2 floors · 38,028 sq ft · built 1920 · class O5 · owner of record: 96 North 10th Street Holdings Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2018-07-17 (Accepted). Agency page | Dec 31, 2026 in 59 days | 1 of 1 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 38,028 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 180 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 180 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 790 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 18, 2026 | Unknown CLASS - 2 FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATION. AS NOTED AT THE TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE WITHNO HISTORY OF OBTAINING A CONSTRUCTION PERMIT. REMEDY: OBTAIN CONSTRUC #35730046H | Oct 28, 2026 PENDING | $1,250 |
| Nov 17, 2025 | Construction CLASS - 2 RESPONDING COMPLAINT OBSERVED: SIDEWALK SHED IN PLACE. AT EXPOSURE# 1 PARAPET AT HIGHER SECTION DISCONNECTED IN RISK OF DISLODGEMENT ANY MOMENT DUE TO WINDY CONDITIONS, CONTRARY TO 3307.6.4.6 CREATING UNSAFE C #39547023P | Jan 21, 2026 ADMIT/IN-VIO | $0 |
| Oct 27, 2025 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT AND/OR FENCE PERMIT EXPIRED. REMEDY: RENEW PERMIT. #35726655L | Apr 1, 2026 DEFAULT | $6,250 |
| Dec 16, 2024 | Boilers CLASS - 2 FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 30000009310N0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FO #37032188H | Aug 18, 2025 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 18, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TI ME OF INSPECTION,I OBSERVED SPALLING STUCCO AT MULTIPLE LOCATIONS,CRAC KED AND STEP CRACKS IN BRICK WORK.ALSO OBSERVED ON FACADE,MISSING BRIC K ON EXP1 NORTH.ALSO OBSERVED BROKEN GLASS WINDOWS,SIDEWALK SHED WAS N OT TOTALLY CONST #SR0101RF | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #10668 | DOB VIOLATION - ACTIVE |
| Oct 27, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER 28.301 01 OF TEH NYC ADMIN CODE. NOTED AT THE TIME OF INSPECTION OBSERVED VACATE LOT. AT EXPOSURE 1 SPALLING BRICK, STEP CRACKS AND MISSING ON LOOSE MORTAR JOINTS. REMEDY: REPAIR AND/OR REPLACE #SR0104BB | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #09619 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #29528 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #09261 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #30038 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #10404 | DOB VIOLATION - ACTIVE |
| Feb 11, 2022 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION # 321592255 DUE TO THE CONTRACTOR WITHDRAWAL. #22-00428 | DOB VIOLATION - ACTIVE |
| Feb 11, 2022 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER APPLICATION # 321592255 DUE TO THE CONTRACTOR WITHDRAWAL. #22-00429 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 18, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TI ME OF INSPECTION,I OBSERVED SPALLING STUCCO AT MULTIPLE LOCATIONS,CRAC KED AND STEP CRACKS IN BRICK WORK.ALSO OBSERVED ON FACADE,MISSING BRIC K ON EXP1 NORTH.ALSO OBSERVED BROKEN GLASS WINDOWS,SIDEWALK SHED WAS N OT TOTALLY CONST | Open |
| Aug 18, 2026 | ECB | Unknown: FAILURE TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATION. AS NOTED AT THE TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE WITHNO HISTORY OF OBTAINING A CONSTRUCTION PERMIT. REMEDY: OBTAIN CONSTRUC | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 3:20 AM ET. BBL 3023030009.