Manhattan · Block 1892 · Lot 19 · 10025

953 West End Avenue

7 floors · 26 apartments · 31,480 sq ft · built 1899 · class D6 · owner of record: Boray Estates Co.,

23open violations
$0ECB/OATH penalties owed
12HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 31,480 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-08 (Accepted). Agency page

On file2026 reports accepted
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $144,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: UNSAFE (2026-06-19)

Open violations

ECB / OATH (0)

None open.

DOB (7)
IssuedViolationStatus
May 7, 2025FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
#00027
DOB VIOLATION - ACTIVE
Feb 20, 2025HAZARDOUS CONDITION (FACADE)
CYCLE 9C UNSAFE REPORT FILED
#912051
DOB VIOLATION - ACTIVE
Feb 22, 2024NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
#00392
DOB VIOLATION - ACTIVE
Jul 20, 2001CONSTRUCTION

#ZSTF03DP
DOB VIOLATION - ACTIVE
Apr 28, 2000CONSTRUCTION

#ZSTF01MAD
DOB VIOLATION - ACTIVE
Nov 23, 1999CONSTRUCTION

#OB7MR03
DOB VIOLATION - ACTIVE
Dec 29, 1998PLUMBING

#STC03VW
VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
May 7, 2025Facades FISPFCS
CYCLE 9 FAILURE TO CORRECT SWARMP CONDITIONS
Active
Feb 20, 2025Facades FISPHAZ
CYCLE 9C UNSAFE REPORT FILED
Active
Feb 22, 2024Facades FISPNRF
FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
HPD (12) · C 12 · B 0 · A 0
IssuedClassViolationCorrect by
May 2, 1995CApt 2B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WALL DOOR & TRIMS CENTER NORTH ROOM 2 STY NORTHWEST APT 2B ER1 , SECTION '' ''May 22, 1995
May 2, 1995CApt 2B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING & WALLS PRIVATE HALL 2 STY NORTHWEST APT 2B WONG 866 9373 ERU , SECTION '' ''May 22, 1995
May 2, 1995CApt 2B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WITH PLASTER CEILING & WALLS BATHROOM 2 STY NORTHWEST APT 2B ER1 , SECTION '' ''May 22, 1995
May 2, 1995CApt 23 · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WITH PLASTER CEILING & WALLS KITCHEN 2 STY NORTHWEST APT 23 ER1 LOCATED AT APT 23May 22, 1995
May 2, 1995CApt 2B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT CEILING WALLS DOORS & TRIMS NORTHEAST ROOM 2 STY NORTHWEST APT 2B ER1 , SECTION '' ''May 22, 1995
May 2, 1995CApt 2B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WALLS DOORS & TRIMS NORTHEAST ROOM 2 STY NORTHWEST APT 2B ER1 , SECTION '' ''May 22, 1995
Jun 7, 1994CApt 2B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT PEELING CEILING PRIVATE HALL 2 STY APT 2B ER1. , SECTION '' ''Jun 27, 1994
Jun 7, 1994CApt 2B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT PEELING SOUTH WALL PRIVATE HALL 2 STY APT 2B ER1. , SECTION '' ''Jun 27, 1994
Dec 28, 1993CApt 2B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT EAST WEST NORTH WALLS INTERIOR DOOR AT WEST WALL CLOSET DOOR ENTRANCE DOOR TO EAST ROOM NORTHEAST 2 STY NORTHWEST APT 2B WONG 866 9373 ER1. , SECTION '' ''Jan 17, 1994
Dec 28, 1993CApt 2B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT EAST WALL DOOR EAST WEST WALLS INTERIOR DOOR ENTRANCE DOOR 2 ROOM FROM EAST 2 STY NORTHWEST APT 2B WONG ER1. , SECTION '' ''Jan 17, 1994
Dec 28, 1993CApt 2B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT INTERIOR SLIDING DOOR AT EAST WALL NORTH WALL WINDOW SILL AND FRAME SOUTH WALL NORTHWEST ROOM 2 STY NORTHWEST APT 2B ER1. , SECTION '' ''Jan 17, 1994
Dec 28, 1993CApt 2B · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT NORTH WALL CEILING 2 STY NORTHWEST APT 2B ER1. , SECTION '' ''Jan 17, 1994

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 13, 2026, 5:30 PM ET. BBL 1018920019.

Look up another building