Queens · Block 1613 · Lot 17 · 11368

96-18 43 Avenue

5 floors · 129,592 sq ft · built 2014 · class W1 · owner of record: Nyc School Construction Authority

25open violations
$2,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
70dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 70 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 129,592 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 191 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 191 days
Annual filing
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1613). Agency page

Dec 31, 2033
in 2627 days
Next due 2033
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-24 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (5) · $2,000 owed
IssuedViolationHearingBalance
Apr 13, 2026Construction CLASS - 2
ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1-28-118.3.2. NOTED: AT THE TIME OF INSPECTION TCO HAS BEEN EXPIRED SINCE 7/27/2023. CO#4439257-0000007 HAS NOT BEEN RE
#35727428X
May 8, 2026
POP/IN-VIO
$0
Apr 13, 2026Construction CLASS - 2
RE-ISSUE #35719899M. EXIT DOOR NOT SELF-CLOSING. NOTED: EXTERIOR DOORSAT EXIT #S "6", "5" AND "8" NOT SELF-CLOSING PROPERLY DUE TO RUBBING, FRAMES, OR SADDLE. REMEDY: REPAIR/REPLACE DOOR.
#35727427Y
May 8, 2026
POP/IN-VIO
$0
May 15, 2025Construction CLASS - 2
REISSUE #35682720R. EXIT DOOR NOT SELF-CLOSING. NOTED EXTERIOR DOORS AT EXIT #6, 5 AND 8 NOT SELF-CLOSING PROPERLY DUE TO RUBBING OR FRAME OR SADDLE. REMEDY: REPAIR/REPLACE DOOR.
#35719899M
Jul 9, 2025
POP/IN-VIO
$0
Jun 3, 2024Construction CLASS - 2
EXIT DOOR NOT SELF-CLOSING.AT 1 FLOOR PLAYGROUND EXIT CORRIDOR BY 104 AND PLAYGROUND BY 103B DOORS ARE NOT FUNCTIONING PROPERLY.REM:REPAIR/REPLACE DOOR.
#35682720R
Aug 13, 2024
POP/IN-VIO
$0
Feb 15, 2019Unknown CLASS - 2
ELECTRICAL WORK WITHOUT A PERMIT. WORK WITHOUT A PERMIT FOR 44 PANELS GENERATORS MOTORS AND HEATERS/APPLICATION NUMBER DOES NOT COVER WORK (A326327) REMEDY: OBTAIN PERMIT.
#35358945N
May 14, 2019
DEFAULT
$2,000
DOB (1)
IssuedViolationStatus
May 4, 2010CONSTRUCTION

#0402MD
DOB VIOLATION - ACTIVE
DOB NOW Safety (20)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 4)
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 21, 2026, 11:58 AM ET. BBL 4016130017.

Look up another building