2 floors · 2 apartments · 2,916 sq ft · built 1930 · class S9 · owner of record: Jw Realty Management Services Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 304 days | Required only if the owner doesn't live there |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1156 days | Next cycle year 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-22 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 29, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION SECTIONS OF THE ROOF ARE OPEN AND EXPOSED. THE MEMBRANE HAS OPENED AND LEFT THE SHEATHING TO DETERIORATE., REPAIR AND/REPLACE #39158828N | Jun 1, 2027 DEFAULT | $12,500 |
| Mar 17, 2022 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.NOTED AT CELLAR LEVEL CEILING NO PROTECTION WITH 1 HOUR FIRE RATED PROTECTION I-BEAM SPLIT IN SEVERAL SECTIONS AND OPENING BET #35634931K | Nov 14, 2022 IN VIOLATION | $0 |
| Mar 17, 2022 | Construction CLASS - 2 WORK WITHOUT A PERMIT.WORK NOTED AT CELLAR LEVEL ERECTED FULL HEIGHT PARTITION WALLS TO CREATE EXTRA ROOM AT REAR NEXT NEW INTERAL STAIRCASEPARTITION MADE WITH COMBUSTIBLE MATERIAL.REMEDY:OBTAIN PERMIT. #35634929L | Nov 14, 2022 IN VIOLATION | $0 |
| Mar 17, 2022 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPT OF BUILDING RECORDS.ILLEGAL OCCUPANCY.NOTED AT CELLAR LEVEL HAS BEEN EQUIPPED AND ARRANGED ASADULT ESTABLISHMENT CREATING DUPLEX WITH 1ST FLOOR.REMEDY:DISCONTINUE #35634928J | Nov 14, 2022 IN VIOLATION | $0 |
| Mar 17, 2022 | Construction CLASS - 1 704.FAILURE TO PROVIDE FIRE RESISTANCE MATERIAL TO STRUCTURAL MEMBER.NOTED AT CELLAR LEVEL FLOOR EQUIPPED AND MANAGED AS ADULT ESTABLISHMENTHAVING SRO STRUCTURAL MEMBER EXPOSE WITHOUT REQUIRED FIRE PROTECTION.R #35634930Z | Nov 14, 2022 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #10401 | DOB VIOLATION - ACTIVE |
| Aug 29, 2025 | CONSTRUCTION REQUESTING AN ENGINEER REPORT DUE TO ROOF BEING IN A STATE OF DISREPAIR. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED. #25-02054 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #09336 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #30845 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #15474 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 4:20 PM ET. BBL 3020120038.