| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 304 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 791 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 24, 2025 | Construction CLASS - 2 CONSTRUCTION FENCE VIEWING PANELS AT EXPOSURE 1 ARE OBSTRUCTED, PREVENTING A CLEAR VIEW INTO THE SITE AS REQUIRED. PANELS ARE COVERED IN GRAFFITI OR OTHERWISE NOT TRANSPARENT, WHICH IS CONTRARY TO APPROVED SAFE #39542764J | Oct 1, 2025 DEFAULT | $5,000 |
| Jan 17, 2025 | Construction CLASS - 2 OBSERVED CONSTRUCTION FENCE ERECTED AT EXPO#1 WITH GRAFFITI THROUGHOUT AND AT ADJACENT PROPERTY (953 GREENE AVENUE) THE FENCE NEAR THE STEPS IS NOT RAISED TO REQUIRED HIGH OF 8 FT, ALLOWING THE PUBLIC TO EASIL #39536105P | Aug 11, 2026 IN VIOLATION | $1,000 |
| Dec 22, 2023 | Construction CLASS - 2 VIOLATING CONDITIONS OBSERVED. CONSTRUCTION FENCE PERMIT #B00148647 EXPIRED ON 12/4/2023 AT EXPOSURE #1.RENEW PERMIT #39524294P | Feb 28, 2024 IN VIOLATION | $625 |
| Oct 23, 2020 | Construction CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35415851K ISSUED ON 07/08/19 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O PERMIT AT FRONT SIDE OF BLDG. REMEDY: COMP #35523025R | Mar 3, 2021 DEFAULT | $6,250 |
| Feb 3, 2020 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35415851K ISSUED ON 7/8/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK W/O A PERMIT.NOTED:AT #35516791K | Mar 1, 2021 DEFAULT | $12,500 |
| Sep 13, 2018 | Construction CLASS - 2 WORK W/O A PERMIT. NOTED: AT 2ND FLOOR LEVEL WATER AND WASTE LINES INSTALLED FOR AN ADDITIONAL 3PC BATHROOM (TOILET,SINK,TUB) RESIDENTIALSINK. RMDY: OBTAIN PERMIT. #35349286Y | Dec 17, 2018 DEFAULT | $3,125 |
| Sep 13, 2018 | Construction CLASS - 2 28-210.1 RESIDENCE CONVERTED, MAINTAINED OR OCCUPIED AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES. NOTED:CERTIFICATEOF OCCUPANCY #3P0006680 INDICATES A 3FAMILY, 1ST, 2ND, AND 3RD FLR (DW #35349285M | Dec 17, 2018 DEFAULT | $6,250 |
| Sep 13, 2018 | Construction CLASS - 2 WORK W/O PERMIT. NOTED: AT FRONT YARD A METAL DECK APRPX 15'W X 10'L X 12'H ERECTED WITH METAL RAILINGS, SUPPORTED BY METAL POSTS AND ATTACHED TO BUILDING. RMDY: OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDIT #35349287X | Dec 17, 2018 DEFAULT | $3,125 |
| Aug 30, 2018 | Construction CLASS - 2 28-210.1 RESIDENCE CONVERTED, MAINTAINED, OR OCCUPIED AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES. CO#3P0006680 INDICATE PREMISES TO BE A 3FAMILY (BASEMENT, 1ST, 2ND FLR) NOW PREMISE #35336597Z | Dec 17, 2018 DEFAULT | $6,250 |
| Aug 30, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED 2ND FLOORHALLWAY CEILING REMOVED APPROXIMATELY 10'W X 6'L WITH WOOD BEAM SHOWING AND ELECTRICAL WIRING HANGING. RMDY: MAINTAIN ENTIRE BUILDING. #35336596R | Dec 17, 2018 DEFAULT | $3,125 |