Queens · Block 2075 · Lot 39 · 11374

92-73 Queens Boulevard

4 floors · 61,780 sq ft · built 2015 · class K4 · owner of record: Andon Investment Limited Partnership

20open violations
$21,305ECB/OATH penalties owed
0HPD class C (immediately hazardous)
68dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 68 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 61,780 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2075). Agency page

Dec 31, 2035
in 3355 days
Next due 2035

Open violations

ECB / OATH (15) · $21,305 owed
IssuedViolationHearingBalance
Sep 16, 2026Construction CLASS - 1
ATOI OBSERVED ON THE ROOF GAS PIPING NEEDING TO BE MAINTAINED SOME PARTS NOT PAINTED ALSO SOME PARTS RUSTED. GAS PIPE MUST BE PROPERLY MAINTAINED AT ALL TIMES., REPAIR AND/REPLACE
#39204423J
Nov 24, 2026
PENDING
$2,500
Sep 16, 2026Construction CLASS - 1
ATOI OBSERVED IN THE GARAGE AREA A MAKE SHIFT CAR DETAILING SHOP IN WHICH THEY HAD A HOSE PULLING WATER FROM A HOSE BIB CONNECTED TO THE FIRE SUPPRESSION SYSTEM BOOSTER PUMP PIPING., REPAIR AND/REPLACE
#39204427R
Nov 24, 2026
PENDING
$2,500
Sep 16, 2026Construction CLASS - 1
ATOI OBSERVED THE WATER HEATERS ON THE 3RD AND 4TH FLOOR BEING HOUSED IN A TIGHT CLOSET NOT ALLOWING ACCESS TO THE WATER HEATERS FOR SERVICE OR REPAIR. CONTRARY TO - FGC 306.1 - APPLIANCES AND ASSOCIATED COMPON
#39204425N
Nov 24, 2026
PENDING
$2,500
Sep 16, 2026Elevators CLASS - 2
CLASS 2: FIREFIGHTER'S SERVICE PHASE II - PHASE II DOES NOT BYPASS RESTRICTED ACCESS TO FLOOR 2, FAILING REQUIRED FIRE EMERGENCY ACCESS FUNCTION. AS PER ASME A17.1 2.27. REMEDY: RESTORE PROPER PHASE II OPERATIO
#39204312R
Nov 24, 2026
PENDING
$625
Sep 16, 2026Construction CLASS - 1
ATOI OBSERVED HOT WATER HEATERS ON THE 3RD & 4TH FLOORS INSTALLED USING PVC ON THE FRESH AIR INTAKES AND ON THE THIRD FLOOR THE FRESH AIR IS BEING VENTED INTO THE HALLWAY RATHER THEN FROM OUT SIDE THE BUILDING
#39204424L
Nov 24, 2026
PENDING
$2,500
Sep 16, 2026Elevators CLASS - 2
CLASS 2: 1. TOP-OF-CAR OUTRIGGING - OUTRIGGING NOT SECURED, CREATING AN UNSAFE TOP-OF-CAR CONDITION. AS PER ASME A17.1 8.6. REMEDY: SECURE OUTRIGGING AND VERIFY SAFE TOP-OF-CAR ACCESS. 2. OIL ON TOP OF CAR AND
#39204313Z
Nov 24, 2026
PENDING
$625
Sep 16, 2026Construction CLASS - 2
AT THE TIME OF INSPECTION OBSERVED PVC BEING USED FOR DRAINAGE IN THE THE FIRE PUMP ROOM. CONTRARY TO PC 701.9 PLASTIC PIPING AND FITTINGS SHALL NOT BE USED., REPAIR AND/OR REPLACE
#39204426P
Nov 24, 2026
PENDING
$1,250
Sep 16, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED HOLE PENETRATIONS, PLASTIC ACCESS PANELS. LOCATED THROUGHOUT BUILDING., REPAIR AND/REPLACE
#39204605K
Nov 24, 2026
PENDING
$2,500
Sep 16, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED UNPROHIBITED HARDWARE ON PUBLIC CORRIDOR DOOR. POTENTIAL HAZARD IN AN EMERGENCY., REPAIR AND/OR REPLACE
#39204604Z
Nov 24, 2026
PENDING
$1,250
Sep 16, 2026Construction CLASS - 1
ATOI OBSERVED THE THIRD FLOOR WATER HEATER INSTALLED WITHOUT ANY PERMITS FILED ON BIS OR DOBNOW CONTRARY TO PC 106.1 PLUMBING WORK INCLUDING WATER HEATER INSTALLATIONS AND PLUMBING SYSTEM ALTERATIONS, REQUIRES
#39204422H
Nov 24, 2026
PENDING
$2,500
Sep 23, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSERVED HOLE PENETRATIONS THROUGHOUT FLOORS 4,3 AND 1. COVERED WITH PROBHITED PL
#39161276L
Oct 29, 2026
DEFAULT
$1,280
Sep 23, 2025Construction CLASS - 2
EXIT DOOR NOT SELF-CLOSING. LOCATED ON 3RD FLOOR, EMERGENCY EXIT DOOR NOT FUNCTIONING PROPERLY. DOOR DOES NOT OPEN ALL THE BECAUSE OF THE ARM ON TOP OF THE DOOR DEFECTIVE. POTENTIAL FIRE HAZARD., REPAIR/REPLACE
#39161275J
Oct 29, 2026
DEFAULT
$655
Sep 23, 2025Elevators CLASS - 2
CLASS 2 ITEMS: IN-CAR ALARM INOPERATIVE, REPAIR. 4 FLOOR DOOR LOCK COVER HANGING ON A SINGLE SCREW, SECURE. HOIST ROPE TAILS EXTRA LONG, SHORTEN AND SECURE.
#39161271M
Dec 2, 2025
STIPULATION/IN-VIO
$310
Sep 23, 2025Elevators CLASS - 2
CLASS 2 ITEMS: MAIN LINE SWITCH FRONT PANEL IS NOT LOCKABLE IN THE CLOSED POSITION WHEN THE POWER IS ON, REPAIR. HOIST ROPE TAILS TOO LONG, SHORTEN AND SECURE.
#39161270K
Dec 2, 2025
STIPULATION/IN-VIO
$310
Aug 25, 2014Construction CLASS - 1
3309.9 WHEATHER PROOFING INTEGRITY OF ADJOINING BLDG.@ TIME OF INSP.OF DEMO,SITE NOTED THAT @ EXP.#2 THE ADJOINING PROPERTY HAD NOT BEEN WEATHER PROOFED PROPERLY.THERE ARE OPENINGS BETWEEN THE CINDER BLOCKS THA
#35098645N
Apr 28, 2015
WRITTEN OFF
$0
DOB (0)

None open.

DOB NOW Safety (9)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 6)
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 16, 2026ECBConstruction: ATOI OBSERVED ON THE ROOF GAS PIPING NEEDING TO BE MAINTAINED SOME PARTS NOT PAINTED ALSO SOME PARTS RUSTED. GAS PIPE MUST BE PROPERLY MAINTAINED AT ALL TIMES., REPAIR AND/REPLACEOpen
Sep 16, 2026ECBConstruction: ATOI OBSERVED IN THE GARAGE AREA A MAKE SHIFT CAR DETAILING SHOP IN WHICH THEY HAD A HOSE PULLING WATER FROM A HOSE BIB CONNECTED TO THE FIRE SUPPRESSION SYSTEM BOOSTER PUMP PIPING., REPAIR AND/REPLACEOpen
Sep 16, 2026ECBConstruction: ATOI OBSERVED THE WATER HEATERS ON THE 3RD AND 4TH FLOOR BEING HOUSED IN A TIGHT CLOSET NOT ALLOWING ACCESS TO THE WATER HEATERS FOR SERVICE OR REPAIR. CONTRARY TO - FGC 306.1 - APPLIANCES AND ASSOCIATED COMPONOpen
Sep 16, 2026ECBElevators: CLASS 2: FIREFIGHTER'S SERVICE PHASE II - PHASE II DOES NOT BYPASS RESTRICTED ACCESS TO FLOOR 2, FAILING REQUIRED FIRE EMERGENCY ACCESS FUNCTION. AS PER ASME A17.1 2.27. REMEDY: RESTORE PROPER PHASE II OPERATIOOpen
Sep 16, 2026ECBConstruction: ATOI OBSERVED HOT WATER HEATERS ON THE 3RD & 4TH FLOORS INSTALLED USING PVC ON THE FRESH AIR INTAKES AND ON THE THIRD FLOOR THE FRESH AIR IS BEING VENTED INTO THE HALLWAY RATHER THEN FROM OUT SIDE THE BUILDINGOpen
Sep 16, 2026ECBElevators: CLASS 2: 1. TOP-OF-CAR OUTRIGGING - OUTRIGGING NOT SECURED, CREATING AN UNSAFE TOP-OF-CAR CONDITION. AS PER ASME A17.1 8.6. REMEDY: SECURE OUTRIGGING AND VERIFY SAFE TOP-OF-CAR ACCESS. 2. OIL ON TOP OF CAR ANDOpen
Sep 16, 2026ECBConstruction: AT THE TIME OF INSPECTION OBSERVED PVC BEING USED FOR DRAINAGE IN THE THE FIRE PUMP ROOM. CONTRARY TO PC 701.9 PLASTIC PIPING AND FITTINGS SHALL NOT BE USED., REPAIR AND/OR REPLACEOpen
Sep 16, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED HOLE PENETRATIONS, PLASTIC ACCESS PANELS. LOCATED THROUGHOUT BUILDING., REPAIR AND/REPLACEOpen
Sep 16, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED UNPROHIBITED HARDWARE ON PUBLIC CORRIDOR DOOR. POTENTIAL HAZARD IN AN EMERGENCY., REPAIR AND/OR REPLACEOpen
Sep 16, 2026ECBConstruction: ATOI OBSERVED THE THIRD FLOOR WATER HEATER INSTALLED WITHOUT ANY PERMITS FILED ON BIS OR DOBNOW CONTRARY TO PC 106.1 PLUMBING WORK INCLUDING WATER HEATER INSTALLATIONS AND PLUMBING SYSTEM ALTERATIONS, REQUIRESOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 12:41 AM ET. BBL 4020750039.

Look up another building