4 floors · 7 apartments · 6,049 sq ft · built 2020 · class C1 · owner of record: Bhnn 95 Central Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 69 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 18, 2023 | Construction CLASS - 2 VIOLATING CONDITION OBSERVED: AT THE TIME OF INSPECTION I OBSERVED CONSTRUCTION FENCE AT EXPOSURE #1 HAS GRAFFITI AND POST ADVERTICEMENT THROUGH OUT FENCE. VIO FOR FAILURE TO MAINTAIN CONSTRUCTION FENCE. CONST #39520718L | Apr 8, 2024 IN VIOLATION | $1,000 |
| Nov 28, 2022 | Construction CLASS - 2 OBSERVED A SIDEWALK SHED IN PLACE @ EXPOSURE 1, NO PROJECT INFORMATION PANEL/SIDEWALK SHED PARAPET PANEL/CONSTRUCTION SIGN WAS PROVIDED. WHERE A SIDEWALK SHED IS INSTALLED, A SIDEWALK SHED PARAPET PANEL MEETING #39509586L | Jul 11, 2023 IN VIOLATION | $1,250 |
| May 7, 2021 | Unknown CLASS - 2 ON EXPOSURE #2 AND EXPOSURE #4 FROM 1ST FLOOR TO 3RD FLOOR CONTINUES INSULATION R-11.4 BETWEEN ADJACENT BUILDING IS NOT PLACED AS PER EN-011.00 INSTALL INSULATION AND R-VALVE THAT MEET REQUIREMENTS #35408109K | Feb 28, 2022 IN VIOLATION | $2,000 |
| Feb 5, 2021 | Unknown CLASS - 1 FAIL TO MAINTAIN A RECORD OF ORIENTATION PERFORM AT JOB SITE.NOTE:AT THE TIME OF MY INSPECTION OF A 4 STORY NEW BLDG CONSTRUCTION WORK IN PROGRESS AT 3 FL DECK LEVEL.I ASKED MR.JUAN MEDINA SITE SAFETY SUPERVISO #35543889M | Aug 1, 2022 IN VIOLATION | $2,500 |
| Feb 5, 2021 | Signs CLASS - 1 CONSTRUCTION SUPERINTENDENT FAIL TO PERFORM HIS DUTIES.NOTE:AT THE TIME OF MY INSPECTION OF A 4 STORY NEW BLDG CONSTRUCTION WORK IN PROGRESSAT 3RD FL LEVEL,I OBSERVED SUPERINTENDENT LOGBOOK & PRE-SHIFT SAFETY #35543894R | Jun 16, 2021 IN VIOLATION | $2,500 |
| Feb 5, 2021 | Construction CLASS - 1 MANUFACTOR SPECIFICATION NOTE:AT THE TIME OF MY INSPECTIONS OF A 4 STORY NEW BLDG CONSTRUCTION WORK IN PROGRESS 3RD FL LEVEL APPROX.20 FT INHEIGHT,I OBSERVED WORKERS USING 6FT LADDER ON THE 2ND FL TO GO UP TO #35543893P | Aug 1, 2022 IN VIOLATION | $2,500 |
| Feb 5, 2021 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED DESIGN DRAWING.NOTE:AT THE TIME OF MY INSPECTION OF A 4 STORY NEW BLDG CONSTRUCTION WORK IN PROGRESS AT 3RD FL LEVEL I OBSEVED "C" JOST METAL INSTALL THROUGHOUT THE BLDG NOT #35543895Z | Aug 1, 2022 IN VIOLATION | $625 |
| Feb 5, 2021 | Construction CLASS - 1 SIDEWALK SHED WHERE REQUIRE.NOTE:AT TIME 0F MY INSPECTION OF A 4 STORYNEW BLDG 54 FT AT 3RD FL LEVEL APPROX. 20 FT IN HEIGHT & 8 FT SET BACKFROM PEDESTRIAN SIDEWALK.I OBSERVED THAT THERE INGRESS NO SIDEWALK SHE #35543890J | Aug 1, 2022 IN VIOLATION | $10,000 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 1:48 AM ET. BBL 3031730004.