Brooklyn · Block 1249 · Lot 7 · 11216

960 Sterling Place

6 floors · 79 apartments · 92,688 sq ft · built 1938 · class D4 · owner of record: 960 Sterling Pl Owners Corp

92open violations
$0ECB/OATH penalties owed
17HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 69 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 69 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 85 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 92,688 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 190 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 190 days
Annual filing
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1249). Agency page

Dec 31, 2029
in 1165 days
Next due 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-23 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#39638
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
HPD (90) · C 17 · B 57 · A 16
IssuedClassViolationCorrect by
Sep 22, 2026AApt 4L · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM NORTH AT EASTDec 26, 2026
Sep 22, 2026BApt 4L · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB IN THE ENTRANCE LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 27, 2026
Aug 24, 2026B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS AT BALCONY AT 1ST FIRE ESCAPE FROM NORTH AT WEST EXTERIOR WALL AT FIRE ESCAPE, 2nd STORYSep 28, 2026
Jul 6, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING EAST SOUTH AND NORTH WALL AT PUBLIC HALL, 6th STORY, SECTION AT EASTOct 9, 2026
Jul 6, 2026A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT METERIAL AT CEILING EAST SOUTH AND NORTH WALL AT PUBLIC HALL, 6th STORY, SECTION AT EASTOct 9, 2026
Jun 22, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 6th STORYSep 25, 2026
Jun 22, 2026B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING AT PUBLIC HALL, 6th STORYJul 27, 2026
Jun 22, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 6th STORYJul 27, 2026
Apr 13, 2026BApt 3E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3E, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTMay 18, 2026
Apr 13, 2026BApt 3C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3C, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTMay 18, 2026
Apr 13, 2026BApt 1G · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMay 18, 2026
Apr 13, 2026BApt 6N · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6N, 6th STORY, 2nd APARTMENT FROM SOUTH AT WESTMay 18, 2026
Apr 13, 2026BApt 2N · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2N, 2nd STORY, 2nd APARTMENT FROM SOUTH AT WESTMay 18, 2026
Apr 13, 2026BApt 2E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTMay 18, 2026
Apr 13, 2026BApt 4A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHMay 18, 2026
Apr 13, 2026BApt 3D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3D, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHMay 18, 2026
Apr 13, 2026BApt 5L · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5L, 5th STORY, 1st APARTMENT FROM NORTH AT EASTMay 18, 2026
Apr 13, 2026BApt 5J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5J, 5th STORY, 3rd APARTMENT FROM NORTH AT EASTMay 18, 2026
Apr 13, 2026BApt 3L · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTMay 18, 2026
Apr 13, 2026BApt 3J · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3J, 3rd STORY, 3rd APARTMENT FROM NORTH AT EASTMay 18, 2026
Apr 13, 2026BApt 2L · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2L, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTMay 18, 2026
Apr 13, 2026BApt 1C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1C, 1st STORY, 2nd APARTMENT FROM SOUTH AT WESTMay 18, 2026
Apr 13, 2026BApt 6D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMay 18, 2026
Apr 13, 2026BApt 6C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6C, 6th STORY, 2nd APARTMENT FROM SOUTH AT WESTMay 18, 2026
Apr 13, 2026BApt 6A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHMay 18, 2026
Apr 13, 2026BApt 5D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5D, 5th STORY, 1st APARTMENT FROM WEST AT NORTHMay 18, 2026
Apr 13, 2026BApt 5C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM SOUTH AT WESTMay 18, 2026
Apr 13, 2026BApt 5A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5A, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHMay 18, 2026
Apr 13, 2026BApt 4D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4D, 4th STORY, 1st APARTMENT FROM WEST AT NORTHMay 18, 2026
Mar 31, 2026CApt 6J · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Apr 4, 2026
Mar 31, 2026CApt 6J · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Apr 4, 2026
Apr 23, 2025AApt 3F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE 1st ROOM FROM EAST AT SOUTH, THE 3rd ROOM FROM EAST, THE FOYER LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTJul 27, 2025
Apr 23, 2025CApt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTApr 29, 2025
Apr 23, 2025BApt 3F · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 28, 2025
Apr 23, 2025AApt 3F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTJul 27, 2025
Apr 23, 2025AApt 3F · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTJul 27, 2025
Apr 23, 2025AApt 3F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL, NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTJul 27, 2025
Apr 23, 2025CApt 3F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 19, 2025
Apr 23, 2025BApt 3F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 28, 2025
Apr 23, 2025BApt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL, EAST WALL IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 28, 2025
Apr 23, 2025BApt 3F · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 28, 2025
Apr 23, 2025BApt 3F · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT PIPE WASTELINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 28, 2025
Apr 23, 2025BApt 3F · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTMay 28, 2025
Apr 23, 2025CApt 3F · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WATERCLOSET IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTApr 29, 2025
Apr 23, 2025AApt 3F · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTJul 27, 2025
Apr 23, 2025CApt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT F;LOOR IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTApr 29, 2025
Jan 24, 2025BApt 3F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE KITCHEN LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 28, 2025
Jan 24, 2025CApt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTJan 30, 2025
Jan 24, 2025BApt 3F · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 28, 2025
Jan 24, 2025BApt 3F · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 28, 2025
Jan 24, 2025BApt 3F · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT WATERCLOSET IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 28, 2025
Jan 24, 2025BApt 3F · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 28, 2025
Jan 24, 2025BApt 3F · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 28, 2025
Jan 24, 2025AApt 3F · § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL ,,, IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTApr 29, 2025
Jan 24, 2025BApt 3F · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 28, 2025
Jan 24, 2025CApt 3F · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE AT WATERCLOSET IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTJan 30, 2025
Jan 24, 2025BApt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT FLOOR IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 28, 2025
Jan 24, 2025BApt 3F · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WATERCLOSET IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 28, 2025
Jan 24, 2025BApt 3F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL OUTLET AT EAST WALL IN THE KITCHEN LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 28, 2025
Jan 24, 2025BApt 3F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, SOUTH WALL IN THE FOYER LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 28, 2025

Showing 60 of 90. Full list on the agency site.

Issued in the last 120 days

DateSourceWhatNow
Oct 21, 2026DOB SafetyFacades: Unsafe FISP report filedClosed
Sep 22, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 22, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR KNOB IN THE ENTRANCE LOCATED AT APT 4L, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Aug 24, 2026HPD B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS AT BALCONY AT 1ST FIRE ESCAPE FROM NORTH AT WEST EXTERIOR WALL AT FIRE ESCAPE, 2nd STORYOpen
Jul 6, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING EAST SOUTH AND NORTH WALL AT PUBLIC HALL, 6th STORY, SECTION AT EASTOpen
Jul 6, 2026HPD A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT METERIAL AT CEILING EAST SOUTH AND NORTH WALL AT PUBLIC HALL, 6th STORY, SECTION AT EASTOpen
Jul 2, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT PUBLIC HALL, 1st STORYClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 4:39 PM ET. BBL 3012490007.

Look up another building