Brooklyn · Block 1584 · Lot 19 · 11206

914 Broadway

3 floors · 3 apartments · 5,164 sq ft · built 1931 · class S3 · owner of record: Zi Chun Zhang

10open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 70 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 86 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 801 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#31612
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (9) · C 0 · B 8 · A 1
IssuedClassViolationCorrect by
Feb 24, 2012BApt 2 · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORYMar 30, 2012
Aug 4, 2010BApt 2 · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHSep 8, 2010
Aug 4, 2010BApt 2 · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHSep 8, 2010
Apr 21, 2008BApt 2 · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT WEST WALL AND CEILING. IN THE BATHROOM LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMay 26, 2008
Apr 21, 2008BApt 2 · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMay 26, 2008
Apr 21, 2008BSECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILED FLOOR AT PUBLIC HALL, 1st STORYMay 26, 2008
Apr 21, 2008BApt 2 · SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE MECHANICAL COUNTER BALANCE AT LOWER SASH TO WINDOW AT SOUTH WALL. IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMay 26, 2008
Apr 21, 2008BApt 2 · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMay 26, 2008
Apr 21, 2008AApt 2 · SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHJul 25, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 12:23 AM ET. BBL 3015840019.

Look up another building