Queens · Block 8975 · Lot 100 · 11421

95-16 89 Avenue

3 floors · 45,418 sq ft · built 2010 · class W1 · owner of record: Nyc Department Of Education

21open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
60dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 60 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 45,418 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 181 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 181 days
Annual filing

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Mar 3, 2026Construction CLASS - 2
EXIT DOOR NOT SELF CLOSING PROPERLY AT THE TIME OF INSPECTION AT CELLAR LEVEL NEAR RM C 05 ONE CORRIDOR EXIT DOOR AND 1ST FLOOR MULTIPURPUS ROOM NEAR RM 104 ONE EMERGENCY EXIT DOOR NOT IN OPERATION WHEN TESTED.
#35728709R
Mar 23, 2026
POP/IN-VIO
$0
Mar 3, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.AT THETIME OF INPECTION OBSERVED AND NOTED AT CELLAR LEVEL CAFETERIA 6 PLACE
#35728710Y
Mar 23, 2026
POP/IN-VIO
$0
Mar 20, 2025Construction CLASS - 2
FAILURE TO PROVIDE POWER FOR EMERGENCY LIGHTING.EMG LIGHTING BATTERY NOT WORKING WHEN TESTED 12 UNIT IN SCHOOL NOT WORKING WHEN TESTED.REM:PROVIDE ADEQUATE POWER FOR EMERGENCY EXIT LIGHTING.
#35691618P
Jul 8, 2025
POP/IN-VIO
$0
DOB (3)
IssuedViolationStatus
Jul 30, 2020ELEVATOR

#9027/685989
DOB VIOLATION - ACTIVE
Jul 30, 2020ELEVATOR

#9027/685990
DOB VIOLATION - ACTIVE
Oct 1, 2019RETAINING WALL
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
#01171
DOB VIOLATION - ACTIVE
DOB NOW Safety (15)
IssuedViolationStatus
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 29, 2026Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Oct 1, 2019Retaining Walls FTF-RW-INITL
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen
Oct 29, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of CorrectionOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 8:40 AM ET. BBL 4089750100.