14 floors · 7 apartments · 31,021 sq ft · built 1925 · class D4 · owner of record: 953 Fifth Ave Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 65 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 31,021 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $31,500 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 848 days | Filing window not open yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 19, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS#35549094X ISSUED ON 3/2/2021,AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2).AN ACCEPTABLE CERTIFICAT #37027090N | Jun 13, 2024 IN VIOLATION | $0 |
| Mar 2, 2021 | Construction CLASS - 1 103-04 OWNER FAILED TO REPAIR CRACKED LIMESONE-WEST FACADE,MULTI ELEVATIONS,EAST FACADE 13,14,15TH FLOORS SPALLED LIMESTONE WEST FACADE MULTI ELEVATIONS OPEN MORTAR JOINTS CRACKED BACK AT MULTIPLE LOCATIONS.DEF #35549093Y | Aug 12, 2021 IN VIOLATION | $0 |
| Mar 2, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS/FACADE.NOTE:STRUCTURE WAS OBSERVED TO HAVE 1)OPEN MORTAR JOINTS LIMESTONE EXP1 AT A)15TH FLOOR STRING COURSE B)14TH FLOOR CORNICE C)4TH FLOOR WATER TABLE D)MISC ELEVA #35549094X | May 20, 2021 STIPULATION/IN-VIO | $0 |
| Mar 19, 2007 | Construction Non-Hazardous WORK DOES NOT CONFORM TO APPROVED PLANS.WORK NOTED:WORK IN PROGRESS UNDER APPLICATION 104666522 PLAN DATED 2-2-07.INDICATE MAIDS BATHROOM TOBE DEMOLISHED & NEW ROUGH INS-WHICH IN FACT BATH 1,BATH 2 & MASTER BAT #34558342Y | Oct 18, 2007 DEFAULT | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 16, 2024 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS #00660 | DOB VIOLATION - ACTIVE |
| Feb 16, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9C UNSAFE REPORT FILED #911483 | DOB VIOLATION - ACTIVE |
| Jun 2, 2022 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00111 | DOB VIOLATION - ACTIVE |
| May 26, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00078 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 16, 2024 | Facades FISPFCS CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Feb 16, 2024 | Facades FISPHAZ CYCLE 9C UNSAFE REPORT FILED | Active |
| Jun 2, 2022 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 26, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
None open.