3 floors · 2 apartments · 3,240 sq ft · built 1931 · class S2 · owner of record: Ngan Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 42 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-23 (Accepted). Agency page | Dec 31, 2026 in 42 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 286 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 27, 2024 | Boilers CLASS - 2 FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 40000066068N0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FO #37029463X | Dec 24, 2024 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #17737 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #16325 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #05570 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #25380 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #05519 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #27034 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #21285 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #19935 | DOB VIOLATION - ACTIVE |
| Feb 5, 1996 | CONSTRUCTION #168386 | DOB VIOLATION - ACTIVE |
| Feb 5, 1996 | CONSTRUCTION #C409PR11 | DOB VIOLATION - ACTIVE |
| Feb 5, 1996 | CONSTRUCTION #34134558Y | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Feb 5, 1996 | CONSTRUCTION #34134565M | DOB VIOLATION - ACTIVE |
| Feb 5, 1996 | CONSTRUCTION #34134566Y | DOB VIOLATION - ACTIVE |
| Feb 5, 1996 | CONSTRUCTION #34134567X | DOB VIOLATION - ACTIVE |
| Feb 5, 1996 | CONSTRUCTION #C409PR08 | DOB VIOLATION - ACTIVE |
| Feb 5, 1996 | CONSTRUCTION #C409PR09 | DOB VIOLATION - ACTIVE |
| Feb 5, 1996 | CONSTRUCTION #C409PR10 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 14, 2008 | A | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING 2ND TO 3RD STY. PUBLIC HALL AT SOFFIT D23546H | Nov 17, 2008 |
| Aug 14, 2008 | A | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE TOP SASH KITCHEN WINDOW 3RD STY. APT. | Nov 17, 2008 |
| Jul 3, 2006 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF UNCAPPED STEAM LINE 1ST STORY PUBLIC HALL. | Sep 25, 2006 |
| Jul 3, 2006 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LE AK CEILING 3RD STORY PUBLIC HALL | Sep 25, 2006 |
| Jul 3, 2006 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK CEILING KITCHEN 3RD STORY APARTMENT. | Sep 25, 2006 |
| Jul 3, 2006 | B | SECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS SPOUT KITCHEN SINK 3RD STORY APARTMENT. | Sep 25, 2006 |
| Jul 3, 2006 | B | SECTION 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN IN KITCHEN SINK 3RD STORY APARTMENT. | Sep 25, 2006 |
| Jul 3, 2006 | B | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS BATHROOM 3RD STORY APARTMENT. | Sep 25, 2006 |
| Jul 3, 2006 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK CEILING FRONT EAST ROOM 3RD STORY APARTMENT. | Sep 25, 2006 |
| Jul 3, 2006 | B | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING FRONT EAST ROOM 3RD STORY APARTMENT. | Sep 25, 2006 |
| Jul 3, 2006 | B | SECTION 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASH BASIN BATHROOM 3RD STORY APARTMENT. | Sep 25, 2006 |
| Jul 3, 2006 | A | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING BATHROOM 3RD STORY PUBLIC HALL. | Oct 20, 2006 |
| Jul 3, 2006 | A | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING BATHROOM 3RD STORY APARTMENT. | Oct 20, 2006 |
| Jul 3, 2006 | B | SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES, 3RD STORY APARTMENT. | Sep 25, 2006 |
| Jul 3, 2006 | B | SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VERMIN MICE DROPPINGS 3RD STORY APARTMENT. # 2. | Sep 25, 2006 |
| Jul 3, 2006 | B | SECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS KITCHEN SINK 3RD STORY APARTMENT. | Sep 25, 2006 |
| Jul 3, 2006 | B | SECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS BATHTUB BATHROOM 3RD STORY APARTMENT # 2. | Sep 25, 2006 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 3:34 AM ET. BBL 4088700053.