Brooklyn · Block 5583 · Lot 55 · 11219

950 39 Street

1 floors · 11,936 sq ft · built 1930 · class K1 · owner of record: 39th St. Properties, Llc

1open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
433dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 433 days
Next cycle year 2027
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-01 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $1,250 owed
IssuedViolationHearingBalance
Oct 13, 2026Construction CLASS - 2
AT SECOND FLOOR OF NEW UTRECHT STREET SIDE EXP 1 THE FACADE WAS ALTERED TO INSTALL 3 WINDOWS APPROX 36" X 60". STREET PICTURES FROM SEPT 2022 INDICATE THAT THE FACADE WAS SOLID., OBTAIN ALL PERMITS
#39207571P
Dec 23, 2026
PENDING
$1,250
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 13, 2026ECBConstruction: AT SECOND FLOOR OF NEW UTRECHT STREET SIDE EXP 1 THE FACADE WAS ALTERED TO INSTALL 3 WINDOWS APPROX 36" X 60". STREET PICTURES FROM SEPT 2022 INDICATE THAT THE FACADE WAS SOLID., OBTAIN ALL PERMITSOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 3:52 AM ET. BBL 3055830055.

Look up another building