2 floors · 2 apartments · 1,875 sq ft · built 1910 · class B2 · owner of record: 916 Home Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 11, 2026 | Construction CLASS - 1 DURING MY INSPECTION OF AN ACTIVE 9-STORY NB. I OBSERVED AN EXTERIOR NEEDLE BEAM SYSTEM AT EXPOSURES 2 & 4, WITH SUPPORTED SCAFFOLDING IN PLACE NOT CONFORMING TO THE APPROVED PLANS. MISSING BEAM TIE-DOWN. PLANS #39557778M | May 3, 2027 | $2,500 |
| Aug 8, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION OF A 9-STORY BUILDING AT THE APPROXIMATELY 9TH FLOOR LEVEL. I OBSERVED THAT THERE WAS NO HORIZONTAL NETTING IN PLACE AND ALTERNATIVE SYSTEM WAS NOT MAINTAIN AT WORKING DECK AS REQUIRE WITH #39557705L | Apr 2, 2027 | $5,000 |
| Aug 8, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION OF A 9-STORY BUILDING AT THE APPROXIMATELY 9TH FLOOR LEVEL. I OBSERVED THAT THERE WAS LOOSE/MISSING DEBRIS NETTING AND INADEQUATE PLANKING ON SUPPORTED SCAFFOLDING THIS CREATE UNSAFE CONDI #39557706N | Apr 2, 2027 | $5,000 |
| Jun 11, 2026 | Construction CLASS - 2 OBSERVED PLASTIC BARRIERS INSTALLED ON THE ROADWAY NOT IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS. THE BARRIERS WERE NOT INTERLOCKING AND NOT FILLED WITH WATER OR SAND, AND COULD BE EASILY DISPLACED DURING #39555380N | Feb 19, 2027 | $1,250 |
| May 1, 2026 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT TIME OF INSPECTION OBSERVED ONGOING FULL DEMOLITION OF A 2 STORY STRUCTURE WHERE ENTIRE 2ND LEVEL HAS BEEN REMOVED WITHOUT #39186886J | Feb 26, 2027 | $2,500 |
| May 1, 2026 | Construction CLASS - 1 FAILURE TO SECURE OPENINGS/PENETRATIONS OF WORKING DECK. AT TIME OF INSPECTION OBSERVED 2ND FLOOR WHERE WORKERS ARE ENGAGING IN CONSTRUCTION/DEMOLITION MULTIPLE OPENINGS/PENETRATIONS WITH A 1 STORY DROP TO 1ST #39186884X | Feb 26, 2027 | $2,500 |
| May 1, 2026 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION - NO GUARD RAILS. AT TIME OF INSPECTION OBSERVED DEMOLITION OF 2 STORY IN PROGRESS WHERE ENTIRE 2ND FL. REMOVED NO FALL PROTECTI #39186885H | Feb 26, 2027 | $5,000 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 20, 2026 | ECB | Construction: AT TIME OF INSPECTION, OBSERVED PROPOSED 9-STORY BUILDING TOPPED OFF. SCAFFOLD SUPPORT AT EXPOSURE 1 WAS INSTALLED ON A BURIED MUDSILL. CONDITION PREVENTS VERIFICATION OF THE MUDSILL'S INTEGRITY AND BEARING SUR | Closed |
| Aug 11, 2026 | ECB | Construction: DURING MY INSPECTION OF AN ACTIVE 9-STORY NB. I OBSERVED AN EXTERIOR NEEDLE BEAM SYSTEM AT EXPOSURES 2 & 4, WITH SUPPORTED SCAFFOLDING IN PLACE NOT CONFORMING TO THE APPROVED PLANS. MISSING BEAM TIE-DOWN. PLANS | Closed |
| Aug 8, 2026 | ECB | Unknown: AT TIME OF INSPECTION OF A 9-STORY BUILDING AT THE APPROXIMATELY 9TH FLOOR LEVEL. I OBSERVED THAT THERE WAS NO HORIZONTAL NETTING IN PLACE AND ALTERNATIVE SYSTEM WAS NOT MAINTAIN AT WORKING DECK AS REQUIRE WITH | Closed |
| Aug 8, 2026 | ECB | Unknown: AT TIME OF INSPECTION OF A 9-STORY BUILDING AT THE APPROXIMATELY 9TH FLOOR LEVEL. I OBSERVED THAT THERE WAS LOOSE/MISSING DEBRIS NETTING AND INADEQUATE PLANKING ON SUPPORTED SCAFFOLDING THIS CREATE UNSAFE CONDI | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 10:35 PM ET. BBL 2027190049.