5 floors · 8 apartments · 13,187 sq ft · built 2017 · class C7 · owner of record: 929 43 St Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 430 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 25, 2019 | Construction CLASS - 1 3307.7.7 CONDITION OF A CONSTRUCTION FENCE-EXPO 1&4 @THE TIME OF INSPECTION OF A 5 STY NB, OBSERVED @THE STREET LVL THE CONST FENCE WAS NOT IN DEPT CODE CONDITION(NO PLUMB, PLYWOOD DAMAGED SHARP EDGES)NOT KEEP #35460395Z | Mar 4, 2020 IN VIOLATION | $625 |
| Jul 10, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35345346Z ISSUED ON 08/21/18,AND TO FILE A CERTIFICATE OF PURSUANT TO 28-201.1 AND 1RNCY 102-01(D)(2).AN ACCEPTIBLE CERTIFICATE HAS #37015375Z | Dec 9, 2019 IN VIOLATION | $625 |
| Sep 24, 2018 | Construction CLASS - 2 WORK DOES NOT CONFORM TO THE APPROVED CONSTRUCTION DOCUEMNT AND OR APPROVED AMENDMENTS.THE RESPONDENT WHO IS TH HOLDER OF PERMIT#321186426 FAILED TO CONFORM TO THE APPROVED PLANS FOR THE INSTALLATION OF THE SUP #35353681X | Dec 24, 2018 DEFAULT | $3,125 |
| Aug 21, 2018 | Construction CLASS - 1 FAILURE TO PROTECT ADJOINING STRUCTURES DURING EXCAVATION OPERATIONS. AT THE TIME OF MY INSPECTION IT WAS OBSERVED THAT ON AN ACTIVE CONSTRUCTION SITE THERE WAS NO MONITORING IN PLACE TO MONITOR FOR MOVEMENT DU #35345348M | Nov 5, 2018 IN VIOLATION | $5,000 |
| Aug 21, 2018 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT THE TIME OF MY INSPECTION IT WAS OBSERVED THAT ON ACTIVE CONSTRUCTION SITE W/ UNDERPINING AND CONCRETE WORK THERE WAS MISS #35345346Z | Nov 5, 2018 STIPULATION/IN-VIO | $1,250 |
| Aug 21, 2018 | Construction CLASS - 1 BC 3309.6 FAILURE TO MONITOR ADJOINING STRUCTURES FOR MOVEMENT IN ALL DIRECTIONS DURING EXCAVATION-RELATED ACTIVITY THAT MAY ADVERSELY AFFECT ADJOINING STRUCTURES. AT THE TIME OF MY INSPECTION IT WAS OBSERVED T #35345347K | Nov 5, 2018 IN VIOLATION | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
None open.