3 floors · 5 apartments · 5,040 sq ft · built 1926 · class S5 · owner of record: Clinton Spicer
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 15, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION FOR VIO#39118168K . OBSERVED STAIR CASE FROM GROUND FLOOR TO ROOF LEVEL IN A STATE OF DISREPAIR ,STAIRS ARE LEANING AND SEPARATING FR #39184663N | May 13, 2027 DEFAULT | $6,280 |
| Nov 7, 2025 | Construction CLASS - 1 REMOVED OR DEFACED A WRITTEN POSTED VACATE ORDER. AT TIME OF INSPECTION, VACATE ORDER WAS NOT ON THE FRONT DOOR OF THE PREMISES., COMPLY WITH CODE #39166324J | Jul 8, 2026 IN VIOLATION | $5,000 |
| Nov 7, 2025 | Construction CLASS - 1 FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER. AT TIME OF INSPECTION, TENANTS WERE STILL OCCUPYING UNIT 3F AND 3R AGAINST A PARTIAL VACATE ORDER THAT WAS ISSUED ON 10/31/25., COMPLY WITH VACATE ORDER #39166327P | Jul 8, 2026 IN VIOLATION | $10,000 |
| Oct 31, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION RESPONDING TO AN INCIDENT OBSERVED 2FL STAIRCASE IN DISREPAIR WITH POTENTIAL OF COLLAPSING. AT 3FL UNDERSIDE OF STAIRCASE DRYWALL H #39165573X | Jul 8, 2026 IN VIOLATION | $2,500 |
| Sep 30, 2025 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS: VIOLATION CONTAINED IN SUMMONS #39118168K ISSUED ON 07/01/2024, TO DATE HAS NOT FILE A CERTIFICA #39161951X | Dec 10, 2025 DEFAULT | $12,500 |
| Sep 30, 2025 | Unknown CLASS - 2 RESIDENCE OCCUPIED AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES AUTHORIZED BY THE C OF O OR BUILDING RECORDS: AT THE TIME OF INSPECTION, OBSERVED AT THE CELLAR A ROOM CONTAINING A MATTRES #39161952H | Dec 10, 2025 DEFAULT | $10,000 |
| Jul 1, 2024 | Construction CLASS - 1 FTM BLDING: ATOI INTER STAIRWELL OBSRVD IN A STATE OF DISREPAIR. STRINGERS, RISERS & THREADS DISPLACED & SAGGING THR/OUT THE RISE AT ALL LVLS. ALUMINUM THREAD NOSE COMING APART & POSING A TRIP/FALL HZRD AT 2ND #39118168K | Oct 9, 2024 DEFAULT | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #12252 | DOB VIOLATION - ACTIVE |
| Oct 31, 2025 | CONSTRUCTION REQUESTING AN ENGINEER REPORT DUE TO DRYWALL AT UNDERSIDE OF 3FL STAIRCASE HAS COLLAPSED. 2FL STAIRCASE DRYWALL IS IN DISREPAIR WITH POTENTIAL OF COLLAPSING. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED. #25-02459 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #11152 | DOB VIOLATION - ACTIVE |
| Sep 12, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00086 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #17455 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #37568 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #39048 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #18956 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #17212 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #11388 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #10290 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #13467 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #12978 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #15127 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #18501 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #18677 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #18296 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #19476 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #20751 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #20528 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #21968 | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #20851 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 17) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 12, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 13, 2025 | I | § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS VACATE #260117 APARTMENT 2F WEST 1 IN THE ENTIRE APARTMENT LOCATED AT APT, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | — |
| Feb 2, 2026 | I | §27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WIL | — |
| Nov 13, 2025 | I | § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS VACATE #260117 APARTMENT 2R IN THE ENTIRE APARTMENT LOCATED AT APT, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | — |
| Nov 13, 2025 | I | § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS VACATE #260117 APARTMENT 3R EAST 1 IN THE ENTIRE APARTMENT LOCATED AT APT, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | — |
| Nov 13, 2025 | I | § 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS VACATE #260117 APARTMENT 3F WEST 1 IN THE ENTIRE APARTMENT LOCATED AT APT, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | — |
| Oct 14, 2026 | B | Apt 3F · (B) 27-2142(A) HMC: THE FOLLOWING DWELLING UNITS WERE REOCCUPIED WHILE BEING SUBJECT TO AN ORDER TO REPAIR/VACATE ORDER ISSUED BY THE DEPARTMENT; FILE FOR A DISMISSAL REQUEST RELATED TO THE ISSUED ORDER (SEE WWW.NYC.GOV/HPD). IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM S | Nov 18, 2026 |
| Oct 14, 2026 | B | Apt 3R · (B) 27-2142(A) HMC: THE FOLLOWING DWELLING UNITS WERE REOCCUPIED WHILE BEING SUBJECT TO AN ORDER TO REPAIR/VACATE ORDER ISSUED BY THE DEPARTMENT; FILE FOR A DISMISSAL REQUEST RELATED TO THE ISSUED ORDER (SEE WWW.NYC.GOV/HPD). IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM N | Nov 18, 2026 |
| Aug 19, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HOT WATER HEATER AT BOILER ROOM | Aug 25, 2026 |
| Aug 19, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ENTIRE ROOF COVERING | Aug 25, 2026 |
| Aug 19, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HEATING BOILER AT BOILER ROOM | Aug 25, 2026 |
| Aug 3, 2026 | B | Apt 3F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE DOOR IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 7, 2026 |
| Aug 3, 2026 | C | Apt 3F · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES FLICKERING LIGHTS FIXTURES AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 9, 2026 |
| Aug 3, 2026 | C | Apt 3F · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIR CONDITIONER PREVENTING FREE EGRESS AT FIRE ESCAPE WINDOW IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 9, 2026 |
| Aug 3, 2026 | C | Apt 3F · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT APARTMENT ENTRANCE DOOR IN THE ENTRANCE LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 17, 2026 |
| May 6, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 9, 2026 |
| Feb 9, 2026 | A | §27-2153 ADM CODE POST AND MAINTAIN A NOTICE, WRITTEN IN ENGLISH AND IN SPANISH, ON THE BUILDING ENTRANCE DOOR OR OTHER CONSPICUOUS LOCATION IN THE BUILDING COMMON AREA, STATING THAT: (1) THE BUILDING IS IN THE ALTERNATIVE ENFORCEMENT PROGRAM, (2) THAT OCCUPANTS MAY CALL 311 OR THE AEP AT 212-863-82 | May 15, 2026 |
| Dec 12, 2024 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 1st | Jan 5, 2025 |
| Dec 12, 2024 | B | Apt 3F · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 16, 2025 |
| Dec 12, 2024 | B | Apt 3F · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 16, 2025 |
| Dec 12, 2024 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 3F, | Jan 5, 2025 |
| Dec 12, 2024 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL, WAINSCOTTING AT NORTH WALL, WAINSCOTTING AT SO | Jan 5, 2025 |
| Dec 12, 2024 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) BAS | Jan 5, 2025 |
| Dec 12, 2024 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) NOR | Jan 5, 2025 |
| Dec 12, 2024 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM NORTH AT EAST WALL DOOR IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT | Jan 5, 2025 |
| Oct 3, 2024 | B | Apt 3F · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 7, 2024 |
| Oct 3, 2024 | B | Apt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 7, 2024 |
| Oct 3, 2024 | B | Apt 3F · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SHOWER STALL IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 7, 2024 |
| Jul 16, 2024 | C | Apt 3F · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE PRESUMED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH | Aug 9, 2024 |
| Jul 15, 2024 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT EAST WALL, SOUTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH | Aug 8, 2024 |
| Jul 10, 2024 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF RODENTS RATS AT SOUTH YARD | Aug 5, 2024 |
| Jul 9, 2024 | B | Apt 3F · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 13, 2024 |
| Jun 10, 2024 | C | Apt 3R · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 16, 2024 |
| Jun 10, 2024 | B | Apt 3R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 15, 2024 |
| Jun 10, 2024 | B | Apt 3R · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 15, 2024 |
| Feb 17, 2023 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF RODENTS RATS AT SOUTH YARD | Mar 15, 2023 |
| Feb 18, 2022 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF RODENTS RATS AT SOUTH COURT | Mar 16, 2022 |
| Apr 13, 2020 | B | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | May 18, 2020 |
| Apr 13, 2020 | B | Apt 3R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, WEST WALL, SOUTH WALL IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | May 18, 2020 |
| Apr 13, 2020 | B | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | May 18, 2020 |
| Apr 13, 2020 | C | Apt 3R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTME | May 11, 2020 |
| Apr 13, 2020 | C | Apt 3R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE FOYER LOCATED AT APT 3R, 3rd STORY, 1st | May 11, 2020 |
| Jul 20, 2018 | C | Apt 3R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORT | Aug 17, 2018 |
| Jul 20, 2018 | C | Apt 3R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTME | Aug 17, 2018 |
| Dec 27, 2016 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL, EAST WALL IN THE 2nd ROOM FROM EAST AT NORTH L | Jan 24, 2017 |
| Dec 27, 2016 | C | Apt 3F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) BASEBOARD AT SOUTH WALL IN THE FOYER LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM | Jan 24, 2017 |
| Mar 17, 2016 | C | Apt 3R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1 | Apr 14, 2016 |
| Mar 17, 2016 | B | Apt 3R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL, SOUTH WALL, WEST WALL IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 21, 2016 |
| Mar 17, 2016 | A | Apt 3R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 20, 2016 |
| Mar 17, 2016 | C | Apt 3R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTM | Apr 14, 2016 |
| Mar 17, 2016 | C | Apt 3R · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3R, 3rd STORY, 1st APARTM | Apr 14, 2016 |
| Mar 17, 2016 | A | Apt 3R · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 20, 2016 |
| Nov 6, 2014 | C | § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF RODENTS RATS AT SOUTH COURT | Nov 14, 2014 |
| Jun 18, 2012 | C | Apt 2F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 2F, 1st STORY, 1st | Jul 14, 2012 |
| Jun 18, 2012 | C | Apt 2F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 2F, 1st STORY, | Jul 14, 2012 |
| Aug 11, 2008 | B | Apt 3F · § 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 15, 2008 |
| Mar 9, 1999 | C | Apt 2F · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT BATHROOM CEILING 2 STY FRONT APT 2F SINGLETON 498 9732 ER1 23488 LOCATED AT APT 2F | Mar 29, 1999 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 14, 2026 | HPD B | (B) 27-2142(A) HMC: THE FOLLOWING DWELLING UNITS WERE REOCCUPIED WHILE BEING SUBJECT TO AN ORDER TO REPAIR/VACATE ORDER ISSUED BY THE DEPARTMENT; FILE FOR A DISMISSAL REQUEST RELATED TO THE ISSUED ORDER (SEE WWW.NYC.GOV/HPD). IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM S | Open |
| Oct 14, 2026 | HPD B | (B) 27-2142(A) HMC: THE FOLLOWING DWELLING UNITS WERE REOCCUPIED WHILE BEING SUBJECT TO AN ORDER TO REPAIR/VACATE ORDER ISSUED BY THE DEPARTMENT; FILE FOR A DISMISSAL REQUEST RELATED TO THE ISSUED ORDER (SEE WWW.NYC.GOV/HPD). IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM N | Open |
| Aug 20, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERIOR STAIRCASE FROM FIRST STORY TO 3 STORY AT PUBLIC HALL STAIRS | Closed |
| Aug 19, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HOT WATER HEATER AT BOILER ROOM | Open |
| Aug 19, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ENTIRE ROOF COVERING | Open |
| Aug 19, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HEATING BOILER AT BOILER ROOM | Open |
| Aug 3, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE DOOR IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 3, 2026 | HPD C | § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES FLICKERING LIGHTS FIXTURES AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 3, 2026 | HPD C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF AIR CONDITIONER PREVENTING FREE EGRESS AT FIRE ESCAPE WINDOW IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 3, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT APARTMENT ENTRANCE DOOR IN THE ENTRANCE LOCATED AT APT 3F, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 8:22 PM ET. BBL 3046980052.