| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 430 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 23, 2022 | Construction CLASS - 1 AT TIME OF INSPECTION , I OBSERVED NEW WORK AT EXPOSURE 1 SHOWING USG GLASS SHEATHING INSTALLED CONTRARY TO PREVIOUS INSPECTION PHOTOS. NEW WORK AFTER SWO ISSUED. STOP ALL WORK #39509502P | Dec 20, 2024 IN VIOLATION | $5,000 |
| Oct 7, 2022 | Construction CLASS - 2 AT TIME OF INSPECTION OF INACTIVE CONSTRUCTION ON A PROPOSED 3 STORY NEW BUILDING I OBSERVED NO COMPLIANCE FOR PREVIOUS CLASS 1 VIOLATION 39504533P ISSUED ON 8-3-22 WITH NO CERTIFICATE OF CORRECTION ON FILE VIO #39507290N | Oct 21, 2024 DEFAULT | $3,125 |
| Oct 7, 2022 | Construction CLASS - 2 AT TIME OF INSPECTION OF INACTIVE CONSTRUCTION ON A PROPOSED 3 STORY NEW BUILDING I OBSERVED NO COMPLIANCE FOR PREVIOUS CLASS 1 VIOLATION 39504532N ISSUED ON 8-3-22 WITH NO CERTIFICATE OF CORRECTION ON FILE. VI #39507289X | Oct 21, 2024 DEFAULT | $3,125 |
| Oct 7, 2022 | Construction CLASS - 2 AT TIME OF INSPECTION OF INACTIVE CONSTRUCTION ON A 3 STORY NEW BUILDING I OBSERVED NO COMPLIANCE IN REGARD TO CORRECTING PREVIOUS ENFORCED CLASS 1 VIOLATION 39504529M FOR GUARDRAILS AT ROOF LEVEL WITH A CERTIF #39507287M | Oct 21, 2024 DEFAULT | $3,125 |
| Aug 3, 2022 | Construction CLASS - 1 ON AN ACTIVE JOBSITE WITH 10 WORKERS ONSITE, I REQUESTED TO SEE ALL DOCUMENTS AND NONE WERE PROVIDE. AS PER CODE, ALL DOCUMENTS MUST BE ONSITE AND PROVIDED UPON REQUEST ON ACTIVE CONSTRUCTION SITE.STOP ALL WOR #39504533P | Nov 20, 2023 IN VIOLATION | $1,250 |
| Aug 3, 2022 | Construction CLASS - 1 AN ACTIVE JOBSITE WITH 10 WORKERS ONSITE, I OBSERVED AT ROOF LEVEL THAT THERE WERE MISSING GUARDRAILS. THE MISSING GUARDRAIL CREATES A HAZARDOUS CONDITION FOR WORKERS WALKING OR NEAR THE LEADING EDGE OF THE ROO #39504529M | Nov 20, 2023 IN VIOLATION | $2,500 |
| Aug 3, 2022 | Construction CLASS - 1 AN ACTIVE JOBSITE WITH 10 WORKERS ONSITE, THERE WAS LARGE CONSTRUCTION DEBRIS THROUGHOUT THE SITE WITH OPEN HOLES, UNEVEN GROUND, AND OBSTRUCTIVE MEANS OF EGRESS. INADEQUATE HOUSEKEEPING CREATES A HAZARDOUS WOR #39504532N | Nov 20, 2023 IN VIOLATION | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 17) | Active |
None open.