3 floors · 2 apartments · 3,150 sq ft · built 1930 · class S2 · owner of record: Mas (Ny) Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 64 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-07 (Accepted). Agency page | Dec 31, 2026 in 64 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Required only if the owner doesn't live there |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | IMMEDIATE EMERGENCY INSTALL APPROXIMATELY 30 LINEAR FEET OF SIDEWALK SHED ALONG EXPOSURE 1 (ATLANTIC AVENUE) INCLUDING A 5' EXTENSION AT EXPOSURE 4 PROPERTY 942 ATLANTIC AVENUE TO SAFEGUARD THE PUBLIC AND PROPERTY #20637 | DOB VIOLATION - ACTIVE |
| Oct 1, 2026 | CONSTRUCTION STRUCTURAL RENDERED NON-COMPLAINT, AT TIME OF INSPECTION OBSERVED BRICKS AT CORNER OF EXPOSURE 1,4 AND 3,4 IN STATE OF DISREPAIR DUE TO CONSTRUCTION ACTIVITIES AT 940 ATLANTIC AVENUE. #26-02340 | DOB VIOLATION - ACTIVE |
| Oct 1, 2026 | CONSTRUCTION FTM-THE ADJ EXP4 PROPERTY 942 ATLANTIC AVE WAS DEMOLISHED &GRADED.EXP 1/4 CORNER & EXP3/4 CORNERS OF BLDG ARE STRUCT COMPROMISED DUE TO IMPROPER/UNSAGE CONST/DEMO AT THE ADJ 942 ATLANTIC AVE.BLDG TO PERM REPAIRED/DEMOLISHED UNDER PERMIT STARTING BY 10/26/26 & SIGNED OFF/ COMPLETED BY 12/11/2026 #FEU30801BP | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #29433 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB | IMMEDIATE EMERGENCY: INSTALL APPROXIMATELY 30 LINEAR FEET OF SIDEWALK SHED ALONG EXPOSURE 1 (ATLANTIC AVENUE) INCLUDING A 5' EXTENSION AT EXPOSURE 4 PROPERTY 942 ATLANTIC AVENUE TO SAFEGUARD THE PUBLIC AND PROPERTY | Open |
| Oct 1, 2026 | DOB | CONSTRUCTION: STRUCTURAL RENDERED NON-COMPLAINT, AT TIME OF INSPECTION OBSERVED BRICKS AT CORNER OF EXPOSURE 1,4 AND 3,4 IN STATE OF DISREPAIR DUE TO CONSTRUCTION ACTIVITIES AT 940 ATLANTIC AVENUE. | Open |
| Oct 1, 2026 | DOB | CONSTRUCTION: FTM-THE ADJ EXP4 PROPERTY 942 ATLANTIC AVE WAS DEMOLISHED &GRADED.EXP 1/4 CORNER & EXP3/4 CORNERS OF BLDG ARE STRUCT COMPROMISED DUE TO IMPROPER/UNSAGE CONST/DEMO AT THE ADJ 942 ATLANTIC AVE.BLDG TO PERM REPAIRED/DEMOLISHED UNDER PERMIT STARTING BY 10/26/26 & SIGNED OFF/ COMPLETED BY 12/11/2026 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 5:10 PM ET. BBL 3011240021.