Brooklyn · Block 5407 · Lot 29 · 11218

904 Mcdonald Avenue

3 floors · 3 apartments · 3,300 sq ft · built 1920 · class C0 · owner of record: Corner Stone Srm Corp.

5open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
49dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 49 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 49 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 65 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 293 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 414 days
Next cycle year 2027

Open violations

ECB / OATH (1) · $1,250 owed
IssuedViolationHearingBalance
Jun 10, 2026Unknown CLASS - 2
ELECTRICAL WORK WITHOUT PERMIT. AT A 3-STORY WALK UP OBSERVED INSTALLATION OF ELECTRICAL WIRING FOR A SPLIT SYSTEM AIR CONDITIONING UNIT, INCLUDING CONNECTION TO A DEDICATED CIRCUIT AND INSTALLATION OF AN EXTER
#39192039J
Sep 16, 2026
IN VIOLATION
$1,250
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (4) · C 0 · B 4 · A 0
IssuedClassViolationCorrect by
Jun 12, 2017BApt 3RDFL · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOWER SASH WINDOW IN THE KITCHEN LOCATED AT APT 3RDFL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 17, 2017
Jun 12, 2017BApt 3RDFL · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 17, 2017
Jun 12, 2017BApt 3RDFL · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFL, 3rd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 17, 2017
Aug 13, 2008BD26-19.07 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 50 WATTS FRONT.Sep 17, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 12, 2026, 12:44 AM ET. BBL 3054070029.

Look up another building