12 floors · 73 apartments · 69,403 sq ft · built 1992 · class RM · owner of record: Queens Regency Condominium
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 70 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 69,403 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $654,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 487 days | No Cycle 10 report on record yet |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2090). Agency page | Dec 31, 2030 in 1531 days | Next due 2030 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8B AND 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#910921.AGG2 HISTORY OF NONCOMPLI #37027571Y | Apr 22, 2025 IN VIOLATION | $6,250 |
| Jun 5, 2016 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER.NOTED:IN BLDG STAIRWELL "A" & "B" @8TH FL THROUGH PENT HOUSE LEVEL,STEP CRACKS IN CMU WALL SURROUNDING SCISSOR STAIRS APPEAR.ALSO IN CORNER BEHIND STAND PIPE #35197107J | Jul 26, 2016 STIPULATION/IN-VIO | $0 |
| Apr 8, 2016 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.NOTED IN BLDG STAIRWELLS A&B @ 8TH FL THROUGH PENTHOUSE LEVEL,STEP CRACKS IN CMU WALL SURROUNDING SCISSOR STAIRS APPEAR,ALSO IN CORNER OF STAIRWELL A BEHIND STA #35180261R | May 24, 2016 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #01174 | DOB VIOLATION - ACTIVE |
| Aug 30, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 #01688 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| May 31, 1994 | Elevators LL1081 | Active |
| May 31, 1994 | Elevators LL1081 | Active |
| Jun 28, 1993 | Elevators LL1081 | Active |
| Jun 28, 1993 | Elevators LL1081 | Active |
| Apr 7, 1992 | Elevators LL1081 | Active |
| Apr 7, 1992 | Elevators LL1081 | Active |
| Apr 25, 1991 | Elevators LL1081 | Active |
| Apr 25, 1991 | Elevators LL1081 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 20, 2026 | B | Apt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 4th APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Nov 24, 2026 |
| Sep 8, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM AT BASEMENT, DOOR LOCKED AT BOILER ROOM | Sep 14, 2026 |
| May 6, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 9, 2026 |
| Jan 29, 2026 | C | Apt 5C · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Feb 12, 2026 |
| Jan 29, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE CLOSER ARM AT 2ND FIRE DOOR LEADING TO GARAGE AT BASEMENT | Feb 12, 2026 |
| Jan 29, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM . DOOR LOCKED AT BASEMENT AT BOILER ROOM | Feb 4, 2026 |
| Jan 29, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE CLOSER ARM AT 2ND FIRE DOOR LEADING TO GARAGE AT BASEMENT | Feb 12, 2026 |
| Jan 29, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE CLOSER ARM AT FIRE STAIRS EXIT DOOR(LABELED AS STAIR B) AT BASEMENT | Feb 12, 2026 |
| Jan 29, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE CLOSER ARM AT FIRE DOOR LEADING TO GAS METER ROOM AT BASEMENT | Feb 12, 2026 |
| Jan 29, 2026 | C | Apt 5C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Feb 4, 2026 |
| Jan 29, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE CLOSER ARM AT FIRST FIRE DOOR FROM PUBLIC HALL LEADING TO GARAGE AT BASEMENT | Feb 12, 2026 |
| Jan 29, 2026 | C | Apt 5C · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 29, 2026 |
| Jan 26, 2026 | B | Apt 5C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 2, 2026 |
| Jan 26, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR TO BOILER ROOM LOCKED AT CELLAR AT BOILER ROOM | Feb 1, 2026 |
| Jan 26, 2026 | B | Apt 5C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE KITCHEN LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 2, 2026 |
| Jan 26, 2026 | B | Apt 5C · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 2, 2026 |
| Jan 26, 2026 | C | Apt 5C · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 25, 2026 |
| Jan 26, 2026 | B | Apt 5C · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 2, 2026 |
| Jan 26, 2026 | B | Apt 5C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE IN THE PRIVATE HALLWAY LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 2, 2026 |
| Jan 26, 2026 | B | Apt 5C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRIC OUTLET 2ND FROM EAST AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Mar 2, 2026 |
| Jan 26, 2026 | C | Apt 5C · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGE ON DOOR IN THE ENTRANCE LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Feb 9, 2026 |
| Jan 26, 2026 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT CELLAR | Feb 1, 2026 |
| Oct 8, 2024 | C | Apt 11B · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES ON DOOR IN THE ENTRANCE LOCATED AT APT 11B, 11th STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 22, 2024 |
| Aug 22, 2023 | C | Apt 7A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 7A, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 17, 2023 |
| Jun 17, 2021 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORY | Sep 20, 2021 |
| Jun 17, 2021 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Sep 20, 2021 |
| Jun 17, 2021 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY | Sep 20, 2021 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 20, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 4th APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Open |
| Sep 8, 2026 | HPD C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM AT BASEMENT, DOOR LOCKED AT BOILER ROOM | Open |
| Sep 8, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 5:36 PM ET. BBL 4020907501.