27, 2006CApt 3 · SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORYNov 7, 2006
Oct 27, 2006CApt 3 · SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF NO ELECTRICITY SUPPLY IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORYNov 7, 2006
Oct 27, 2006ASECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING HAND RAIL AT STAIRS BETWEEN SECOND AND THIRD STORIESFeb 4, 2007
Oct 6, 2006CApt 3 · SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF NO ELECTRICAL SUPPLY IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORYOct 17, 2006
Feb 3, 2006CApt 2 · SECTION 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTFeb 14, 2006
Feb 3, 2006CSECTION 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM LOCKED DOOR TO CELLAR AT CELLAR, 1st STORYFeb 14, 2006
Jan 25, 2006CApt 2 · SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORYFeb 5, 2006

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 12:34 PM ET. BBL 3040330039.

Look up another building