4 floors · 23,228 sq ft · built 2018 · class H3 · owner of record: 928 Coney Island Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 408 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 9, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED HOLE PENETRATIONS IN SERVER ROOM. LOCATED ON 3 FLOOR. PREVIOUS VIO # 39127034J, REPAIR AND/REPLACE #39203454H | Jan 13, 2027 | $6,250 |
| Sep 9, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED COMBUSTIBLE STORAGE IN ELECTRICAL ROOM/SERVER ROOM. LOCATED ON 3RD FLOOR. PREVIOUS VIO# 39127037P, REPAIR AND/REPLACE #39203455J | Jan 13, 2027 | $6,250 |
| Sep 27, 2021 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER-CIVIL PENALTIES-ORIGINAL COMPLAINT #3815463-NOTE:AT THE TIME OF MY INSPECTION OF A PROPOSED 4 STORY NEW BLDG UNDER CONSTRUCTION.AN ACTIVE JOB SITE #35506413Y | Aug 26, 2022 IN VIOLATION | $5,000 |
| Sep 27, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING.CLEAN UP THE EXP.#1 & THE MULTIPLE LEVELS W/IN THE BLDG MATERIAL CONSTRUCTION DEBRIS PILED UP & STORED OVERNIGHT,ALL CONSTRUCTION DEBRIS MUST BE REMOVED AT THE END OF #35506407H | Feb 9, 2022 IN VIOLATION | $2,500 |
| Sep 27, 2021 | Construction CLASS - 1 BC3304.4.1 SUPPORT OF EXCAVATION THE SIDES OF ALL EXCAVATIONS THAT ARE5 FT OR GREATER IN DEPTH SHALL BE PROTECTED & MAINTAINED STOP ALL EXCAVATION/INSTALL OF REMAINS WALL BACK FILL IMMEDIATELY-CALL C.S.E FOR RE #35506411K | Feb 9, 2022 IN VIOLATION | $2,500 |
| Sep 27, 2021 | Construction CLASS - 2 FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS-STOP ALL EXCAVATION-STOP ALL RETAINING WALL OPERATIONS-BACKFILL EXPOSED/UNDERINED SECTIONS OF RETAINING WALL-CALL. C.S.E FOR RE-I #35506409L | Aug 26, 2022 IN VIOLATION | $5,000 |
| Sep 27, 2021 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS.THE RETAININGWALL BEING INSTALLED DOES NOT CONFIRM TO APPROVED DRAWING THE WALL IS BEING INSTALLED VERTICALLY AS WHERE THE APPROVED DRAWINGS INDICATE THE #35506410Z | Aug 26, 2022 IN VIOLATION | $2,500 |
| Sep 27, 2021 | Construction CLASS - 2 FAILURE TO PROVIDED APPROVED CONSTRUCTION DOCUMENTS AT JOBSITE AT TIMEOF INSPECTION AT TIME OF INSPECTION OBSERVED EXCAVATION ENCROUCHING ONNEIGHBORING PROPERTY.-STOP ALL EXCAVATION & RELAYING WALL INSTALLATION #35506412M | Feb 9, 2022 IN VIOLATION | $625 |
| May 28, 2021 | Construction CLASS - 2 JOBSITE FENCE NOT CONST OR MAINTAINED PURSUANT TO SUBSEC.ATO MY INSP OF 4STYBLDG I OBSERVED CONST FENCE DISLODGE&LEANING TO SIDEWALK@EXP1&2,&LEANING TOWARD BLDG@EXP4.FAILURE TO MAINTAIN FENCE AS REQUIRED IN GOO #35552797J | Oct 6, 2021 IN VIOLATION | $500 |
| May 28, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SEC REQUIREMENTS.ATO MY INSP OF 4STYBLDG I OBSERVED STORAGE OF MATERIAL@EXP1&3.ACCORDING TO PICS FROM SCO AVRAAM MICHAEL ZAROMATIDIS ON5/20/21,SAME VIOLATING CONDIT #35552796H | Oct 6, 2021 IN VIOLATION | $2,500 |
| Oct 7, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN ADEQUATE CONSTRUCTION HOUSEKEEPING PER SECTION REQUIREMENTS. AT TIME OF INSPECTION OF A 4 STY BLDG UNDER CONSTRUCTION,I OBSERVED DEBRIS PILED IN FRONT & REAR YARDS OF THE SITE,EXP#1&3(BUCKET #35504096K | Feb 17, 2022 DEFAULT | $6,250 |
| Oct 7, 2020 | Site Safety CLASS - 1 FAILURE TO HAVE A CONSTRUCTION SUPERINTENDENT OR COMPETENT PERSON PRESENT AT SITE AS REQUIRED. AT TIME OF INSPECTION OF A 4 STY NEW BLDG UNDER CONSTRUCTION,I OBSERVED MULTIPLE WORKERS ON SITE,AT LEAST ONE PERFO #35504095Z | Oct 15, 2021 IN VIOLATION | $10,000 |
| Dec 24, 2019 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION(NO GUARDRAILS)AT TIME OF INSPECTION ON AN ACTIVE 4 STORY NB CONSTRUCTION SITE,NOTICE OPENINGS UNENCLOSED PERIMETER THAT THE CONT #35464904X | Jul 14, 2021 IN VIOLATION | $2,500 |
| Dec 24, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER CODE.AT TIME OF INSPECTION ON AN ACTIVE 4 STORY NB CONSTRUCTION SITE NOTICE ON EACH FLOOR AT GREAT DEAL OF GARBAGE/DEBRIS THROUGHOUT THE CONSTRUCTION SITE ON THE 1S #35464902M | Jul 14, 2021 IN VIOLATION | $625 |
| Dec 24, 2019 | Unknown CLASS - 1 FAILURE TO CONDUCT DAILY PRE-SHIFT SAFETY MEETINGS ON SITE AS PER CODE.AT TIME OF INSPECTION ON AN ACTIVE 4 STORY NB CONSTRUCTION SITE WHEN THE COMPETENT PERSON ON SITE WAS ASK IF DAILY PRE-SHIFT SAFETY MEETING #35464905H | Jul 14, 2021 IN VIOLATION | $5,000 |
| Dec 24, 2019 | Construction CLASS - 2 BC3301.7/FAILURE TO PROVIDE DRAWINGS FOR PLATFORM ON SITE.AT TIME OF INSPECTION ON AN ACTIVE 4 STORY NB CONSTRUCTION SITE NOTICE AT THE ROOFA MAKESHIFT PLATFORM COVERING THE ELEVATOR SHAFT THAT WAS INADEQUATE A #35464903Y | Jul 14, 2021 IN VIOLATION | $625 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 9, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED HOLE PENETRATIONS IN SERVER ROOM. LOCATED ON 3 FLOOR. PREVIOUS VIO # 39127034J, REPAIR AND/REPLACE | Closed |
| Sep 9, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED COMBUSTIBLE STORAGE IN ELECTRICAL ROOM/SERVER ROOM. LOCATED ON 3RD FLOOR. PREVIOUS VIO# 39127037P, REPAIR AND/REPLACE | Closed |
| Sep 9, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OBSERVED IN ALL WATER HEATER ROOMS LOCATED ON EACH FLOOR PVC PIPING BEING USED ON THE WATER HEATER VENTS WHICH IS CONTRARY TO FGC 503.4.1 PVC SHALL NOT BE PERMITTED., REPAIR AND/OR REP | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 9:54 PM ET. BBL 3054180038.