3 floors · 328,860 sq ft · built 1968 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1926). Agency page | Dec 31, 2026 in 61 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 328,860 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 792 days | Next cycle year 2028 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-14 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 26, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF CLOSING.NOTED AT 1ST FL EXIT 10,9,8(BASEMENT)EXIT 1,2,6 ALL DOORS ARE INDISREPAIR/NOT CLOSING WHEN TESTED.REM:REPAIR/REPLACE DOOR. #35731841L | Jun 15, 2026 POP/IN-VIO | $0 |
| May 26, 2026 | Construction CLASS - 2 REISSUE ECB#35717253Y FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT 1ST FL EXIT 14/SMOKE DOOR,GYM,HALLWAY SMOKE NEAR RM 1192ND FL STAIR E BASEMENT CAFETERIA ALL DOORS.REM:REPAIR AND/OR REPLACE. #35731839M | Jun 15, 2026 POP/IN-VIO | $0 |
| May 26, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL GYM,AUDITORIUM BASEMENT CAFETERIA EMERGENCY LIGHTS NOT WORKI #35731840J | Jun 15, 2026 POP/IN-VIO | $0 |
| May 26, 2026 | Construction CLASS - 2 REISSUE ECB#35717252M FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT ROOF ALL BULKHEADS 3RD FL CLASSROOMS 307,303 WATER DAMAGE TO CEILINGS/WALLS WITH SPALLING PAINT/PLASTER THROUGHOUT VARIOUS AR #35731838K | Jun 15, 2026 POP/IN-VIO | $0 |
| May 5, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: BULKHEADS THROUGHOUT HAVE SPALLING WALLS DUE TO WATER DAMAGE. ALSO NOTED @ ROOM 307 HAS WATER DAMAGE AT CORNER BY WINDOW. REMEDY: COMPLY WITH CODE. #35717252M | May 22, 2025 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02781 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)