307,038 sq ft · built 2009 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 58 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3886). Agency page | Dec 31, 2026 in 58 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 307,038 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-23 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 5, 2026 | Construction CLASS - 2 REISSUE#35724643P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:ON 1ST FLOOR AT MAIN ENTRANCE,2 INTERIOR FPSC DOORS ARE BLOCKED BY SECURITY CHECK-IN DESK,THERE SHOULD BE CLEAR PATH TO FPSC DOORS.R #35734883N | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 5, 2026 | Construction CLASS - 2 REISSUE#35724645Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EXIT SIGNS WERE NOT OPERATIONAL AT BASEMENT-11 EXIT #35734882L | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 5, 2026 | Construction CLASS - 2 EMERGENCY SIGNS AT ELEVATOR CALL STATIONS MISSING,DEFECTIVE OR NON-COMPLIANT WITH SECTION REQUIREMENTS.NOTED:ELEVATOR CALLS STATIONS ON 5TH FLOOR AND 1ST FLOOR ARE MISSING EVACUATION SIGNS AT ELEVATOR AREAS SIG #35734885R | Aug 24, 2026 POP/IN-VIO | $0 |
| Aug 5, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:INTERIOR FPSC DOORS DO NOT SELF CLOSE PROPERLY AT 4TH FLR-STAIRCASE B/C.3RD FLR-STAIRCASE A,B/C GYM 3078,LIBRARY 3096 SMOKE DOOR NEAR 3034.2ND FLR-STA #35734884P | Aug 24, 2026 POP/IN-VIO | $0 |
| Sep 17, 2025 | Construction CLASS - 2 RE-ISSUE #35677591N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT FIRST FLOOR, MAIN ENTRANCE, 2 EXIT DOORS "INTERIOR" ARE BLOCKED BY SECURITY DESK CHECK IN FOR STUDENTS. INTERIOR SMOKE DOORS #35724643P | Oct 24, 2025 POP/IN-VIO | $0 |
| Sep 17, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: ON 5TH FLR-"STAIRCASE C" EXIT SIGN WAS NOT ILLUMINATED AT THE TI #35724645Z | Oct 24, 2025 POP/IN-VIO | $0 |
| Jul 29, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT FIRST FLOOR,MAIN ENTRANCE,2 EXIT DOORS ARE BLOCKED BY SECURITY DESK CHECKIN FOR STUDENTS.REM:KEEP THE EXIT DOOR UNBLOCK. #35677591N | Oct 8, 2024 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 6) | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
| Aug 5, 2026 | ECB | Construction: REISSUE#35724643P FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:ON 1ST FLOOR AT MAIN ENTRANCE,2 INTERIOR FPSC DOORS ARE BLOCKED BY SECURITY CHECK-IN DESK,THERE SHOULD BE CLEAR PATH TO FPSC DOORS.R | Open |
| Aug 5, 2026 | ECB | Construction: REISSUE#35724645Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EXIT SIGNS WERE NOT OPERATIONAL AT BASEMENT-11 EXIT | Open |
| Aug 5, 2026 | ECB | Construction: EMERGENCY SIGNS AT ELEVATOR CALL STATIONS MISSING,DEFECTIVE OR NON-COMPLIANT WITH SECTION REQUIREMENTS.NOTED:ELEVATOR CALLS STATIONS ON 5TH FLOOR AND 1ST FLOOR ARE MISSING EVACUATION SIGNS AT ELEVATOR AREAS SIG | Open |
| Aug 5, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:INTERIOR FPSC DOORS DO NOT SELF CLOSE PROPERLY AT 4TH FLR-STAIRCASE B/C.3RD FLR-STAIRCASE A,B/C GYM 3078,LIBRARY 3096 SMOKE DOOR NEAR 3034.2ND FLR-STA | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 4:13 AM ET. BBL 4038860800.