Brooklyn · Block 1928 · Lot 7502 · 11205

956 Bedford Avenue

6 floors · 9 apartments · 6,664 sq ft · built 2009 · class RM · owner of record: Unavailable Owner

14open violations
$0ECB/OATH penalties owed
3HPD class C (immediately hazardous)
58dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 58 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 58 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 74 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 302 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 789 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (3)
IssuedViolationStatus
Sep 6, 2019Elevators ACC1
Active
Oct 31, 2014Elevators EVCAT1
Active
Jan 30, 2013AEUHAZ FTC-AEU-HAZ
Active
HPD (11) · C 3 · B 4 · A 4
IssuedClassViolationCorrect by
Sep 7, 2021C§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT PUBLIC HALL, 1st STORYSep 13, 2021
Mar 11, 2020CApt 6F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHApr 1, 2020
Mar 11, 2020BApt 6F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ..THE CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHApr 15, 2020
Mar 11, 2020BApt 6F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ..THE CEILING IN THE BATHROOM LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHApr 15, 2020
Mar 11, 2020BApt 6F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ..THE CEILING AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHApr 15, 2020
Mar 11, 2020CApt 6F · § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS .... IN THE ENTRANCE LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHApr 1, 2020
Mar 11, 2020A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYJun 14, 2020
Mar 11, 2020A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTEDJun 14, 2020
Jan 17, 2017A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR , AT PUBLIC HALL, 1st STORYApr 22, 2017
Jan 17, 2017A§ 27-2045 ADM CODE POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAIL BOX , AT PUBLIC HALL, 1st STORYApr 22, 2017
Jun 23, 2011BApt 6F · SECTION 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES ... IN THE ENTIRE APARTMENT LOCATED AT APT 6F, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJul 28, 2011

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 3, 2026, 10:17 AM ET. BBL 3019287502.

Look up another building